Valencia 3 | Greenbacker Renewable Energy Corporation | Imperial, CA | Imperial Irrigation District (IID) | 8.3 GWh | Mar 2021 | Dec 2023 | Solar |
IVC Solar | Imperial Irrigation District | Imperial, CA | Imperial Irrigation District (IID) | 3.7 GWh | Nov 2016 | Dec 2023 | Solar |
SEPV Imperial Dixieland East | AES Distributed Energy | Imperial, CA | Imperial Irrigation District (IID) | 5.3 GWh | Nov 2016 | Dec 2023 | Solar |
SEPV Imperial Dixieland West | AES Distributed Energy | Imperial, CA | Imperial Irrigation District (IID) | 7.0 GWh | Nov 2016 | Dec 2023 | Solar |
Valley Sanitary District WTP Solar | Tesla Inc. | Indio, CA | Los Angeles Department of Water and Power (LDWP) | 1.5 GWh | Nov 2016 | Dec 2023 | Solar |
Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 319.2 GWh | Mar 2013 | Oct 2024 | Natural Gas |
Industry MetroLink PV 1 | City of Industry | Industry, CA | California Independent System Operator (CISO) | 860.0 MWh | Mar 2012 | Dec 2023 | Solar |
Coso Energy Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 277.3 GWh | Nov 1988 | Dec 2023 | Geothermal |
Coso Power Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 323.0 GWh | Oct 1989 | Oct 2024 | Geothermal |
Coso Finance Partners | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 393.2 GWh | Jun 1987 | Oct 2024 | Geothermal |
B Braun Medical | B Braun Medical Inc | Irvine, CA | California Independent System Operator (CISO) | 27.2 GWh | Oct 1982 | Dec 2023 | Natural Gas |
UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 111.4 GWh | Jun 2007 | Oct 2024 | Natural Gas |
ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 7.0 GWh | Mar 2017 | Dec 2023 | Natural Gas |
Bowerman Power LFG, LLC | Bowerman Power LFG, LLC | Irvine, CA | California Independent System Operator (CISO) | 161.1 GWh | Mar 2016 | Dec 2023 | Landfill Gas |
Irwindale Brew Yard, LLC | Irwindale Brew Yard, LLC | Irwindale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2002 | Oct 2024 | Solar : 97.6% Other Biomass Gas : 2.4% |
Electra | Pacific Gas & Electric Co. | Jackson, CA | California Independent System Operator (CISO) | 309.1 GWh | May 1948 | Oct 2024 | Water |
Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 43.2 GWh | Jun 2017 | Dec 2023 | Solar |
Sonora 1 | Greenbacker Renewable Energy Corporation | Jamestown, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2013 | Dec 2023 | Solar |
Pacific-Ultrapower Chinese Station | IHI Power Services Corp | Jamestown, CA | California Independent System Operator (CISO) | 141.3 GWh | Sep 1986 | Oct 2024 | Wood/Wood Waste Solids : 99.6% |
Tulloch | Oakdale&South San Joaquin Irrigation D. | Jamestown, CA | California Independent System Operator (CISO) | 124.9 GWh | May 1958 | Dec 2023 | Water |
New Melones | U S Bureau of Reclamation | Jamestown, CA | Balancing Authority of Northern California (BANC) | 512.4 GWh | May 1979 | Oct 2024 | Water |
Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 53.0 GWh | Dec 2013 | Dec 2023 | Solar |
Rush Creek | Southern California Edison Co | June lake, CA | California Independent System Operator (CISO) | 40.4 GWh | Sep 1916 | Dec 2023 | Water |
Dulles | Golden Springs Development Company LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 2.2 GWh | Aug 2016 | Dec 2023 | Solar |
Kern River 3 | Southern California Edison Co | Kernville, CA | California Independent System Operator (CISO) | 184.5 GWh | Feb 1921 | Dec 2023 | Water |
Kettleman Solar -Centaurus | EE Kettleman California LLC | Kettleman City, CA | California Independent System Operator (CISO) | 37.7 GWh | Jun 2015 | Dec 2023 | Solar |
King City Power Plant | Calpine King City Cogen LLC | King City, CA | California Independent System Operator (CISO) | 46.9 GWh | Jan 1989 | Oct 2024 | Natural Gas |
King City Peaking | Calpine Corp-King City | King City, CA | California Independent System Operator (CISO) | 12.2 GWh | Mar 2002 | Dec 2023 | Natural Gas |
Blackjack Solar | South County Packing | King City, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2020 | Dec 2023 | Solar |
Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2013 | Dec 2023 | Solar |
Kingsburg Cogen | KES Kingsburg LP | Kingsburg, CA | California Independent System Operator (CISO) | 4.6 GWh | Nov 1990 | Dec 2023 | Natural Gas |
Don Pedro | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 472.9 GWh | Apr 1971 | Oct 2024 | Water |
Upper Dawson | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 11.5 GWh | Oct 1983 | Dec 2023 | Water |
La Grange | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 8.2 GWh | Nov 1924 | Dec 2023 | Water |
