Directory of Power Plants in California

List of All California Power Plants

Displaying Results 1,201 to 1,300 of 1,555
Plant NameUtilityLocationBalancing AuthorityAnnual GenerationPlant DateLast UpdateFuel Types
CA-DGS-California Men's ColonyForefront Power, LLCSan Luis Obispo, CACalifornia Independent System Operator (CISO)3.7 GWhApr 2023Dec 2023 Solar
CA - Fresno County - Juvenile HallForefront Power, LLCFresno, CACalifornia Independent System Operator (CISO)5.7 GWhFeb 2022Dec 2023 Solar
Calibrant Bakersfield LLCBay4 Energy Services, LLCBakersfield, CACalifornia Independent System Operator (CISO)2.4 GWhJan 2022Dec 2023 Solar
Orange Coast College PH2 Solar ProjectSolar Star Coastal Pirate, LLCCosta Mesa, CACalifornia Independent System Operator (CISO)4.6 GWhApr 2022Dec 2023 Solar : 88.9% Electricity used for energy storage : 11.1%
CA - Madera USD - Madera South HSForefront Power, LLCMadera, CACalifornia Independent System Operator (CISO)462.0 MWhAug 2023Dec 2023 Solar
POM Juice SolarWonderful Renewable Energy, LLC.Fresno, CACalifornia Independent System Operator (CISO)358.2 MWhJun 2021Dec 2023 Solar
POM Beverage SolarWonderful Renewable Energy, LLC.Del Rey, CACalifornia Independent System Operator (CISO)4.1 GWhJun 2021Dec 2023 Solar
Dover DairyRenewable Solar, IncHanford, CACalifornia Independent System Operator (CISO)2.9 GWhApr 2022Dec 2023 Solar
Ventura SolarVentura Solar LLCFillmore, CACalifornia Independent System Operator (CISO)6.5 GWhAug 2021Dec 2023 Solar
Wonderful NurseryWonderful Renewable Energy, LLC.Wasco, CACalifornia Independent System Operator (CISO)5.5 GWhJun 2021Dec 2023 Solar
Java Solar, LLCJava Solar, LLCLemoore, CACalifornia Independent System Operator (CISO)28.6 GWhOct 2022Dec 2023 Solar
Sheep Creek Community Solar FarmPhelan Solar LLCEl Mirage, CACalifornia Independent System Operator (CISO)1.8 GWhJul 2023Dec 2023 Solar
IGS SBD1Greenbacker Renewable Energy CorporationBloomington, CALos Angeles Department of Water and Power (LDWP)5.0 GWhJan 2023Dec 2023 Solar
IGS SBD2Greenbacker Renewable Energy CorporationSan Bernardino, CALos Angeles Department of Water and Power (LDWP)4.2 GWhJan 2023Dec 2023 Solar
POM Plant 1Wonderful Renewable Energy, LLC.Del Rey, CACalifornia Independent System Operator (CISO)2.1 GWhNov 2021Dec 2023 Solar
POM Plant 2Wonderful Renewable Energy, LLC.Del Rey, CACalifornia Independent System Operator (CISO)292.0 MWhNov 2021Dec 2023 Solar
Lake Elsinore Canopies - Lakeside HSStandard SolarLake Elsinore, CACalifornia Independent System Operator (CISO)2.0 GWhFeb 2022Dec 2023 Solar
Wonderful FirebaughWonderful Renewable Energy, LLC.Firebaugh, CACalifornia Independent System Operator (CISO)10.6 GWhJul 2022Dec 2023 Solar
Wonderful KingsWonderful Renewable Energy, LLC.Lost Hills, CACalifornia Independent System Operator (CISO)2.9 GWhJul 2022Dec 2023 Solar
Anheuser Busch - FairfieldBloom EnergyFairfield, CACalifornia Independent System Operator (CISO)22.3 GWhNov 2022Dec 2023 Natural Gas
Redlands Community HospitalBloom EnergyRedlands, CACalifornia Independent System Operator (CISO)10.0 GWhMay 2021Dec 2023 Natural Gas
