Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Life Technologies Carlsbad | Bloom Energy | Carlsbad, CA | California Independent System Operator (CISO) | 8.4 GWh | Jul 2012 | Dec 2023 | Natural Gas |
Taylor Farms Salinas | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2013 | Dec 2023 | Solar |
Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 4.1 GWh | Jan 2014 | Dec 2023 | Solar |
Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.4 GWh | Dec 2013 | Dec 2023 | Solar |
Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 5.6 GWh | Dec 2013 | Dec 2023 | Solar |
Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2013 | Dec 2023 | Solar |
G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 11.9 GWh | May 2013 | Dec 2023 | Landfill Gas |
Radiance Solar 4 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2023 | Solar |
Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 35.0 GWh | Feb 2013 | Dec 2023 | Solar |
Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.7 GWh | Feb 2013 | Dec 2023 | Solar |
Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 4.2 GWh | Mar 2013 | Dec 2023 | Solar |
Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 36.7 GWh | Jul 2013 | Dec 2023 | Solar |
Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 10.9 GWh | Jun 2013 | Dec 2023 | Landfill Gas |
Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 10.2 GWh | Apr 2013 | Dec 2023 | Landfill Gas |
Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 26.6 GWh | Apr 2014 | Dec 2023 | Solar |
Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 24.8 GWh | Nov 2014 | Dec 2023 | Solar |
Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.2 GWh | May 2015 | Dec 2023 | Solar |
Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.8 GWh | May 2015 | Dec 2023 | Solar |
CSU Northridge Plant | California State University, Northridge | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 862.7 MWh | Nov 2001 | Dec 2023 | Solar |
Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 512.5 GWh | Jun 2013 | Dec 2023 | Solar |
Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 34.2 GWh | Feb 2013 | Dec 2023 | Landfill Gas |
Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 33.0 GWh | Mar 2014 | Dec 2023 | Landfill Gas |
Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 34.6 GWh | Jan 2014 | Dec 2023 | Landfill Gas |
Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 2013 | Dec 2023 | Solar |
Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.3 GWh | Aug 2013 | Dec 2023 | Solar |
Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 2.2 GWh | Jun 2013 | Dec 2023 | Solar |
Rutan | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.8 GWh | Dec 2013 | Dec 2023 | Solar |
Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2023 | Solar |
Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.3 GWh | Sep 2013 | Dec 2023 | Solar |
Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.1 GWh | Sep 2013 | Dec 2023 | Solar |
Watts 3115 | CD US Solar MT 2 LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2013 | Dec 2023 | Solar |
Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 343.1 GWh | Sep 2013 | Dec 2023 | Solar |
RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 51.4 GWh | Dec 2013 | Dec 2023 | Solar |
RE Rosamond Two LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 39.7 GWh | Dec 2013 | Dec 2023 | Solar |
RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 9.9 GWh | Nov 2013 | Dec 2023 | Solar |
RE Columbia 3 LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 22.8 GWh | Dec 2013 | Dec 2023 | Solar |
Chuckawalla Solar | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 7.1 GWh | May 2012 | Dec 2023 | Solar |
Bear Creek Solar | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 4.0 GWh | Jan 2014 | Dec 2023 | Solar |
Vintner Solar | Ecos Energy LLC | Templeton, CA | California Independent System Operator (CISO) | 4.1 GWh | Mar 2014 | Dec 2023 | Solar |
Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.8 GWh | Mar 2014 | Dec 2023 | Solar |
Ironwood Solar LLC | Altus Power America Management, LLC | Blythe, CA | California Independent System Operator (CISO) | 8.6 GWh | Mar 2012 | Dec 2023 | Solar |
City of Hayward WWTP | City of Hayward | Hayward, CA | California Independent System Operator (CISO) | 11.0 GWh | Oct 2010 | Dec 2023 | Other Biomass Gas : 66.5% Solar : 29.9% Natural Gas : 3.6% |
Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 562.6 MWh | Nov 2011 | Dec 2023 | Solar |
Garnet Solar Generation Station I LLC | Garnet Solar Generation Station I LLC | Palm Springs, CA | California Independent System Operator (CISO) | 6.2 GWh | Nov 2014 | Dec 2023 | Solar |
Community Solar 1 | Community Solar I | Brawley, CA | Imperial Irrigation District (IID) | 13.9 GWh | May 2014 | Dec 2023 | Solar |
Sonora 1 | Greenbacker Renewable Energy Corporation | Jamestown, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2013 | Dec 2023 | Solar |
Oltmans SCE at Champagne | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 2013 | Dec 2023 | Solar |
Oltmans SCE at Jurupa | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2013 | Dec 2023 | Solar |
Sierra Nevada Brewing Co Hybrid | Sierra Nevada Brewing Co | Chico, CA | California Independent System Operator (CISO) | 10.0 GWh | Apr 2005 | Dec 2023 | Natural Gas : 76.2% Solar : 23.8% |
Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 55.2 GWh | Dec 2013 | Dec 2023 | Solar |
Solar Gen 2 Solar Facility | Southern Power Co | Calipatria, CA | California Independent System Operator (CISO) | 393.3 GWh | Oct 2014 | Dec 2023 | Solar |