Kroger La Habra | Ralph's Grocery Company | La Habra, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2020 | Dec 2023 | Solar |
Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2008 | Dec 2023 | Solar |
University of California San Diego Hybrid | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 222.2 GWh | Jun 2001 | Oct 2024 | Natural Gas |
Grossmont Hospital | Sharp Grossmont Hospital | La Mesa, CA | California Independent System Operator (CISO) | 27.5 GWh | Jul 1983 | Dec 2023 | Natural Gas |
PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2018 | Dec 2023 | Solar |
Biola University Hybrid | Biola University | La Mirada, CA | California Independent System Operator (CISO) | 11.7 GWh | Mar 1990 | Oct 2024 | Natural Gas |
Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 1.5 GWh | Feb 2009 | Dec 2023 | Solar |
Gilead Sciences La Verne Rooftop Solar | Gilead Sciences, Inc. - La Verne | La Verne, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2021 | Dec 2022 | Solar |
Weymouth Solar Plant | Metropolitan Water District of S CA | La Verne, CA | California Independent System Operator (CISO) | 5.0 GWh | May 2016 | Dec 2023 | Solar |
Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2022 | Dec 2023 | Solar |
Isabella Hydro Project | Isabella Partners | Lake Isabella, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 1990 | Mar 2023 | Water |
MM Lopez Energy | MM Lopez Energy LLC | Lake View Terrace, CA | California Independent System Operator (CISO) | 26.4 GWh | Nov 1998 | Dec 2023 | Landfill Gas |
Slate Creek | Central Rivers Power US, LLC | Lakehead, CA | PacifiCorp West (PACW) | 11.0 GWh | Apr 1990 | Dec 2023 | Water |
Portal | Southern California Edison Co | Lakeshore, CA | California Independent System Operator (CISO) | 21.2 GWh | Nov 1956 | Dec 2023 | Water |
Alpine Solar | Alpine Solar | Lancaster, CA | California Independent System Operator (CISO) | 161.0 GWh | Jan 2013 | Dec 2023 | Solar |
TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Feb 2013 | Dec 2023 | Solar |
AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 570.9 GWh | Jul 2014 | Oct 2024 | Solar |
Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 99.2 GWh | Nov 2023 | Oct 2024 | Solar |
Raceway Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 218.0 GWh | - | Oct 2024 | Solar |
Central Antelope Dry Ranch C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 28.8 GWh | Apr 2016 | Dec 2023 | Solar |
Green Beanworks B PV | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 6.2 GWh | Nov 2018 | Dec 2023 | Solar |
North Lancaster Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 28.9 GWh | Nov 2016 | Dec 2023 | Solar |
Western Antelope Blue Sky B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.3 GWh | Nov 2016 | Dec 2023 | Solar |
US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2016 | Dec 2023 | Solar |
Lancaster Solar 1 | PsomasFMG Lancaster Solar Crest, LLC | Lancaster, CA | California Independent System Operator (CISO) | 1.7 GWh | Oct 2014 | Dec 2023 | Solar |
Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 36.2 GWh | Aug 2019 | Dec 2023 | Solar |
Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 244.2 GWh | Nov 2018 | Oct 2024 | Solar |
Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 688.0 MWh | Aug 2015 | Dec 2023 | Solar |
Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.2 GWh | May 2014 | Nov 2023 | Solar |
Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.8 GWh | Jul 2016 | Dec 2023 | Solar |
Summer Solar LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 40.9 GWh | Jun 2016 | Dec 2023 | Solar |
Summer Solar B2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2014 | Dec 2023 | Solar |
AVS Lancaster 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2016 | Dec 2023 | Solar |
Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 99.0 GWh | Nov 2016 | Oct 2024 | Solar |
Summer Solar A2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.4 GWh | May 2014 | Dec 2023 | Solar |
Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 26.2 GWh | Feb 2018 | Dec 2023 | Solar |
Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.9 GWh | Oct 2022 | Dec 2023 | Solar |
Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.1 GWh | Nov 2014 | Dec 2023 | Solar |
Summer Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.0 GWh | Jun 2014 | Dec 2023 | Solar |
Radiance Solar 5 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2013 | Mar 2023 | Solar |
Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.6 GWh | Nov 2016 | Dec 2023 | Solar |
Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 114.6 GWh | Nov 2016 | Oct 2024 | Solar |
Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 192.3 GWh | Nov 2016 | Oct 2024 | Solar |
Summer Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 1.8 GWh | May 2014 | Dec 2023 | Solar |
San Pablo Raceway | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 262.1 GWh | Jul 2019 | Oct 2024 | Solar |
Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2014 | Dec 2023 | Solar |
TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 53.4 GWh | Oct 2014 | Dec 2023 | Solar |
Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.6 GWh | Nov 2017 | Dec 2023 | Solar |
Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 7.2 GWh | Aug 2017 | Dec 2023 | Solar |
Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.7 GWh | May 2014 | Dec 2023 | Solar |
Radiance Solar 4 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2023 | Solar |
SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 14.5 GWh | Mar 2020 | Dec 2023 | Electricity used for energy storage : 53.9% Solar : 46.1% |
Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2013 | Dec 2023 | Solar |
Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 33.9 GWh | Oct 2015 | Dec 2023 | Solar |
Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 34.7 GWh | May 2021 | Dec 2023 | Solar |
Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.4 GWh | Nov 2017 | Dec 2023 | Solar |
Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 957.0 MWh | Nov 2011 | Dec 2023 | Solar |
Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.4 GWh | May 2021 | Dec 2023 | Solar |
Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.2 GWh | Sep 2013 | Dec 2023 | Solar |
Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Sep 2013 | Dec 2023 | Solar |
Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.5 GWh | Oct 2018 | Dec 2023 | Solar |
Lancaster Solar 2 | PsomasFMG Lancaster Solar Crest, LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2023 | Solar |
CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2023 | Solar |
Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 38.6 GWh | Jan 2017 | Dec 2023 | Solar |
Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 17.1 GWh | Jan 2017 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on October 2024 generation numbers.County | State Rank | Active Plants | Oct 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 293 | 32.8 TWh |
Los Angeles County, CA | # 2 | 290 | 21.4 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.8 TWh |
Contra Costa County, CA | # 4 | 50 | 15.0 TWh |
San Bernardino County, CA | # 5 | 196 | 14.5 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Shasta County, CA | # 9 | 46 | 7.0 TWh |
Sacramento County, CA | # 10 | 63 | 6.5 TWh |
San Diego County, CA | # 11 | 148 | 5.8 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
Santa Clara County, CA | # 13 | 73 | 4.7 TWh |
Monterey County, CA | # 14 | 29 | 4.6 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Kings County, CA | # 16 | 54 | 3.7 TWh |
Orange County, CA | # 17 | 58 | 3.5 TWh |
Tuolumne County, CA | # 18 | 23 | 3.5 TWh |
Colusa County, CA | # 19 | 3 | 3.0 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Alameda County, CA | # 21 | 43 | 2.6 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
Plumas County, CA | # 26 | 13 | 1.9 TWh |
El Dorado County, CA | # 27 | 15 | 1.8 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Oct 2024 Generation |
---|---|---|---|
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Madera County, CA | # 30 | 26 | 1.2 TWh |
Lake County, CA | # 31 | 10 | 901.2 GWh |
Amador County, CA | # 32 | 7 | 837.8 GWh |
Tulare County, CA | # 33 | 53 | 819.3 GWh |
Ventura County, CA | # 34 | 30 | 803.6 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Calaveras County, CA | # 36 | 6 | 743.9 GWh |
Merced County, CA | # 37 | 25 | 590.9 GWh |
Humboldt County, CA | # 38 | 10 | 468.7 GWh |
Trinity County, CA | # 39 | 5 | 405.4 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Santa Barbara County, CA | # 42 | 18 | 329.8 GWh |
Siskiyou County, CA | # 43 | 8 | 321.3 GWh |
Mariposa County, CA | # 44 | 2 | 296.6 GWh |
San Benito County, CA | # 45 | 5 | 292.6 GWh |
Yolo County, CA | # 46 | 15 | 226.6 GWh |
San Mateo County, CA | # 47 | 10 | 128.9 GWh |
San Francisco County, CA | # 48 | 10 | 76.2 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 64.7 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Mendocino County, CA | # 55 | 4 | 11.1 GWh |