Taylor Farms - Schilling PlaceBloom EnergySalinas, CACalifornia Independent System Operator (CISO)7.2 GWhJun 2019Dec 2023 Natural Gas
Clovis High SchoolTesla Inc.Clovis, CACalifornia Independent System Operator (CISO)1.3 GWhMar 2018Dec 2023 Solar
Clovis East High SchoolTesla Inc.Clovis, CACalifornia Independent System Operator (CISO)1.5 GWhMar 2018Dec 2023 Solar
Clovis North High SchoolTesla Inc.Fresno, CACalifornia Independent System Operator (CISO)1.5 GWhNov 2017Dec 2023 Solar
Henry Miller RDHenry Miller Reclamation DistrictDos Palos, CACalifornia Independent System Operator (CISO)3.3 GWhSep 2018Dec 2023 Solar
City of Rosamond (CA)Standard SolarRosamond, CACalifornia Independent System Operator (CISO)1.2 GWhApr 2023Dec 2023 Solar
Wheeler RidgeAFTW Holdings, LLCBakersfield, CACalifornia Independent System Operator (CISO)2.4 GWhAug 2023Dec 2023 Solar
Crystal Farms Local SolarCrystal Farms Local Solar, LLCSan Joaquin, CACalifornia Independent System Operator (CISO)932.0 MWhOct 2023Dec 2023 Solar
Lost Hills OilfieldDistributed Solar Development, LLCLost Hills, CACalifornia Independent System Operator (CISO)4.4 GWhJun 2021Dec 2023 Solar
Agriculture Capital - Legacy PackingDistributed Solar Development, LLCDinuba, CACalifornia Independent System Operator (CISO)1.5 GWhNov 2022Dec 2023 Solar
Bishop Ranch - BR 1-YDistributed Solar Development, LLCSan Ramon, CACalifornia Independent System Operator (CISO)1.6 GWhFeb 2022Dec 2023 Solar
Renew Solar VMC LLCRenew Solar VMC LLCBakersfield, CACalifornia Independent System Operator (CISO)3.4 GWhFeb 2023Dec 2023 Solar
SEPV Cuyama HybridSEPV Cuyama, LLCNew Cuyama, CACalifornia Independent System Operator (CISO)107.0 MWhNov 2023Dec 2023 Solar
Scooby Solar, LLCScooby Solar, LLCFamoso, CACalifornia Independent System Operator (CISO)927.0 MWhSep 2023Dec 2023 Solar
Sunny Cow Solar, LLCSunny Cow Solar, LLCBakersfield, CACalifornia Independent System Operator (CISO)847.0 MWhSep 2023Dec 2023 Solar
Exeter Bulk Plant ArrayExeter Bulk PlantExeter, CACalifornia Independent System Operator (CISO)1.6 GWhDec 2014Dec 2023 Solar
Double J Dairy ArrayBravo REC Management LLCVisalia, CACalifornia Independent System Operator (CISO)354.0 MWhOct 2023Dec 2023 Solar
Olive View Medical CenterLos Angeles CountySylmar, CALos Angeles Department of Water and Power (LDWP)12.8 GWhJan 1987Feb 2024 Natural Gas
Hoag Hospital Cogen PlantHoag Memorial Presbyterian HospitalNewport Beach, CACalifornia Independent System Operator (CISO)6.6 GWhJun 2006Feb 2024 Natural Gas
Badger Creek LimitedWCAC Operating CompanyBakersfield, CACalifornia Independent System Operator (CISO)19.2 GWhMar 1991Mar 2024 Natural Gas
Berry CogenBerry Petroleum CoTaft, CACalifornia Independent System Operator (CISO)26.0 GWhNov 1986Mar 2024 Natural Gas
McKittrick LimitedWCAC Operating CompanyBakersfield, CACalifornia Independent System Operator (CISO)37.6 GWhSep 1991Mar 2024 Natural Gas