One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2003 | Dec 2023 | Natural Gas |
Industry Solar Power Generation Station 1 LLC | AES Distributed Energy | Adelanto, CA | California Independent System Operator (CISO) | 4.4 GWh | Nov 2013 | Dec 2023 | Solar |
Navajo Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.4 GWh | Nov 2013 | Dec 2023 | Solar |
Powhatan Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.1 GWh | Nov 2013 | Dec 2023 | Solar |
Otoe Solar Power Generation Station 1 LLC | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2013 | Dec 2023 | Solar |
Westlands Solar PV Farm | Westlands Solar Farms, LLC | Huron, CA | California Independent System Operator (CISO) | 39.5 GWh | Jan 2014 | Dec 2023 | Solar |
Transamerica Pyramid | Transamerica Pyramid Properties LLC | San Francisco, CA | California Independent System Operator (CISO) | 667.1 MWh | Jun 2007 | Dec 2023 | Natural Gas |
Western Antelope Blue Sky Ranch A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.6 GWh | Oct 2014 | Dec 2023 | Solar |
Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 23.3 GWh | Nov 2016 | Dec 2023 | Solar |
Monterey Regional Water Pollution Control Agency | Tesla Inc. | Marina, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2010 | Dec 2023 | Solar |
Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2011 | Dec 2023 | Solar |
Sacramento Fairbain Water Treatment Plant | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.2 GWh | Jan 2013 | Dec 2023 | Solar |
Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 760.6 MWh | Dec 2013 | Dec 2023 | Solar |
Stateline Solar | Southern Power Co | Nipton, CA | California Independent System Operator (CISO) | 644.4 GWh | Nov 2015 | Dec 2023 | Solar |
Mira Loma | Costco Wholesale | Mira Loma, CA | California Independent System Operator (CISO) | 2.8 GWh | Oct 2011 | Dec 2023 | Solar |
ABEC Bidart-Old River LLC | ABEC Bidart-Old River LLC | Bakersfield, CA | California Independent System Operator (CISO) | 17.1 GWh | Nov 2013 | Dec 2023 | Other Biomass Gas |
Lost Hills/Blackwell | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 80.7 GWh | Mar 2015 | Dec 2023 | Solar |
North Star Solar | Southern Power Co | Mendota, CA | California Independent System Operator (CISO) | 141.7 GWh | May 2015 | Dec 2023 | Solar |
Orion Solar I | Orion Solar I LLC | Arvin, CA | California Independent System Operator (CISO) | 30.1 GWh | Mar 2014 | Dec 2023 | Solar |
Orion Solar II | Orion Solar II, LLC | Arvin, CA | California Independent System Operator (CISO) | 19.0 GWh | May 2014 | Dec 2023 | Solar |
North Bay Solar 1 | AES Distributed Energy | Fairfield, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2013 | Dec 2023 | Solar |
Lancaster Dry Farm Ranch B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 9.9 GWh | Oct 2014 | Dec 2023 | Solar |
Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.6 GWh | Apr 2014 | Dec 2023 | Solar |
Rodeo Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.6 GWh | Apr 2014 | Dec 2023 | Solar |
Summer Solar A2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | May 2014 | Dec 2023 | Solar |
Summer Solar B2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.4 GWh | May 2014 | Dec 2023 | Solar |
Summer Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2014 | Dec 2023 | Solar |
Summer Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.0 GWh | Jun 2014 | Dec 2023 | Solar |
Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.6 GWh | Nov 2014 | Dec 2023 | Solar |
Expressway Solar A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2014 | Dec 2023 | Solar |
Expressway Solar B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.2 GWh | Apr 2014 | Dec 2023 | Solar |
Expressway Solar C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Dec 2023 | Solar |
Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 29.2 GWh | Sep 2015 | Dec 2023 | Solar |
Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2023 | Solar |
Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 7.3 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 9.4 GWh | Nov 2013 | Dec 2023 | Solar |
Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2015 | Dec 2023 | Solar |
MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 48.1 GWh | Jan 2003 | Dec 2023 | Natural Gas |
2081 Terzian Solar Project | Solarenewal LLC | Reedley, CA | California Independent System Operator (CISO) | 2.1 GWh | Jan 2014 | Dec 2023 | Solar |
2127 Harris Solar Project | Solarenewal LLC | Live Oak, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2014 | Dec 2023 | Solar |
2097 Helton Solar Project | Solarenewal LLC | Merced, CA | California Independent System Operator (CISO) | 2.7 GWh | Mar 2014 | Dec 2023 | Solar |
Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
Intel Folsom Phase 2 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.8 GWh | Sep 2012 | Dec 2023 | Solar |
Laguna Water Reclamation Facility | City of Santa Rosa | Santa Rosa, CA | California Independent System Operator (CISO) | 15.4 GWh | Feb 2013 | Dec 2023 | Other Biomass Gas : 85.0% Natural Gas : 15.0% |
Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2023 | Solar |
Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 243.7 GWh | Jul 2016 | Dec 2023 | Solar |
RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 122.6 GWh | Nov 2014 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on June 2024 generation numbers.County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 283 | 36.2 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 25 | 1.5 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Glenn County, CA | # 55 | 2 | 8.3 GWh |