Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 8.9 GWh | Sep 2016 | Dec 2023 | Solar |
Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 366.3 MWh | Sep 2016 | Dec 2023 | Other Biomass Gas |
DirecTV - Los Angeles | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 7.7 GWh | Sep 2016 | Dec 2023 | Natural Gas |
AT&T - Hawthorne | Bloom Energy | Hawthorne, CA | California Independent System Operator (CISO) | 6.3 GWh | Sep 2016 | Dec 2023 | Natural Gas |
Building F | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2016 | Dec 2023 | Solar |
Buidling L | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 958.3 MWh | Oct 2016 | Dec 2023 | Solar |
RE Garland | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 451.8 GWh | Oct 2016 | Dec 2022 | Solar |
AT&T - Hayward | Bloom Energy | Hayward, CA | California Independent System Operator (CISO) | 7.8 GWh | Oct 2016 | Dec 2023 | Natural Gas |
Pio Pico Energy Center | Pio Pico Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 102.2 GWh | Oct 2016 | Dec 2023 | Natural Gas |
Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 23.3 GWh | Nov 2016 | Dec 2023 | Solar |
Rio Bravo Solar 1 LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 48.4 GWh | Nov 2016 | Dec 2023 | Solar |
Rio Bravo Solar II LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 50.0 GWh | Nov 2016 | Dec 2023 | Solar |
Hecate Energy Beacon Solar 3 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 149.1 GWh | Nov 2016 | Jun 2024 | Solar |
Hecate Energy Beacon Solar 4 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 126.7 GWh | Nov 2016 | Jun 2024 | Solar |
Western Antelope Blue Sky B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 51.6 GWh | Nov 2016 | Dec 2023 | Solar |
North Lancaster Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 30.0 GWh | Nov 2016 | Dec 2023 | Solar |
Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 106.9 GWh | Nov 2016 | Jun 2024 | Solar |
RE Astoria | RE Astoria LLC | Rosamond, CA | California Independent System Operator (CISO) | 279.5 GWh | Nov 2016 | Jun 2024 | Solar |
RE Astoria 2 | RE Astoria 2 LLC | Rosamond, CA | California Independent System Operator (CISO) | 191.4 GWh | Nov 2016 | Jun 2024 | Solar |
CED Ducor 1 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 49.6 GWh | Nov 2016 | Dec 2023 | Solar |
CED Ducor 2 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 49.1 GWh | Nov 2016 | Dec 2023 | Solar |
CED Ducor 3 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 37.6 GWh | Nov 2016 | Dec 2023 | Solar |
CED Ducor 4 | Consolidated Edison Development Inc. | Ducor, CA | California Independent System Operator (CISO) | 48.8 GWh | Nov 2016 | Dec 2023 | Solar |
AVS Lancaster 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 8.6 GWh | Nov 2016 | Dec 2023 | Solar |
US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 7.3 GWh | Nov 2016 | Dec 2023 | Solar |
Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 212.8 GWh | Nov 2016 | Jun 2024 | Solar |
Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 123.7 GWh | Nov 2016 | Jun 2024 | Solar |
Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 13.1 GWh | Nov 2016 | Dec 2023 | Solar |
Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 12.2 GWh | Nov 2016 | Dec 2023 | Natural Gas |
Longboat Solar, LLC | Duke Energy Renewables Services | Barstow, CA | California Independent System Operator (CISO) | 27.0 GWh | Nov 2016 | Dec 2023 | Solar |
Valley Center | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2016 | Dec 2023 | Solar |
Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 156.4 GWh | Nov 2016 | Jun 2024 | Solar |
Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 164.3 GWh | Nov 2016 | Jun 2024 | Solar |
SEPV Imperial Dixieland West | AES Distributed Energy | Imperial, CA | Imperial Irrigation District (IID) | 7.3 GWh | Nov 2016 | Dec 2023 | Solar |
SEPV Imperial Dixieland East | AES Distributed Energy | Imperial, CA | Imperial Irrigation District (IID) | 5.5 GWh | Nov 2016 | Dec 2023 | Solar |
Valley Sanitary District WTP Solar | Tesla Inc. | Indio, CA | Los Angeles Department of Water and Power (LDWP) | 1.6 GWh | Nov 2016 | Dec 2023 | Solar |
Solar Star California, XLIV, LLC | MN8 Energy LLC | Pearblossom, CA | California Independent System Operator (CISO) | 25.5 GWh | Nov 2016 | Dec 2023 | Solar |
Westmont 300B | Westmont Solar, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.9 GWh | Nov 2016 | Dec 2022 | Solar |
Owens Valley Solar Project 11 | Los Angeles Department of Water & Power | Olancha, CA | Los Angeles Department of Water and Power (LDWP) | 2.7 GWh | Nov 2016 | Dec 2022 | Solar |
CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2016 | Dec 2023 | Solar |
CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2016 | Dec 2023 | Solar |
IVC Solar | Imperial Irrigation District | Imperial, CA | Imperial Irrigation District (IID) | 5.4 GWh | Nov 2016 | Dec 2022 | Solar |
Fremont - Kato Rd | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 2.4 GWh | Nov 2016 | Dec 2023 | Solar |
Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2016 | Dec 2022 | Solar |
University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2016 | Dec 2023 | Natural Gas |
Wildwood Solar II | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 38.1 GWh | Dec 2016 | Dec 2023 | Solar |
Oro Loma | Consolidated Edison Development Inc. | Oro Loma, CA | California Independent System Operator (CISO) | 27.5 GWh | Dec 2016 | Dec 2023 | Solar |
CED Avenal | Consolidated Edison Development Inc. | Avenal, CA | California Independent System Operator (CISO) | 9.5 GWh | Dec 2016 | Dec 2023 | Solar |
Algonquin SKIC 10 Solar, LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 18.5 GWh | Dec 2016 | Dec 2023 | Solar |
CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2023 | Solar |
Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 40.3 GWh | Jan 2017 | Dec 2023 | Solar |
Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 18.1 GWh | Jan 2017 | Dec 2023 | Solar |
Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.6 GWh | Jan 2017 | Dec 2023 | Solar |
Chaffey College Rancho Cucamonga Campus | Chaffey Community College District | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 8.2 GWh | Jan 2017 | Dec 2022 | Solar |
FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 9.4 GWh | Jan 2017 | Dec 2023 | Natural Gas |
Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 56.6 GWh | Feb 2017 | Dec 2022 | Solar |
NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 51.6 GWh | Feb 2017 | Dec 2022 | Solar |
Westmont 300A | Westmont Solar, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.9 GWh | Feb 2017 | Dec 2022 | Solar |
Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 6.4 GWh | Feb 2017 | Dec 2023 | Solar |
Disney Prospect | Bloom Energy | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 8.2 GWh | Feb 2017 | Dec 2023 | Natural Gas |
Hecate Energy Beacon Solar 1 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 144.8 GWh | Mar 2017 | Jun 2024 | Solar |
Lancaster WAD B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 5.2 GWh | Mar 2017 | Dec 2023 | Solar |
Solar Blythe 2 | NRG Solar Blythe II LLC | Blythe, CA | California Independent System Operator (CISO) | 42.4 GWh | Mar 2017 | Dec 2023 | Solar |
Hyperion Treatment Plant CHP Plant | Constellation New Energy Inc. | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 143.8 GWh | Mar 2017 | Jun 2024 | Other Biomass Gas : 56.9% Natural Gas : 43.1% |
Ramona Solar Energy | San Diego Gas & Electric Co | Ramona, CA | California Independent System Operator (CISO) | 2.7 GWh | Mar 2017 | Dec 2023 | Solar |
ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 7.6 GWh | Mar 2017 | Dec 2023 | Natural Gas |
Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 11.6 GWh | Mar 2017 | Dec 2023 | Natural Gas |
Maclay Solar Project | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 901.7 MWh | Mar 2017 | Aug 2023 | Solar |
Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 7.7 GWh | Apr 2017 | Dec 2023 | Landfill Gas |
Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 76.4 GWh | Apr 2017 | Jun 2024 | Solar |
Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 13.0 GWh | Apr 2017 | Dec 2023 | Solar |
Amazon - Patterson PV | AES Distributed Energy | Patterson, CA | Balancing Authority of Northern California (BANC) | 2.2 GWh | Apr 2017 | Dec 2023 | Solar |
APP Prune A-D | Bloom Energy | Cupertino, CA | California Independent System Operator (CISO) | 29.4 GWh | Apr 2017 | Dec 2023 | Natural Gas |
Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 16.3 GWh | May 2017 | Dec 2023 | Solar |
Giffen Solar Park | Giffen Solar Park, LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 23.1 GWh | May 2017 | Dec 2023 | Solar |
Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 27.8 GWh | May 2017 | Dec 2023 | Landfill Gas |
PVN Milliken, LLC | PVN Milliken, LLC | Ontario, CA | California Independent System Operator (CISO) | 4.9 GWh | May 2017 | Dec 2023 | Solar |
Kaiser Napa Valley Corporate Dr Fuel Cell | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 41.4 GWh | May 2017 | Dec 2023 | Natural Gas |
Dept of General Services -FTB | California PV Energy 2, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 5.5 GWh | Jun 2017 | Dec 2023 | Solar |
Jacumba Solar Farm | AEP Renewables | Jacumba, CA | California Independent System Operator (CISO) | 44.8 GWh | Jun 2017 | Dec 2023 | Solar |
USPS PV | USPS LA Solar FiT A & B | Los Angeles, CA | California Independent System Operator (CISO) | 13.1 GWh | Jun 2017 | Dec 2022 | Solar |
Westmont 400A | Westmont Solar, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Jun 2017 | Dec 2022 | Solar |
Westmont 400B | Westmont Solar, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Jun 2017 | Dec 2022 | Solar |
ATT Van Nyus | Bloom Energy | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 7.9 GWh | Jun 2017 | Dec 2023 | Natural Gas |
Preferred Freezer San Leandro | EnterSolar | San Leandro, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2017 | Dec 2023 | Solar |
Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.8 GWh | Jul 2017 | Dec 2023 | Solar |
Van der Hoek Solar Array/ Dairy | Maas Energy Works | Helm, CA | California Independent System Operator (CISO) | 189.3 MWh | Jul 2017 | Dec 2022 | Solar |
Aspiration G | AES Distributed Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 21.1 GWh | Aug 2017 | Dec 2023 | Solar |
Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.5 GWh | Aug 2017 | Dec 2022 | Solar |
SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2023 | Solar |
Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 4.2 GWh | Aug 2017 | Dec 2023 | Wind |
Valencia 1 Solar CA | Altus Power America Management, LLC | Westmorland, CA | Imperial Irrigation District (IID) | 4.6 GWh | Aug 2017 | Dec 2023 | Solar |
One Ten Partners PV | One Ten Partners, LLC | Palmdale, CA | California Independent System Operator (CISO) | 5.6 GWh | Aug 2017 | Dec 2023 | Solar |
Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 18.0 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 8.4 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.6 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 9.5 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.6 GWh | Aug 2017 | Dec 2023 | Natural Gas |
SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 12.4 GWh | Sep 2017 | Dec 2023 | Solar |
Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 5.5 GWh | Sep 2017 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on June 2024 generation numbers.County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 283 | 36.2 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 25 | 1.5 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Glenn County, CA | # 55 | 2 | 8.3 GWh |