Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Castor Solar | ZGlobal Inc | Dustin Acres, CA | California Independent System Operator (CISO) | 917.0 MWh | Mar 2016 | Dec 2023 | Solar |
Colgate | Yuba County Water Agency | Dobbins, CA | California Independent System Operator (CISO) | 1.3 TWh | Sep 1969 | Aug 2024 | Water |
Chula Vista Energy Center | Wellhead Services, Inc | Chula Vista, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2001 | Dec 2023 | Natural Gas |
Chalk Cliff Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 19.3 GWh | Feb 1990 | Aug 2024 | Natural Gas |
CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 1.0 GWh | Nov 2018 | Dec 2023 | Solar |
Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 10.0 GWh | Jun 2013 | Dec 2023 | Landfill Gas |
Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2017 | Dec 2023 | Solar |
Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.4 GWh | Mar 2018 | Dec 2023 | Solar |
Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2018 | Dec 2023 | Solar |
Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 2.0 GWh | Dec 2013 | Dec 2023 | Solar |
Coachella Hills Wind | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 205.9 GWh | Feb 2021 | Aug 2024 | Wind |
Cameron Ridge LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 125.1 GWh | Nov 1984 | Dec 2023 | Wind |
CBS Television City | Televison City Studios, LLC. | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 7.7 GWh | Jun 2013 | Dec 2023 | Natural Gas : 85.2% Solar : 14.8% |
CDCR (CA) - Pleasant Valley State Prison | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 2.1 GWh | Jun 2014 | Dec 2023 | Solar |
Colgreen North Shore Solar Farm | Sunpin Holdings, LLC | Mecca, CA | Imperial Irrigation District (IID) | 138.3 GWh | Nov 2018 | Aug 2024 | Solar |
CDCR (CA) - Wasco State Prison | SunE Wasco SP Owner, LLC | Wasco, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2023 | Solar |
CDCR (CA) - Solano State Prison | SunE Solano SP Owner, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2023 | Solar |
City of Madera WWTP | SunE GIL1, LLC | Madera, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2009 | Sep 2023 | Solar |
Chuckawalla Valley State Prison | SunE CPA CDC1 LLC | Blythe, CA | California Independent System Operator (CISO) | 1.2 GWh | May 2006 | Dec 2023 | Solar |
CDCR (CA) - Corcoran State Prison | SunE Corcoran SP Owner, LLC | Corcoran, CA | California Independent System Operator (CISO) | 8.7 GWh | Nov 2013 | Dec 2023 | Solar |
City of Rosamond (CA) | Standard Solar | Rosamond, CA | California Independent System Operator (CISO) | 1.2 GWh | Apr 2023 | Dec 2023 | Solar |
Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 328.6 GWh | Sep 2013 | Dec 2023 | Solar |
Calipatria Solar Farm | Southern Power Co | Calipatria, CA | Imperial Irrigation District (IID) | 41.2 GWh | Jan 2016 | Oct 2023 | Solar |
Cal State Univ San Bernardino FC01 | Southern California Edison Co | San Bernardino, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2013 | Dec 2022 | Natural Gas |
Center Hybrid | Southern California Edison Co | Norwalk, CA | California Independent System Operator (CISO) | 4.3 GWh | Aug 2007 | Dec 2023 | Natural Gas |
County of San Diego COC Hybrid | Solar Star California LXXVIII, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2020 | Dec 2023 | Solar : 95.9% Electricity used for energy storage : 4.1% |
Cove Hydroelectric | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 14.4 GWh | Jan 1990 | Dec 2023 | Water |
California State Univ at Channel Islands | SkyHigh 2 Solar | Camarillo, CA | California Independent System Operator (CISO) | 7.7 GWh | Nov 2021 | Dec 2023 | Solar |
CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2021 | Dec 2023 | Solar |
Cabazon Wind Partners | Shell Wind Energy Inc. | Cabazon, CA | California Independent System Operator (CISO) | 118.0 GWh | Sep 2002 | Dec 2023 | Wind |
Cawelo Water District Solar | Scooby Solar, LLC | Famoso, CA | California Independent System Operator (CISO) | 927.0 MWh | Sep 2023 | Dec 2023 | Solar |
Cuyamaca Peak Energy Plant | San Diego Gas & Electric Co | El Cajon, CA | California Independent System Operator (CISO) | 12.1 GWh | Apr 2002 | Dec 2023 | Natural Gas |
Crafton Hills College Solar Farm | San Bernardino Comm College Dist | Yucaipa, CA | California Independent System Operator (CISO) | 55.0 MWh | May 2012 | Dec 2022 | Solar |