Southeast Resource RecoverySERRF Joint Powers AuthorityLong Beach, CACalifornia Independent System Operator (CISO)102.6 GWhJun 1988Mar 2024 Non-biogenic Municipal Solid Waste : 50.7% Biogenic Municipal Solid Waste : 41.5% Natural Gas : 7.8%
Goal Line LPGoal Line LPEscondido, CACalifornia Independent System Operator (CISO)14.5 GWhJul 1994Mar 2024 Natural Gas
James B BlackPacific Gas & Electric Co.Big Bend, CACalifornia Independent System Operator (CISO)503.1 GWhNov 1965Apr 2024 Water
Pit 5Pacific Gas & Electric Co.Big Bend, CACalifornia Independent System Operator (CISO)672.9 GWhMar 1944Apr 2024 Water
Pit 7Pacific Gas & Electric Co.Montgomery Creek, CACalifornia Independent System Operator (CISO)342.5 GWhAug 1965Apr 2024 Water
King City Power PlantCalpine King City Cogen LLCKing City, CACalifornia Independent System Operator (CISO)54.7 GWhJan 1989Apr 2024 Natural Gas
Desert View PowerDesert View Power IncMecca, CAImperial Irrigation District (IID)172.2 GWhOct 1991Apr 2024 Wood/Wood Waste Solids : 98.9% Natural Gas : 1.1%
Valero Refinery Cogeneration Unit 1Valero Refining Co CaliforniaBenicia, CACalifornia Independent System Operator (CISO)260.9 GWhSep 2002Apr 2024 Natural Gas : 70.2% Other Gas : 29.8%
AES Alamitos LLCAES Alamitos LLCLong Beach, CACalifornia Independent System Operator (CISO)535.8 GWhAug 1956May 2024 Natural Gas
AES Huntington Beach LLCAES Huntington Beach LLCHuntington Beach, CACalifornia Independent System Operator (CISO)161.9 GWhMay 1958May 2024 Natural Gas
CSUCI Site AuthorityCSUCI Site AuthorityCamarillo, CACalifornia Independent System Operator (CISO)841.0 MWhFeb 1988May 2024 Natural Gas
Naval Hospital Medical CenterDepartment of the NavySan Diego, CACalifornia Independent System Operator (CISO)19.5 GWhNov 2003May 2024 Natural Gas
Hanford Energy Park PeakerMRP San Joaquin Energy LLC.Hanford, CACalifornia Independent System Operator (CISO)6.1 GWhAug 2001May 2024 Natural Gas
J S EastwoodSouthern California Edison CoShaver Lake, CACalifornia Independent System Operator (CISO)423.0 MWhNov 1987Jun 2024 Water
BeldenPacific Gas & Electric Co.Belden, CACalifornia Independent System Operator (CISO)194.2 GWhAug 1969Jun 2024 Water
Caribou 2Pacific Gas & Electric Co.Belden, CACalifornia Independent System Operator (CISO)382.3 GWhOct 1958Jun 2024 Water
ElectraPacific Gas & Electric Co.Jackson, CACalifornia Independent System Operator (CISO)427.0 GWhMay 1948Jun 2024 Water
HaasPacific Gas & Electric Co.Balch Camp, CACalifornia Independent System Operator (CISO)573.3 GWhNov 1958Jun 2024 Water
Humboldt BayPacific Gas & Electric Co.Eureka, CACalifornia Independent System Operator (CISO)402.4 GWhAug 2010Jun 2024 Natural Gas : 99.5% Distillate Fuel Oil : 0.5%
Dynegy Moss Landing Power Plant HybridDynegy -Moss Landing LLCMoss Landing, CACalifornia Independent System Operator (CISO)5.3 TWhNov 1967Jun 2024 Natural Gas
Pit 4Pacific Gas & Electric Co.Big Bend, CACalifornia Independent System Operator (CISO)349.8 GWhJun 1955Jun 2024 Water
PoePacific Gas & Electric Co.Storrie, CACalifornia Independent System Operator (CISO)677.2 GWhSep 1958Jun 2024 Water
