Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Hanford Energy Park Peaker | MRP San Joaquin Energy LLC. | Hanford, CA | California Independent System Operator (CISO) | 4.2 GWh | Aug 2001 | Sep 2024 | Natural Gas |
Mountain View I & II | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 277.3 GWh | May 2001 | Sep 2024 | Wind |
Los Esteros Critical Energy Center | Los Esteros Critical Energy Facility LLC | San Jose, CA | California Independent System Operator (CISO) | 245.7 GWh | Jan 2003 | Sep 2024 | Natural Gas |
Henrietta Peaker | MRP San Joaquin Energy LLC. | Lemoore, CA | California Independent System Operator (CISO) | 5.0 GWh | May 2002 | Sep 2024 | Natural Gas |
Valero Refinery Cogeneration Unit 1 | Valero Refining Co California | Benicia, CA | California Independent System Operator (CISO) | 181.8 GWh | Sep 2002 | Sep 2024 | Natural Gas : 80.1% Other Gas : 19.9% |
Tracy Combined Cycle Power Plant | MRP San Joaquin Energy LLC. | Tracy, CA | California Independent System Operator (CISO) | 952.7 GWh | Mar 2003 | Sep 2024 | Natural Gas |
Cosumnes | Sacramento Municipal Util Dist | Herald, CA | Balancing Authority of Northern California (BANC) | 3.8 TWh | Jan 2006 | Sep 2024 | Natural Gas : 98.9% Other Biomass Gas : 1.1% |
Palomar Energy | San Diego Gas & Electric Co | Escondido, CA | California Independent System Operator (CISO) | 1.2 TWh | Sep 2005 | Sep 2024 | Natural Gas |
Donald Von Raesfeld Power Plant | City of Santa Clara - (CA) | Santa Clara, CA | California Independent System Operator (CISO) | 895.3 GWh | Feb 2005 | Sep 2024 | Natural Gas |
WWTP Power Generation Station | East Bay Municipal Util Dist | Oakland, CA | California Independent System Operator (CISO) | 27.2 GWh | Jul 1985 | Sep 2024 | Other Biomass Gas : 99.0% Distillate Fuel Oil : 1.0% |
Malburg | City of Vernon | Vernon, CA | California Independent System Operator (CISO) | 333.2 GWh | Sep 2005 | Sep 2024 | Natural Gas |
Magnolia Power Project | City of Burbank Water and Power | Burbank, CA | Los Angeles Department of Water and Power (LDWP) | 1.5 TWh | Aug 2005 | Sep 2024 | Natural Gas |
THUMS | THUMS Long Beach Company | Long Beach, CA | California Independent System Operator (CISO) | 346.3 GWh | Dec 2002 | Sep 2024 | Natural Gas |
Walnut Energy Center | Turlock Irrigation District | Turlock, CA | Turlock Irrigation District (TIDC) | 1.5 TWh | Jan 2006 | Sep 2024 | Natural Gas |
SJ/SC WPCP | San Jose/Santa Clara Water P C | San Jose, CA | California Independent System Operator (CISO) | 82.9 GWh | Jan 1953 | Sep 2024 | Other Biomass Gas : 51.0% Natural Gas : 48.8% |
Miramar Energy Facility | San Diego Gas & Electric Co | San Diego, CA | California Independent System Operator (CISO) | 12.4 GWh | May 2005 | Sep 2024 | Natural Gas |
Malaga Power LLC | CalPeak Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 10.8 GWh | Aug 2005 | Sep 2024 | Natural Gas |
Roseville Energy Park | City of Roseville - (CA) | Roseville, CA | Balancing Authority of Northern California (BANC) | 439.7 GWh | Oct 2007 | Sep 2024 | Natural Gas |
Russell City Energy Center | Russell City Energy Company LLC | Hayward, CA | California Independent System Operator (CISO) | 1.7 TWh | Jul 2013 | Sep 2024 | Natural Gas |
Gateway Generating Station | Pacific Gas & Electric Co. | Antioch, CA | California Independent System Operator (CISO) | 2.9 TWh | Dec 2008 | Sep 2024 | Natural Gas |
Colusa Generating Station | Pacific Gas & Electric Co. | Maxwell, CA | California Independent System Operator (CISO) | 3.0 TWh | Nov 2010 | Sep 2024 | Natural Gas |
Panoche Energy Center | Panoche Energy Center, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 1.2 TWh | May 2009 | Sep 2024 | Natural Gas |
Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 83.1 GWh | Nov 2008 | Sep 2024 | Landfill Gas |
