Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Graniterock Quarry | CalCom Energy | Aromas, CA | California Independent System Operator (CISO) | 9.1 GWh | Aug 2022 | Dec 2023 | Solar |
Grapeland Hybrid | Southern California Edison Co | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2007 | Dec 2023 | Natural Gas |
Grassland 1&2 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.9 GWh | Jun 2013 | Dec 2023 | Solar |
Grassland 3&4 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Nov 2023 | Solar |
Grayson | City of Glendale - (CA) | Glendale, CA | Los Angeles Department of Water and Power (LDWP) | 35.5 GWh | Nov 1953 | Aug 2024 | Natural Gas |
Great Valley Solar Portfolio Holdings, LLC | Consolidated Edison Development Inc. | Cantua Creek, CA | California Independent System Operator (CISO) | 555.3 GWh | Nov 2017 | Aug 2024 | Solar |
Green Acres Solar Facility 1 | SIT Renewables, Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 4.8 GWh | Aug 2012 | Dec 2023 | Solar |
Green Acres Solar Facility 2 | SIT Renewables, Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Aug 2012 | Dec 2023 | Solar |
Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 6.2 GWh | Nov 2018 | Dec 2023 | Solar |
Green Beanworks C PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 7.2 GWh | Jul 2018 | Dec 2023 | Solar |
Green Beanworks D PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 6.3 GWh | Jul 2018 | Dec 2023 | Solar |
Green Power I | FPL Energy Green Power | North Palm Springs, CA | California Independent System Operator (CISO) | 318.0 MWh | Jun 1975 | Dec 2022 | Wind |
Greenleaf 1 | Calpine Greenleaf Holding, Inc. | Yuba City, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 1989 | Dec 2023 | Natural Gas |
Greenleaf 2 Power Plant | Greenleaf Energy LLC | Yuba City, CA | California Independent System Operator (CISO) | 35.1 GWh | Sep 1989 | Aug 2024 | Natural Gas |
Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2013 | Dec 2023 | Solar |
Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2013 | Dec 2023 | Solar |
Grizzly | City of Santa Clara - (CA) | N/A, CA | California Independent System Operator (CISO) | 1.9 GWh | Oct 1993 | Dec 2023 | Water |
Grossmont Hospital | Sharp Grossmont Hospital | La Mesa, CA | California Independent System Operator (CISO) | 27.5 GWh | Jul 1983 | Dec 2023 | Natural Gas |
Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2018 | Dec 2023 | Solar |
Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2018 | Dec 2023 | Solar |
Guernsey Solar Station | Pacific Gas & Electric Co. | Hanford, CA | California Independent System Operator (CISO) | 24.2 GWh | Jul 2013 | Dec 2023 | Solar |
H. Gonzales | City of Vernon | Vernon, CA | California Independent System Operator (CISO) | 297.9 MWh | Dec 1986 | Dec 2023 | Natural Gas |
Haas | Pacific Gas & Electric Co. | Balch Camp, CA | California Independent System Operator (CISO) | 543.6 GWh | Nov 1958 | Aug 2024 | Water |
Halsey | Pacific Gas & Electric Co. | Auburn, CA | California Independent System Operator (CISO) | 7.3 GWh | Nov 1916 | Dec 2022 | Water |
Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 4.6 GWh | Jul 2014 | Dec 2023 | Solar |
Hanford Energy Park Peaker | MRP San Joaquin Energy LLC. | Hanford, CA | California Independent System Operator (CISO) | 4.3 GWh | Aug 2001 | Aug 2024 | Natural Gas |
Harbor | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 163.1 GWh | Jun 1949 | Aug 2024 | Natural Gas |
Harbor Cogen | Harbor Cogeneration Co. | Wilmington, CA | California Independent System Operator (CISO) | 25.6 GWh | Nov 1988 | Dec 2023 | Natural Gas |
Hat Creek 1 | Pacific Gas & Electric Co. | Burney, CA | California Independent System Operator (CISO) | 22.8 GWh | Jul 1921 | Dec 2023 | Water |
Hat Creek 2 | Pacific Gas & Electric Co. | Burney, CA | California Independent System Operator (CISO) | 6.9 GWh | Aug 1921 | Dec 2023 | Water |
Hatchet Creek Project | Mega Renewables | Montgomery Creek, CA | California Independent System Operator (CISO) | 21.2 GWh | Nov 1986 | Jul 2023 | Water |
Hatchet Ridge Wind Project | Pattern Operators LP | Burney, CA | California Independent System Operator (CISO) | 248.5 GWh | Nov 2010 | Dec 2023 | Wind |
Haynes | Los Angeles Department of Water & Power | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 2.5 TWh | Aug 1962 | Aug 2024 | Natural Gas |
Haypress | EIF Haypress LLC | Sierra City, CA | California Independent System Operator (CISO) | 22.1 GWh | Nov 1988 | Aug 2023 | Water |
Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 58.4 GWh | Nov 2015 | Dec 2023 | Solar |
Heber Geothermal | ORCAL Geothermal, Inc | Heber, CA | Imperial Irrigation District (IID) | 250.1 GWh | May 1985 | Dec 2023 | Geothermal |
Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 25.5 GWh | Apr 2014 | Dec 2023 | Solar |
Hecate Energy Beacon Solar 1 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 129.0 GWh | Mar 2017 | Aug 2024 | Solar |
Hecate Energy Beacon Solar 3 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 133.3 GWh | Nov 2016 | Aug 2024 | Solar |
Hecate Energy Beacon Solar 4 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 113.7 GWh | Nov 2016 | Aug 2024 | Solar |
Heliocentric | Heliocentric LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2012 | Dec 2023 | Solar |
Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2017 | Dec 2023 | Solar |
Helzel & Schwarzhoff 86 | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 1986 | Dec 2023 | Wind |
Henrietta Peaker | MRP San Joaquin Energy LLC. | Lemoore, CA | California Independent System Operator (CISO) | 4.7 GWh | May 2002 | Aug 2024 | Natural Gas |
Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 234.2 GWh | Jul 2016 | Dec 2023 | Solar |
Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.3 GWh | Sep 2018 | Dec 2023 | Solar |
Hesperia | SunEdison LLC | Hesperia, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 2014 | Dec 2023 | Solar |
Hickman | Turlock Irrigation District | Hickman, CA | Turlock Irrigation District (TIDC) | 3.0 GWh | Aug 1979 | Dec 2023 | Water |
High Desert Power Plant | MRP Generation Holdings, LLC | Victorville, CA | California Independent System Operator (CISO) | 4.6 TWh | Mar 2003 | Aug 2024 | Natural Gas |
High Sierra Cogeneration Plant | Plumas Sierra Rural Electric Coop | Susanville, CA | California Independent System Operator (CISO) | 35.7 GWh | Jan 2010 | Dec 2023 | Natural Gas |
High Sierra Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 23.3 GWh | Feb 1989 | Dec 2023 | Natural Gas |
High Winds LLC | FPLE High Winds, LLC | Birds Landing, CA | California Independent System Operator (CISO) | 237.7 GWh | Jun 2003 | Dec 2023 | Wind |
HL Power | HL Power Company | Wendel, CA | California Independent System Operator (CISO) | 205.1 GWh | Jun 1989 | Dec 2023 | Wood/Wood Waste Solids : 99.7% |
HL Solar | HL Solar LLC | Wendel, CA | California Independent System Operator (CISO) | 10.9 GWh | May 2019 | Dec 2023 | Solar |
Hoag Hospital Cogen Plant | Hoag Memorial Presbyterian Hospital | Newport Beach, CA | California Independent System Operator (CISO) | 5.3 GWh | Jun 2006 | Feb 2024 | Natural Gas |
Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2014 | Dec 2023 | Solar |
Honda Torrance | Bloom Energy | Torrance, CA | California Independent System Operator (CISO) | 762.0 MWh | Nov 2012 | Dec 2023 | Natural Gas |
Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Sep 2013 | Dec 2023 | Solar |
Hudson - High Desert Hybrid | MN8 Energy LLC | Victorville, CA | California Independent System Operator (CISO) | 288.5 GWh | Nov 2021 | Aug 2024 | Solar |
Humboldt Bay | Pacific Gas & Electric Co. | Eureka, CA | California Independent System Operator (CISO) | 367.5 GWh | Aug 2010 | Aug 2024 | Natural Gas : 99.5% Distillate Fuel Oil : 0.5% |
Humboldt Sawmill Company | Mendocino Forest Products | Scotia, CA | California Independent System Operator (CISO) | 122.6 GWh | Dec 1937 | Aug 2024 | Wood/Wood Waste Solids : 99.7% |
Huron Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 31.3 GWh | May 2012 | Dec 2023 | Solar |
Hyperion Treatment Plant CHP Plant | Constellation New Energy Inc. | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 136.4 GWh | Mar 2017 | Aug 2024 | Other Biomass Gas : 59.0% Natural Gas : 41.0% |
IGS KSBD | Greenbacker Renewable Energy Corporation | Highland, CA | California Independent System Operator (CISO) | 9.0 GWh | Feb 2022 | Dec 2023 | Solar |
IGS SBD1 | Greenbacker Renewable Energy Corporation | Bloomington, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Jan 2023 | Dec 2023 | Solar |
IGS SBD2 | Greenbacker Renewable Energy Corporation | San Bernardino, CA | Los Angeles Department of Water and Power (LDWP) | 4.2 GWh | Jan 2023 | Dec 2023 | Solar |
IKEA Tejon 345 | IKEA Property Inc | Lebec, CA | California Independent System Operator (CISO) | 2.5 GWh | Mar 2011 | Dec 2023 | Solar |
Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 25.3 GWh | Aug 2019 | Dec 2023 | Natural Gas |
Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 277.2 GWh | Oct 2013 | Dec 2023 | Solar |
Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 388.3 GWh | Mar 2016 | Dec 2023 | Solar |
Imperial Valley Solar Co (IVSC) 2, LLC | Onward Energy | Niland, CA | Imperial Irrigation District (IID) | 38.3 GWh | May 2015 | Dec 2023 | Solar |
Imperial Valley Solar Company 1 LLC | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 32.9 GWh | May 2012 | Dec 2023 | Solar |
Imperial Valley Solar, LLC | Imperial Valley Solar, LLC | Calexico, CA | California Independent System Operator (CISO) | 346.4 GWh | Oct 2013 | Dec 2023 | Solar |
Improvement Dst No. 4 | Kern County Water Agency | Bakersfield, CA | California Independent System Operator (CISO) | 8.0 MWh | Dec 2008 | Dec 2022 | Solar |
Indian Valley Dam Hydro Project | Yolo County Flood Control WCD | Clearlake Oaks, CA | California Independent System Operator (CISO) | 5.9 GWh | Sep 1983 | Sep 2023 | Water |
Indigo Energy Facility | Diamond Generating Corporation | North Palm Springs, CA | California Independent System Operator (CISO) | 26.2 GWh | Jun 2001 | Dec 2023 | Natural Gas |
Industry MetroLink PV 1 | City of Industry | Industry, CA | California Independent System Operator (CISO) | 860.0 MWh | Mar 2012 | Dec 2023 | Solar |
Industry Solar Power Generation Station 1 LLC | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2023 | Solar |
Intel Folsom | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.4 GWh | Jun 2010 | Dec 2023 | Solar |
Intel Folsom Phase 2 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.7 GWh | Sep 2012 | Dec 2023 | Solar |
Intel Folsom Phase 3 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 8.7 GWh | Mar 2016 | Dec 2023 | Solar |
Intel Santa Clara | Bloom Energy | Santa Clara, CA | California Independent System Operator (CISO) | 7.3 GWh | Dec 2014 | Dec 2023 | Natural Gas |
IOS II-LAX9 | IOS II LLC | Fontana, CA | California Independent System Operator (CISO) | 7.5 GWh | Jan 2020 | Dec 2023 | Solar |
Iron Gate | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 81.5 GWh | Jan 1962 | Dec 2023 | Water |
Ironwood Solar LLC | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 8.2 GWh | Mar 2012 | Dec 2023 | Solar |
Irwindale Brew Yard, LLC | Irwindale Brew Yard, LLC | Irwindale, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2002 | Aug 2024 | Solar : 98.2% Other Biomass Gas : 1.8% |
Isabella Hydro Project | Isabella Partners | Lake Isabella, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 1990 | Mar 2023 | Water |
Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2013 | Dec 2023 | Solar |
Ivanpah 1 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 230.3 GWh | Nov 2013 | Aug 2024 | Solar : 95.2% Natural Gas : 4.8% |
Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 268.3 GWh | Nov 2013 | Aug 2024 | Solar : 96.4% Natural Gas : 3.6% |
Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 270.0 GWh | Nov 2013 | Aug 2024 | Solar : 96.9% Natural Gas : 3.1% |
IVC Solar | Imperial Irrigation District | Imperial, CA | Imperial Irrigation District (IID) | 3.7 GWh | Nov 2016 | Dec 2023 | Solar |
J.R. Simplot Company | J.R. Simplot Company | Lathrop, CA | California Independent System Operator (CISO) | 8.9 GWh | Sep 1993 | Dec 2023 | Waste Heat |
J S Eastwood | Southern California Edison Co | Shaver Lake, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 1987 | Aug 2024 | Water |
Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 43.2 GWh | Jun 2017 | Dec 2023 | Solar |
James B Black | Pacific Gas & Electric Co. | Big Bend, CA | California Independent System Operator (CISO) | 367.0 GWh | Nov 1965 | Aug 2024 | Water |
Java Solar, LLC | Java Solar, LLC | Lemoore, CA | California Independent System Operator (CISO) | 28.6 GWh | Oct 2022 | Dec 2023 | Solar |
Jaybird | Sacramento Municipal Util Dist | Camino, CA | Balancing Authority of Northern California (BANC) | 461.8 GWh | Mar 1961 | Aug 2024 | Water |
John L. Featherstone Plant | Hudson Ranch Power I LLC | Calipatria, CA | Imperial Irrigation District (IID) | 406.2 GWh | Feb 2012 | Aug 2024 | Geothermal |
Jones Fork | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 29.1 GWh | May 1985 | Dec 2023 | Water |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 293 | 32.9 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Plumas County, CA | # 27 | 13 | 1.8 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 26 | 1.3 TWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Mendocino County, CA | # 55 | 4 | 11.1 GWh |