Rock CreekPacific Gas & Electric Co.Storrie, CACalifornia Independent System Operator (CISO)629.8 GWhFeb 1950Jun 2024 Water
Geysers Unit 5-20Geysers Power Co LLCMiddletown, CACalifornia Independent System Operator (CISO)4.8 TWhMar 1971Jun 2024 Geothermal
Big Creek 3Southern California Edison CoAuberry, CACalifornia Independent System Operator (CISO)732.9 GWhAug 1923Jun 2024 Water
Big Creek 4Southern California Edison CoNorth Fork, CACalifornia Independent System Operator (CISO)535.0 GWhMay 1951Jun 2024 Water
Big Creek 2ASouthern California Edison CoAuberry, CACalifornia Independent System Operator (CISO)593.0 GWhJul 1928Jun 2024 Water
Mammoth PoolSouthern California Edison CoNorth Fork, CACalifornia Independent System Operator (CISO)641.7 GWhFeb 1960Jun 2024 Water
Ormond BeachOrmond Beach Power, LLCOxnard, CACalifornia Independent System Operator (CISO)248.8 GWhJul 1971Jun 2024 Natural Gas
Mountainview Generating StationSouthern California Edison CoRedlands, CACalifornia Independent System Operator (CISO)2.5 TWhNov 2005Jun 2024 Natural Gas
GraysonCity of Glendale - (CA)Glendale, CALos Angeles Department of Water and Power (LDWP)30.2 GWhNov 1953Jun 2024 Natural Gas
Dion R HolmCity & County of San FranciscoGroveland, CACalifornia Independent System Operator (CISO)651.1 GWhJul 1960Jun 2024 Water
MoccasinCity & County of San FranciscoMoccasin, CACalifornia Independent System Operator (CISO)326.8 GWhJul 1969Jun 2024 Water
R C KirkwoodCity & County of San FranciscoGroveland, CACalifornia Independent System Operator (CISO)547.7 GWhJan 1967Jun 2024 Water
El Centro HybridImperial Irrigation DistrictEl Centro, CAImperial Irrigation District (IID)1.2 TWhJul 1952Jun 2024 Natural Gas
CastaicLos Angeles Department of Water & PowerCastaic, CALos Angeles Department of Water and Power (LDWP)57.7 GWhDec 1971Jun 2024 Water
HarborLos Angeles Department of Water & PowerWilmington, CALos Angeles Department of Water and Power (LDWP)150.7 GWhJun 1949Jun 2024 Natural Gas
HaynesLos Angeles Department of Water & PowerLong Beach, CALos Angeles Department of Water and Power (LDWP)2.7 TWhAug 1962Jun 2024 Natural Gas
ScattergoodLos Angeles Department of Water & PowerPlaya del Rey, CALos Angeles Department of Water and Power (LDWP)1.3 TWhNov 1958Jun 2024 Natural Gas
Valley (CA)Los Angeles Department of Water & PowerSun Valley, CALos Angeles Department of Water and Power (LDWP)1.6 TWhJul 2001Jun 2024 Natural Gas
Middle ForkPlacer County Water AgencyForesthill, CACalifornia Independent System Operator (CISO)617.1 GWhSep 1966Jun 2024 Water
CaminoSacramento Municipal Util DistCamino, CABalancing Authority of Northern California (BANC)402.5 GWhSep 1963Jun 2024 Water
JaybirdSacramento Municipal Util DistCamino, CABalancing Authority of Northern California (BANC)592.3 GWhMar 1961Jun 2024 Water
White Rock/Slab CreekSacramento Municipal Util DistPlacerville, CABalancing Authority of Northern California (BANC)673.9 GWhJan 1968Jun 2024 Water
Devil CanyonCalifornia Dept. of Water ResourcesSan Bernardino, CACalifornia Independent System Operator (CISO)1.1 TWhNov 1972Jun 2024 Water
