Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 278.2 GWh | Jul 2019 | Jun 2024 | Solar |
Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.6 GWh | Nov 2017 | Dec 2023 | Solar |
Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 13.1 GWh | Nov 2016 | Dec 2023 | Solar |
Victor Mesa Linda B2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2014 | Dec 2023 | Solar |
Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.9 GWh | Jul 2016 | Dec 2023 | Solar |
Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 23.3 GWh | Nov 2016 | Dec 2023 | Solar |
Western Antelope Blue Sky Ranch A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.6 GWh | Oct 2014 | Dec 2023 | Solar |
Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 43.6 GWh | Jun 2016 | Dec 2023 | Solar |
Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.0 GWh | May 2021 | Dec 2023 | Solar |
Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.0 GWh | Nov 2017 | Dec 2023 | Solar |
Otoe Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2013 | Dec 2023 | Solar |
Powhatan Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2013 | Dec 2023 | Solar |
Navajo Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.4 GWh | Nov 2013 | Dec 2023 | Solar |
Industry Solar Power Generation Station 1 LLC | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.4 GWh | Nov 2013 | Dec 2023 | Solar |
Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.5 GWh | Nov 2017 | Dec 2023 | Solar |
Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 36.6 GWh | May 2021 | Dec 2023 | Solar |
SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.5 GWh | Nov 2019 | Dec 2023 | Solar |
SEPV Imperial Dixieland West | AES Distributed Energy | Imperial, CA | Imperial Irrigation District (IID) | 7.3 GWh | Nov 2016 | Dec 2023 | Solar |
Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2011 | Dec 2023 | Solar |
Tahquitz High School | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2012 | Dec 2023 | Solar |
Mountain View I & II | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 319.8 GWh | May 2001 | Jun 2024 | Wind |
Mountain View IV | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 182.7 GWh | Jan 2012 | Dec 2023 | Wind |
West Valley High School Solar | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2012 | Dec 2023 | Solar |
AES Huntington Beach Energy Project | AES Huntington Beach Energy, LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 2.6 TWh | Jan 2020 | Jun 2024 | Natural Gas |
AES Huntington Beach LLC | AES Huntington Beach LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 161.9 GWh | May 1958 | May 2024 | Natural Gas |
AES Redondo Beach LLC | AES Redondo Beach LLC | Redondo Beach, CA | California Independent System Operator (CISO) | 263.5 GWh | Sep 1954 | Dec 2023 | Natural Gas |
Wheeler Ridge | AFTW Holdings, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.4 GWh | Aug 2023 | Dec 2023 | Solar |
Wilmington Hydrogen Plant | Air Products & Chemicals Inc | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 319.0 GWh | Feb 1996 | Jun 2024 | Waste Heat |
Algonquin SKIC20 Solar LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 47.5 GWh | Apr 2015 | Dec 2023 | Solar |
Algonquin SKIC 10 Solar, LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 18.5 GWh | Dec 2016 | Dec 2023 | Solar |
Algonquin Power Sanger LLC | Algonquin Power Sanger LLC | Sanger, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2007 | Jun 2024 | Natural Gas |
Alpine Solar | Alpine Solar | Lancaster, CA | California Independent System Operator (CISO) | 167.8 GWh | Jan 2013 | Dec 2023 | Solar |
Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 366.3 MWh | Sep 2016 | Dec 2023 | Other Biomass Gas |
Alta Wind Energy Center I | Alta Wind Energy Center I | Mojave, CA | California Independent System Operator (CISO) | 397.5 GWh | Dec 2010 | Dec 2022 | Wind |
Alta Wind Energy Center II | Alta Wind Energy Center II | Mojave, CA | California Independent System Operator (CISO) | 361.9 GWh | Dec 2010 | Dec 2022 | Wind |
Alta Wind Energy Center III | Alta Wind Energy Center III | Mojave, CA | California Independent System Operator (CISO) | 362.9 GWh | Jan 2011 | Dec 2022 | Wind |
Alta Wind Energy Center IV | Alta Wind Energy Center IV | Mojave, CA | California Independent System Operator (CISO) | 184.2 GWh | Mar 2011 | Dec 2022 | Wind |
Alta Wind Energy Center V | Alta Wind Energy Center V | Mojave, CA | California Independent System Operator (CISO) | 252.9 GWh | Mar 2011 | Dec 2023 | Wind |
Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 392.2 GWh | Dec 2013 | Dec 2022 | Wind |
Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 272.2 GWh | Dec 2013 | Dec 2022 | Wind |
Blythe Energy Inc | AltaGas Blythe Operations Inc | Blythe, CA | California Independent System Operator (CISO) | 1.3 TWh | Nov 2003 | Jun 2024 | Natural Gas |
AltaGas Ripon Energy Inc. | AltaGas Ripon Energy Inc. | Ripon, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 1988 | Jun 2024 | Natural Gas |
Aerojet I | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 6.1 GWh | Nov 2009 | Dec 2023 | Solar |
Nickel 1 Solar Facility | Altus Power America Management, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 2.9 GWh | Oct 2012 | Dec 2023 | Solar |
Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2013 | Dec 2023 | Solar |
Aerojet II | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 3.9 GWh | May 2010 | Dec 2023 | Solar |
Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 4.1 GWh | Jan 2014 | Dec 2023 | Solar |
Valencia 1 Solar CA | Altus Power America Management, LLC | Westmorland, CA | Imperial Irrigation District (IID) | 4.6 GWh | Aug 2017 | Dec 2023 | Solar |
Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 5.6 GWh | Dec 2013 | Dec 2023 | Solar |
Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2013 | Dec 2023 | Solar |
Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.4 GWh | Dec 2013 | Dec 2023 | Solar |
Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
Chuckawalla Solar | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.1 GWh | May 2012 | Dec 2023 | Solar |
Ironwood Solar LLC | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 8.6 GWh | Mar 2012 | Dec 2023 | Solar |
Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.7 GWh | Feb 2013 | Dec 2023 | Solar |
Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 4.2 GWh | Mar 2013 | Dec 2023 | Solar |
PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2018 | Dec 2023 | Solar |
Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 3.9 GWh | Apr 2015 | Dec 2023 | Solar |
Terra Francesco | Altus Power America Management, LLC | Ontario, CA | California Independent System Operator (CISO) | 1.7 GWh | Feb 2015 | Dec 2023 | Solar |
Rancho Cucamonga Dist #1 | Altus Power America Management, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2015 | Dec 2023 | Solar |
Park Meridian #1 | Altus Power America Management, LLC | Riverside, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2015 | Dec 2023 | Solar |
Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 17.2 GWh | Jan 2013 | Dec 2023 | Landfill Gas |
Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 36.0 GWh | Oct 2010 | Dec 2023 | Landfill Gas |
Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 34.6 GWh | Jan 2014 | Dec 2023 | Landfill Gas |
Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 10.2 GWh | Apr 2013 | Dec 2023 | Landfill Gas |
Ameresco Keller Canyon | AMERESCO Keller Canyon LLC | Bay Point, CA | California Independent System Operator (CISO) | 30.7 GWh | Jun 2009 | Dec 2023 | Landfill Gas |
Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 91.9 GWh | Nov 2008 | Jun 2024 | Landfill Gas |
Foothill Sanitary Landfill - Solar Array | Ameresco San Joaquin Solar LLC | Linden, CA | PacifiCorp West (PACW) | 8.5 GWh | Dec 2020 | Dec 2022 | Solar |
Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 33.0 GWh | Mar 2014 | Dec 2023 | Landfill Gas |
Ameresco Santa Cruz Energy | AMERESCO Santa Cruz Energy LLC | Watsonville, CA | California Independent System Operator (CISO) | 20.2 GWh | Dec 2005 | Dec 2023 | Landfill Gas |
Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 34.2 GWh | Feb 2013 | Dec 2023 | Landfill Gas |
Ampersand Chowchilla Biomass LLC | Ampersand Chowchilla Biomass LLC | Chowchilla, CA | California Independent System Operator (CISO) | 58.4 GWh | Apr 2008 | Dec 2022 | Wood/Wood Waste Solids : 99.8% |
Anaheim Solar Energy Plant | Anaheim Public Utilities | Anaheim, CA | California Independent System Operator (CISO) | 3.1 GWh | Jul 2014 | Dec 2023 | Solar |
AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 28.9 GWh | Jul 2015 | Dec 2023 | Solar |
Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 16.3 GWh | May 2017 | Dec 2023 | Solar |
Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 27.8 GWh | May 2017 | Dec 2023 | Landfill Gas |
Aquamarine | Aquamarine Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 499.8 GWh | Aug 2021 | Jun 2024 | Solar |
Watson Cogeneration | ARCO Products Co-Watson | Carson, CA | California Independent System Operator (CISO) | 2.5 TWh | Nov 1987 | Jun 2024 | Natural Gas : 83.4% Other Gas : 15.6% Waste/Other Oil : 1.0% |
Beacon Solar Plant Site 5 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 103.5 GWh | Nov 2017 | Jun 2024 | Solar |
Beacon Solar Plant Site 2 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 127.8 GWh | Nov 2017 | Jun 2024 | Solar |
Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 225.2 GWh | Oct 2015 | Dec 2023 | Solar |
Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 4.8 GWh | Jul 2014 | Dec 2023 | Solar |
Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 760.6 MWh | Dec 2013 | Dec 2023 | Solar |
Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 58.1 GWh | Mar 2016 | Dec 2023 | Solar |
CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 360.2 GWh | Jan 2019 | Jun 2024 | Solar |
Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 512.5 GWh | Jun 2013 | Dec 2023 | Solar |
Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 31.1 GWh | Aug 2016 | Dec 2023 | Solar |
Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 30.5 GWh | Apr 2015 | Dec 2023 | Solar |
Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 45.5 GWh | Aug 2016 | Dec 2023 | Solar |
Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 58.5 GWh | Mar 2016 | Dec 2023 | Solar |
Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 3.4 GWh | Jun 2014 | Dec 2023 | Solar |
Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2014 | Dec 2023 | Solar |
Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 280.2 GWh | - | Jun 2024 | Solar |
SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2023 | Solar |
Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 557.6 GWh | Feb 2022 | Jun 2024 | Solar |
Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 294.1 GWh | Jul 2022 | Jun 2024 | Solar |
AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 628.8 GWh | Jul 2014 | Jun 2024 | Solar |
Manzana Wind LLC | Avangrid Renewables LLC | Rosamond, CA | California Independent System Operator (CISO) | 496.9 GWh | Nov 2012 | Dec 2023 | Wind |
Dillon Wind LLC | Avangrid Renewables LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 158.1 GWh | Mar 2008 | Dec 2023 | Wind |
Shiloh I Wind Project | Avangrid Renewables LLC | Rio Vista, CA | California Independent System Operator (CISO) | 440.9 GWh | Apr 2006 | Dec 2023 | Wind |
Browse Power Plants By California Counties
Figures are based on June 2024 generation numbers.County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 283 | 36.2 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 25 | 1.5 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Glenn County, CA | # 55 | 2 | 8.3 GWh |