Carson Ice-Gen Project | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 71.3 GWh | Sep 1995 | Aug 2024 | Natural Gas : 99.9% |
Chili Bar | Sacramento Municipal Util Dist | Placerville, CA | California Independent System Operator (CISO) | 43.5 GWh | Feb 1965 | Dec 2023 | Water |
Cosumnes | Sacramento Municipal Util Dist | Herald, CA | Balancing Authority of Northern California (BANC) | 3.8 TWh | Jan 2006 | Aug 2024 | Natural Gas : 98.8% Other Biomass Gas : 1.2% |
Camino | Sacramento Municipal Util Dist | Camino, CA | Balancing Authority of Northern California (BANC) | 306.7 GWh | Sep 1963 | Aug 2024 | Water |
Copco 1 | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 71.4 GWh | Dec 1917 | Dec 2023 | Water |
Copco 2 | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 87.0 GWh | Jun 1925 | May 2023 | Water |
Caribou 2 | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 341.8 GWh | Oct 1958 | Aug 2024 | Water |
Colusa Generating Station | Pacific Gas & Electric Co. | Maxwell, CA | California Independent System Operator (CISO) | 3.0 TWh | Nov 2010 | Aug 2024 | Natural Gas |
Cantua Solar Station | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 33.9 GWh | May 2012 | Dec 2023 | Solar |
Coleman PH | Pacific Gas & Electric Co. | Anderson, CA | California Independent System Operator (CISO) | 34.1 GWh | May 1979 | Dec 2023 | Water |
Cow Creek | Pacific Gas & Electric Co. | Millville, CA | California Independent System Operator (CISO) | 5.9 GWh | Dec 1906 | Mar 2023 | Water |
Cresta | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 121.7 GWh | Oct 1949 | Dec 2023 | Water |
Caribou 1 | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 197.9 GWh | May 1921 | Dec 2023 | Water |
Cottonwood Solar, LLC (Goose Lake) | Onward Energy | Lost Hills, CA | California Independent System Operator (CISO) | 25.3 GWh | Apr 2015 | Dec 2023 | Solar |
Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 21.1 GWh | Apr 2015 | Dec 2023 | Solar |
CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 39.0 GWh | Nov 2014 | Dec 2023 | Solar |
Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 45.0 GWh | Jul 2015 | Dec 2023 | Solar |
Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.4 GWh | Apr 2016 | Nov 2023 | Solar |
Carlsbad Energy Center | NRG California Peaker Operations LLC | Carlsbad, CA | California Independent System Operator (CISO) | 250.5 GWh | Nov 2018 | Aug 2024 | Natural Gas |
Collierville Powerhouse | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 536.8 GWh | Oct 1989 | Aug 2024 | Water |
Combustion Turbine Project No 2 | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 6.6 GWh | Mar 1996 | Dec 2023 | Natural Gas |
Coram Tehachapi | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 4.3 GWh | Aug 1992 | Dec 2023 | Wind |
Coram Energy LLC | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 36.3 GWh | Dec 2004 | Dec 2023 | Wind |
Coram Energy LLC (ECT) | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 32.0 GWh | Apr 2005 | Dec 2023 | Wind |
Chicago Park | Nevada Irrigation District | Colfax, CA | California Independent System Operator (CISO) | 134.7 GWh | Oct 1965 | Dec 2023 | Water |
Combie South | Nevada Irrigation District | Auburn, CA | California Independent System Operator (CISO) | 6.8 GWh | Mar 1984 | Dec 2023 | Water |
CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2017 | Dec 2023 | Solar |
Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 65.3 GWh | Mar 2020 | Aug 2024 | Solar |
County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2023 | Solar |
Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 2019 | Dec 2023 | Solar |
CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2016 | Dec 2023 | Solar |
CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2016 | Dec 2023 | Solar |
California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 5.3 GWh | Jun 2018 | Dec 2023 | Solar |
Chambers 4 - Rialto LGB8 | MN8 Energy LLC | Rialto, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2018 | Dec 2023 | Solar |
Castaic Lake Phase II | MN8 Energy LLC | Santa Clara, CA | California Independent System Operator (CISO) | 7.8 GWh | Nov 2014 | Dec 2023 | Solar |
Chambers 4 - Sacramento SMF1 | MN8 Energy LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 4.2 GWh | Aug 2018 | Dec 2023 | Solar |