Canyon Power Plant | City of Anaheim - (CA) | Anaheim, CA | California Independent System Operator (CISO) | 83.7 GWh | Jul 2011 | Sep 2024 | Natural Gas |
Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 270.0 GWh | Nov 2013 | Sep 2024 | Solar : 96.2% Natural Gas : 3.8% |
Ivanpah 1 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 236.1 GWh | Nov 2013 | Sep 2024 | Solar : 95.3% Natural Gas : 4.7% |
Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 278.0 GWh | Nov 2013 | Sep 2024 | Solar : 96.5% Natural Gas : 3.5% |
UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 111.6 GWh | Jun 2007 | Sep 2024 | Natural Gas |
Marsh Landing Generating Station | Marsh Landing LLC | Antioch, CA | California Independent System Operator (CISO) | 163.3 GWh | Apr 2013 | Sep 2024 | Natural Gas |
Mojave Solar Project | Mojave Solar LLC | Hinkley, CA | California Independent System Operator (CISO) | 627.0 GWh | Nov 2014 | Sep 2024 | Solar |
Panoche Valley Solar Farm | Consolidated Edison Development Inc. | Paicines, CA | California Independent System Operator (CISO) | 297.9 GWh | Dec 2017 | Sep 2024 | Solar |
AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 571.8 GWh | Jul 2014 | Sep 2024 | Solar |
Genesis Solar Energy Project | Genesis Solar LLC | Blythe, CA | California Independent System Operator (CISO) | 613.8 GWh | Oct 2013 | Sep 2024 | Solar |
John L. Featherstone Plant | Hudson Ranch Power I LLC | Calipatria, CA | Imperial Irrigation District (IID) | 408.3 GWh | Feb 2012 | Sep 2024 | Geothermal |
Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 528.1 GWh | Apr 2013 | Sep 2024 | Natural Gas |
Mariposa Energy Project | Diamond Generating Corporation | Byron, CA | California Independent System Operator (CISO) | 96.4 GWh | Sep 2012 | Sep 2024 | Natural Gas |
Ocotillo Express LLC | Pattern Operators LP | Ocotillo, CA | California Independent System Operator (CISO) | 532.7 GWh | Nov 2012 | Sep 2024 | Wind |
Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 336.7 GWh | Mar 2013 | Sep 2024 | Natural Gas |
Algonquin Power Sanger LLC | Algonquin Power Sanger LLC | Sanger, CA | California Independent System Operator (CISO) | 8.3 GWh | Nov 2007 | Sep 2024 | Natural Gas |
CCCSD Wastewater Treatment Plnt | Central Contra Costa Sanitary District | Martinez, CA | California Independent System Operator (CISO) | 21.0 GWh | Nov 1995 | Sep 2024 | Natural Gas |
University of California San Diego Hybrid | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 221.8 GWh | Jun 2001 | Sep 2024 | Natural Gas |
Oxnard Paper Mill | New-Indy, Oxnard LLC | Oxnard, CA | California Independent System Operator (CISO) | 191.7 GWh | Feb 1986 | Sep 2024 | Natural Gas |
Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 1.1 TWh | Mar 2013 | Sep 2024 | Solar |
Signal Hill West Unit | Signal Hill Petroleum, Inc | Signal Hill, CA | California Independent System Operator (CISO) | 35.7 GWh | Jun 2004 | Sep 2024 | Other Gas |
Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 4.9 GWh | Oct 2001 | Sep 2024 | Natural Gas |
El Segundo Energy Center LLC | El Segundo Energy Center, LLC | El Segundo, CA | California Independent System Operator (CISO) | 154.3 GWh | Jun 2013 | Sep 2024 | Natural Gas |
Tule Wind LLC | Avangrid Renewables LLC | Boulevard, CA | California Independent System Operator (CISO) | 335.3 GWh | Nov 2017 | Sep 2024 | Wind |
Lodi Energy Center | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 829.1 GWh | Oct 2012 | Sep 2024 | Natural Gas |
Brea Expansion Plant | Brea Power II | Brea, CA | California Independent System Operator (CISO) | 245.4 GWh | Oct 2012 | Sep 2024 | Landfill Gas |
Irwindale Brew Yard, LLC | Irwindale Brew Yard, LLC | Irwindale, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2002 | Sep 2024 | Solar : 98.0% Other Biomass Gas : 2.0% |
Kern Oil & Refining Co | Kern Oil & Refining Co | Bakersfield, CA | California Independent System Operator (CISO) | 34.5 GWh | Sep 2002 | Sep 2024 | Natural Gas |
Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 690.0 MWh | Nov 2012 | Sep 2024 | Wind |
Foundation Wal-Mart Red Bluff | Foundation CA Fund VI Manager LLC | Red Bluff, CA | California Independent System Operator (CISO) | 1.8 GWh | Aug 2012 | Sep 2024 | Wind |
CSUF Trigeneration | California State University at Fullerton | Fullerton, CA | California Independent System Operator (CISO) | 34.7 GWh | Sep 2010 | Sep 2024 | Natural Gas : 82.3% Solar : 17.7% |
Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 69.2 GWh | Dec 1995 | Sep 2024 | Natural Gas |
C&H Sugar Plant | C&H Sugar Company Inc | Crockett, CA | California Independent System Operator (CISO) | 38.7 GWh | Sep 1957 | Sep 2024 | Purchased Steam |
Central Utilities Plant LAX 2 | LAX Airport | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 39.5 GWh | Sep 2015 | Sep 2024 | Natural Gas |
Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 870.3 GWh | Feb 2014 | Sep 2024 | Solar |
Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 708.8 GWh | Feb 2014 | Sep 2024 | Solar |
Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 116.8 GWh | Jul 2014 | Sep 2024 | Landfill Gas |
Carlsbad Energy Center | NRG California Peaker Operations LLC | Carlsbad, CA | California Independent System Operator (CISO) | 254.2 GWh | Nov 2018 | Sep 2024 | Natural Gas |
SC 1 Data Center, Phase 2 | Xeres Ventures LLC | Santa Clara, CA | California Independent System Operator (CISO) | 208.0 MWh | Aug 2011 | Sep 2024 | Distillate Fuel Oil |
Beacon Solar Plant Site 5 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 93.2 GWh | Nov 2017 | Sep 2024 | Solar |
Beacon Solar Plant Site 2 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 112.3 GWh | Nov 2017 | Sep 2024 | Solar |
Hecate Energy Beacon Solar 1 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 128.8 GWh | Mar 2017 | Sep 2024 | Solar |
Hecate Energy Beacon Solar 3 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 132.9 GWh | Nov 2016 | Sep 2024 | Solar |
Hecate Energy Beacon Solar 4 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 114.0 GWh | Nov 2016 | Sep 2024 | Solar |
Golden Acorn Casino | Foundation HA Energy Generation, LLC | Campo, CA | California Independent System Operator (CISO) | 4.3 GWh | Jun 2014 | Sep 2024 | Wind |
Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Sep 2024 | Wind |
W Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 32.9 GWh | Jun 2005 | Sep 2024 | Natural Gas |
Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 354.7 GWh | Nov 2019 | Sep 2024 | Solar |
Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 117.4 GWh | May 2020 | Sep 2024 | Solar |
Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 83.5 GWh | Nov 2020 | Sep 2024 | Solar |
North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 387.7 GWh | May 2019 | Sep 2024 | Solar |
Great Valley Solar Portfolio Holdings, LLC | Consolidated Edison Development Inc. | Cantua Creek, CA | California Independent System Operator (CISO) | 555.5 GWh | Nov 2017 | Sep 2024 | Solar |
Elevation Solar C | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 98.5 GWh | Nov 2016 | Sep 2024 | Solar |
RE Astoria | RE Astoria LLC | Rosamond, CA | California Independent System Operator (CISO) | 233.5 GWh | Nov 2016 | Sep 2024 | Solar |
RE Astoria 2 | RE Astoria 2 LLC | Rosamond, CA | California Independent System Operator (CISO) | 160.7 GWh | Nov 2016 | Sep 2024 | Solar |
CA Flats Solar 130, LLC | California Flats Solar 130, LLC | Shandon, CA | California Independent System Operator (CISO) | 228.5 GWh | Oct 2017 | Sep 2024 | Solar |
CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 327.6 GWh | Jan 2019 | Sep 2024 | Solar |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 74.5 GWh | Oct 2017 | Sep 2024 | Solar |
Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 331.9 GWh | Jun 2016 | Sep 2024 | Solar |
Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 346.5 GWh | Apr 2020 | Sep 2024 | Solar |
Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 302.6 GWh | Oct 2020 | Sep 2024 | Solar |
Solverde 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 194.0 GWh | Nov 2016 | Sep 2024 | Solar |
Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 115.2 GWh | Nov 2016 | Sep 2024 | Solar |
Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 64.1 GWh | Apr 2017 | Sep 2024 | Solar |
Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 234.2 GWh | Dec 2018 | Sep 2024 | Solar |
Midway Solar Farm 1 | 83WI 8ME, LLC | Calipatria, CA | Imperial Irrigation District (IID) | 124.2 GWh | Dec 2017 | Sep 2024 | Solar |
Springbok 3 Solar Farm Hybrid | 64KT 8me LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 244.9 GWh | Jun 2019 | Sep 2024 | Solar |
Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 139.5 GWh | Nov 2016 | Sep 2024 | Solar |
Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 148.3 GWh | Nov 2016 | Sep 2024 | Solar |
Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 373.8 GWh | Nov 2019 | Sep 2024 | Wind |
Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 1.8 GWh | Jun 2020 | Sep 2024 | Natural Gas |
American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 325.3 GWh | Nov 2020 | Sep 2024 | Solar |
Colgreen North Shore Solar Farm | Sunpin Holdings, LLC | Mecca, CA | Imperial Irrigation District (IID) | 134.3 GWh | Nov 2018 | Sep 2024 | Solar |
Hyperion Treatment Plant CHP Plant | Constellation New Energy Inc. | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 135.8 GWh | Mar 2017 | Sep 2024 | Other Biomass Gas : 59.7% Natural Gas : 40.3% |
Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 610.3 GWh | Oct 2018 | Sep 2024 | Solar |
Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 123.2 GWh | Oct 2017 | Sep 2024 | Wind |
Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 245.8 GWh | Nov 2018 | Sep 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2024 generation numbers.County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 293 | 33.2 TWh |
Los Angeles County, CA | # 2 | 290 | 21.3 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.6 TWh |
Riverside County, CA | # 6 | 158 | 13.8 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Sacramento County, CA | # 10 | 63 | 6.5 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
Monterey County, CA | # 13 | 29 | 4.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.7 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Kings County, CA | # 16 | 54 | 3.6 TWh |
Orange County, CA | # 17 | 58 | 3.5 TWh |
Tuolumne County, CA | # 18 | 23 | 3.5 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
Plumas County, CA | # 26 | 13 | 1.8 TWh |
El Dorado County, CA | # 27 | 15 | 1.8 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Madera County, CA | # 30 | 26 | 1.2 TWh |
Lake County, CA | # 31 | 10 | 902.9 GWh |
Amador County, CA | # 32 | 7 | 866.5 GWh |
Tulare County, CA | # 33 | 53 | 818.8 GWh |
Ventura County, CA | # 34 | 30 | 817.1 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Calaveras County, CA | # 36 | 6 | 749.2 GWh |
Merced County, CA | # 37 | 25 | 704.1 GWh |
Humboldt County, CA | # 38 | 10 | 487.8 GWh |
Trinity County, CA | # 39 | 5 | 389.5 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Santa Barbara County, CA | # 43 | 18 | 317.8 GWh |
San Benito County, CA | # 44 | 5 | 313.0 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Yolo County, CA | # 46 | 15 | 226.6 GWh |
San Mateo County, CA | # 47 | 10 | 129.6 GWh |
San Francisco County, CA | # 48 | 10 | 76.9 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 64.7 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Mendocino County, CA | # 55 | 4 | 11.1 GWh |