Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 11.8 GWh | Sep 2017 | Dec 2023 | Solar |
Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 5.3 GWh | Sep 2017 | Dec 2023 | Solar |
CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 230.4 GWh | Oct 2017 | Aug 2024 | Solar |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 74.8 GWh | Oct 2017 | Aug 2024 | Solar |
Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 127.1 GWh | Oct 2017 | Aug 2024 | Wind |
Westmont 301 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Oct 2017 | Dec 2023 | Solar |
Westmont 401 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 4.5 GWh | Oct 2017 | Dec 2023 | Solar |
Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 71.7 GWh | Oct 2017 | Dec 2023 | Natural Gas |
Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 236.7 GWh | Oct 2017 | Dec 2023 | Natural Gas |
Beacon Solar Plant Site 5 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 93.1 GWh | Nov 2017 | Aug 2024 | Solar |
Beacon Solar Plant Site 2 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 113.0 GWh | Nov 2017 | Aug 2024 | Solar |
Great Valley Solar Portfolio Holdings, LLC | Consolidated Edison Development Inc. | Cantua Creek, CA | California Independent System Operator (CISO) | 555.3 GWh | Nov 2017 | Aug 2024 | Solar |
Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 44.9 GWh | Nov 2017 | Dec 2023 | Solar |
Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.6 GWh | Nov 2017 | Dec 2023 | Solar |
Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.4 GWh | Nov 2017 | Dec 2023 | Solar |
Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 42.0 GWh | Nov 2017 | Dec 2023 | Solar |
Marin Clean Energy Solar One | AES Distributed Energy | Richmond, CA | California Independent System Operator (CISO) | 19.9 GWh | Nov 2017 | Dec 2023 | Solar |
Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2017 | Dec 2023 | Wind |
Manteca Land PV | AES Distributed Energy | Manteca, CA | California Independent System Operator (CISO) | 444.0 MWh | Nov 2017 | Dec 2023 | Solar |
Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 990.0 MWh | Nov 2017 | Dec 2023 | Solar |
Bakersfield PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 6.7 GWh | Nov 2017 | Dec 2023 | Solar |
Bakersfield Industrial PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2017 | Dec 2023 | Solar |
Sacramento Regional County Sanitation PV | Tesla Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 7.4 GWh | Nov 2017 | Dec 2023 | Solar |
Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2017 | Dec 2023 | Solar |
Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 38.9 GWh | Nov 2017 | Dec 2023 | Solar |
UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2017 | Dec 2023 | Solar |
CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2017 | Dec 2023 | Solar |
Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 35.9 GWh | Nov 2017 | Dec 2023 | Natural Gas |
Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 38.2 GWh | Nov 2017 | Dec 2023 | Natural Gas |
Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 28.2 GWh | Nov 2017 | Dec 2023 | Natural Gas |
Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2023 | Solar |
Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2017 | Dec 2023 | Solar |
Tule Wind LLC | Avangrid Renewables LLC | Boulevard, CA | California Independent System Operator (CISO) | 342.5 GWh | Nov 2017 | Aug 2024 | Wind |
Panoche Valley Solar Farm | Consolidated Edison Development Inc. | Paicines, CA | California Independent System Operator (CISO) | 298.3 GWh | Dec 2017 | Aug 2024 | Solar |
Midway Solar Farm 1 | 83WI 8ME, LLC | Calipatria, CA | Imperial Irrigation District (IID) | 123.1 GWh | Dec 2017 | Aug 2024 | Solar |
Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.7 GWh | Dec 2017 | Dec 2023 | Solar |
Niagara Bottling Stockton | EnterSolar | Stockton, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2017 | Dec 2023 | Solar |
EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 29.2 GWh | Dec 2017 | Dec 2023 | Natural Gas |
ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2018 | Dec 2023 | Other Biomass Gas |
ABEC #3 dba Lakeview Dairy | ABEC #3 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 7.8 GWh | Jan 2018 | Dec 2023 | Other Biomass Gas |
ABEC #4 dba CE&S Dairy | ABEC #4 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2018 | Dec 2023 | Other Biomass Gas |
US GSA - Sacramento | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.2 GWh | Feb 2018 | Dec 2023 | Solar |
Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 26.2 GWh | Feb 2018 | Dec 2023 | Solar |
Tranquillity ID | Tranquillity Solar 1, LLC | Tranquillity, CA | California Independent System Operator (CISO) | 3.1 GWh | Feb 2018 | Dec 2023 | Solar |
Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2018 | Dec 2023 | Solar |
Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2018 | Dec 2023 | Solar |
Lavio Solar | Lavio Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.8 GWh | Mar 2018 | Dec 2023 | Solar |
Medline Ind. Phase 2 Tracy | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 2.0 GWh | Mar 2018 | Dec 2023 | Solar |
KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 14.4 GWh | Mar 2018 | Dec 2023 | Natural Gas |
Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2018 | Dec 2023 | Solar |
Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.4 GWh | Mar 2018 | Dec 2023 | Solar |
Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 700.0 MWh | Apr 2018 | Dec 2023 | Solar |
SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2023 | Solar |
PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2018 | Dec 2023 | Solar |
Central CA Fuel Cell 1 | Central CA Fuel Cell 1 | Tulare, CA | California Independent System Operator (CISO) | 18.0 GWh | Apr 2018 | Dec 2023 | Natural Gas |
KSR053 Cantara Fuel Cell | 2016 ESA Project Company, LLC | Panorama City, CA | California Independent System Operator (CISO) | 5.3 GWh | Apr 2018 | Dec 2023 | Natural Gas |
RPUWD Scheuer Well Solar Project | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2018 | Oct 2023 | Solar |
Santa Rosa Junior College Petaluma Solar | Sonoma County Junior College District | Petaluma, CA | California Independent System Operator (CISO) | 1.8 GWh | Jun 2018 | Dec 2023 | Solar |
Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 14.7 GWh | Jun 2018 | Dec 2023 | Natural Gas |
California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 5.3 GWh | Jun 2018 | Dec 2023 | Solar |
Green Beanworks C PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 7.2 GWh | Jul 2018 | Dec 2023 | Solar |
Green Beanworks D PV | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 6.3 GWh | Jul 2018 | Dec 2023 | Solar |
Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 6.0 GWh | Jul 2018 | Dec 2023 | Wind |
Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.4 GWh | Jul 2018 | Dec 2023 | Wind |
Aerolease | PCS Energy, LLC | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 1.9 GWh | Jul 2018 | Dec 2022 | Solar |
Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2018 | Dec 2023 | Solar |
Prologis L.P | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 2.7 GWh | Jul 2018 | Dec 2023 | Solar |
Midway Solar Farm III | Greenbacker Renewable Energy Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 48.9 GWh | Aug 2018 | Dec 2023 | Solar |
Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2018 | Dec 2023 | Solar |
PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 5.2 GWh | Aug 2018 | Dec 2023 | Solar |
AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 6.3 GWh | Aug 2018 | Dec 2023 | Natural Gas |
EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 20.6 GWh | Aug 2018 | Dec 2023 | Natural Gas |
TLR000 Hansen Fuel Cell | 2016 ESA Project Company, LLC | Salinas, CA | California Independent System Operator (CISO) | 8.3 GWh | Aug 2018 | Dec 2023 | Natural Gas |
Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 3.1 GWh | Aug 2018 | Dec 2023 | Solar |
Keysight - Santa Rosa | Bloom Energy | Santa Rosa, CA | California Independent System Operator (CISO) | 34.4 GWh | Aug 2018 | Dec 2023 | Natural Gas |
Chambers 4 - Sacramento SMF1 | MN8 Energy LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 4.2 GWh | Aug 2018 | Dec 2023 | Solar |
San Joaquin Solar | GASNA 6P, LLC | Helm, CA | California Independent System Operator (CISO) | 37.2 GWh | Sep 2018 | Dec 2023 | Solar |
SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 3.8 GWh | Sep 2018 | Dec 2023 | Solar |
Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.3 GWh | Sep 2018 | Dec 2023 | Solar |
Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 608.6 GWh | Oct 2018 | Aug 2024 | Solar |
Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.5 GWh | Oct 2018 | Dec 2023 | Solar |
Colgreen North Shore Solar Farm | Sunpin Holdings, LLC | Mecca, CA | Imperial Irrigation District (IID) | 138.3 GWh | Nov 2018 | Aug 2024 | Solar |
Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 245.7 GWh | Nov 2018 | Aug 2024 | Solar |
Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 6.2 GWh | Nov 2018 | Dec 2023 | Solar |
Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 473.5 GWh | Nov 2018 | Aug 2024 | Wind |
Voyager Wind III | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 142.9 GWh | Nov 2018 | Aug 2024 | Wind |
Voyager Wind IV | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 70.2 GWh | Nov 2018 | Dec 2023 | Wind |
Wistaria Ranch Solar | Consolidated Edison Development Inc. | Calexico, CA | California Independent System Operator (CISO) | 295.2 GWh | Nov 2018 | Aug 2024 | Solar |
UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 8.5 GWh | Nov 2018 | Dec 2023 | Solar |
County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2023 | Solar |
Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2018 | Dec 2023 | Solar |
Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2023 | Solar |
Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2018 | Dec 2023 | Solar |
Xebec 1 | AES Distributed Energy | Sun Valley, CA | Los Angeles Department of Water and Power (LDWP) | 2.7 GWh | Nov 2018 | Dec 2023 | Solar |
Francisco St. Solar | AES Distributed Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 1.8 GWh | Nov 2018 | Dec 2023 | Solar |
CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 1.0 GWh | Nov 2018 | Dec 2023 | Solar |
Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 7.8 GWh | Nov 2018 | Dec 2023 | Natural Gas |
Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2018 | Dec 2023 | Solar |
SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2023 | Solar |
Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2018 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 293 | 32.9 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Plumas County, CA | # 27 | 13 | 1.8 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 26 | 1.3 TWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Mendocino County, CA | # 55 | 4 | 11.1 GWh |