CSU Fresno Solar Project | MMA Fresno Power LP | Fresno, CA | California Independent System Operator (CISO) | 1.1 GWh | Nov 2007 | Dec 2023 | Solar |
Corona | Metropolitan Water District of S CA | Corona, CA | California Independent System Operator (CISO) | 4.1 GWh | Jul 1983 | Dec 2023 | Water |
Colon PV | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 1.4 GWh | Nov 2015 | Dec 2023 | Solar |
Castaic | Los Angeles Department of Water & Power | Castaic, CA | Los Angeles Department of Water and Power (LDWP) | 27.2 GWh | Dec 1971 | Aug 2024 | Water |
Control Gorge | Los Angeles Department of Water & Power | Bishop, CA | Los Angeles Department of Water and Power (LDWP) | 91.0 GWh | Mar 1952 | Dec 2023 | Water |
Cottonwood | Los Angeles Department of Water & Power | Lone Pine, CA | Los Angeles Department of Water and Power (LDWP) | 1.6 GWh | Oct 1908 | Aug 2023 | Water |
Calabasas Gas to Energy Facility | Los Angeles County Sanitation | Agoura, CA | California Independent System Operator (CISO) | 47.4 GWh | Jun 2010 | Dec 2023 | Landfill Gas |
Chaparral Springs | Leeward Asset Management, LLC | Rosamond, CA | California Independent System Operator (CISO) | 427.4 GWh | - | Aug 2024 | Solar |
Central Utilities Plant LAX 2 | LAX Airport | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 39.1 GWh | Sep 2015 | Aug 2024 | Natural Gas |
Coachella | Imperial Irrigation District | Coachella, CA | Imperial Irrigation District (IID) | 754.0 MWh | May 1973 | Dec 2023 | Natural Gas : 96.9% Distillate Fuel Oil : 3.1% |
Calistoga Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 467.3 GWh | Feb 1984 | Aug 2024 | Geothermal |
City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.3 GWh | Oct 2014 | Dec 2023 | Wind |
CA-DGS RFP-Salinas Valley State Prison | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 1.1 GWh | Oct 2023 | Dec 2023 | Solar |
CA-Ventura Co CCD-Oxnard College Canopy | Forefront Power, LLC | Ventura, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2022 | Dec 2023 | Solar |
CA - Ventura Co CCD - Moorpark College | Forefront Power, LLC | Moorpark, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2023 | Solar |
CA - Madera USD - Madera South HS | Forefront Power, LLC | Madera, CA | California Independent System Operator (CISO) | 462.0 MWh | Aug 2023 | Dec 2023 | Solar |
Cabrillo College | Forefront Power, LLC | Aptos, CA | California Independent System Operator (CISO) | 13.0 MWh | Nov 2023 | Dec 2023 | Solar |
CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.7 GWh | Apr 2023 | Dec 2023 | Solar |
CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 5.4 GWh | Feb 2022 | Dec 2023 | Solar |
Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 537.0 MWh | Nov 2011 | Dec 2023 | Solar |
Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 262.7 GWh | Nov 2012 | Dec 2023 | Solar |
CA Institute for Women | Ecoplexus, Inc | Chino, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2020 | Dec 2023 | Solar |
Centinela State Prison | Ecoplexus, Inc | Sacramento, CA | Imperial Irrigation District (IID) | 18.1 GWh | Nov 2019 | Dec 2023 | Solar |
CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2023 | Solar |
Calipatria State Prison | Ecoplexus, Inc | Calipatria, CA | Imperial Irrigation District (IID) | 17.8 GWh | Nov 2019 | Dec 2023 | Solar |
Camanche | East Bay Municipal Util Dist | Clements & Wallace, CA | California Independent System Operator (CISO) | 58.1 GWh | Jun 1983 | Dec 2023 | Water |
Childrens Hospital | DTE San Diego COGEN Inc. | San Diego, CA | California Independent System Operator (CISO) | 26.7 GWh | Mar 2000 | Aug 2024 | Natural Gas |
CID Solar (CA) | DG California Solar LLC | Corcoran, CA | California Independent System Operator (CISO) | 2.6 GWh | Aug 2019 | Dec 2023 | Solar |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 74.8 GWh | Oct 2017 | Aug 2024 | Solar |
CSUCI Site Authority | CSUCI Site Authority | Camarillo, CA | California Independent System Operator (CISO) | 956.0 MWh | Feb 1988 | Jul 2024 | Natural Gas |
Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 932.0 MWh | Oct 2023 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 4 | 11.1 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Madera County, CA | # 29 | 26 | 1.3 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.8 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
Kern County, CA | # 1 | 293 | 32.9 TWh |