Edward C HyattCalifornia Dept. of Water ResourcesOroville, CACalifornia Independent System Operator (CISO)2.1 TWhFeb 1968Jun 2024 Water
ThermalitoCalifornia Dept. of Water ResourcesOroville, CACalifornia Independent System Operator (CISO)341.3 GWhJan 1968Jun 2024 Water
Don PedroTurlock Irrigation DistrictLa Grange, CATurlock Irrigation District (TIDC)594.5 GWhApr 1971Jun 2024 Water
FolsomU S Bureau of ReclamationFolsom, CABalancing Authority of Northern California (BANC)762.9 GWhApr 1955Jun 2024 Water
Judge F CarrU S Bureau of ReclamationFrench Gulch, CABalancing Authority of Northern California (BANC)166.8 GWhApr 1963Jun 2024 Water
KeswickU S Bureau of ReclamationRedding, CABalancing Authority of Northern California (BANC)409.2 GWhSep 1949Jun 2024 Water
ShastaU S Bureau of ReclamationRedding, CABalancing Authority of Northern California (BANC)2.5 TWhMay 1944Jun 2024 Water
Parker DamU S Bureau of ReclamationParker, CAWestern Area Power Administration - Desert Southwest Region (WALC)424.7 GWhNov 1942Jun 2024 Water
W R GianelliCalifornia Dept. of Water ResourcesGustine, CACalifornia Independent System Operator (CISO)144.1 GWhFeb 1967Jun 2024 Water
Spring CreekU S Bureau of ReclamationRedding, CABalancing Authority of Northern California (BANC)259.9 GWhDec 1963Jun 2024 Water
TrinityU S Bureau of ReclamationWeaverville, CABalancing Authority of Northern California (BANC)324.9 GWhJan 1964Jun 2024 Water
ColgateYuba County Water AgencyDobbins, CACalifornia Independent System Operator (CISO)1.5 TWhSep 1969Jun 2024 Water

Browse Power Plants By California Counties

Figures are based on June 2024 generation numbers.
CountyState RankActive PlantsJun 2024 Generation
Kern County, CA# 128336.2 TWh
Los Angeles County, CA# 229022.6 TWh
San Luis Obispo County, CA# 31920.8 TWh
Contra Costa County, CA# 44815.6 TWh
San Bernardino County, CA# 519614.7 TWh
Riverside County, CA# 615813.9 TWh
Imperial County, CA# 78110.9 TWh
Fresno County, CA# 81008.7 TWh
Shasta County, CA# 9467.7 TWh
Sacramento County, CA# 10636.8 TWh
Monterey County, CA# 11295.7 TWh
San Diego County, CA# 121475.6 TWh
Sonoma County, CA# 13245.5 TWh
Santa Clara County, CA# 14734.9 TWh
Butte County, CA# 15253.9 TWh
Tuolumne County, CA# 16233.8 TWh
Orange County, CA# 17583.7 TWh
Kings County, CA# 18513.5 TWh
Solano County, CA# 19393.2 TWh
Colusa County, CA# 2033.2 TWh
Alameda County, CA# 21423.0 TWh
Stanislaus County, CA# 22242.6 TWh
San Joaquin County, CA# 23392.5 TWh
El Dorado County, CA# 24152.2 TWh
Sutter County, CA# 2572.2 TWh
Placer County, CA# 26212.1 TWh
Plumas County, CA# 27131.9 TWh
Yuba County, CA# 2841.9 TWh
CountyState RankActive PlantsJun 2024 Generation
Madera County, CA# 29251.5 TWh
Inyo County, CA# 30211.4 TWh
Ventura County, CA# 31301.1 TWh
Amador County, CA# 327987.8 GWh
Calaveras County, CA# 336955.6 GWh
Merced County, CA# 3423920.0 GWh
Tulare County, CA# 3553910.8 GWh
Mono County, CA# 369842.4 GWh
Lake County, CA# 3710805.0 GWh
Humboldt County, CA# 389535.1 GWh
Nevada County, CA# 3912376.9 GWh
Lassen County, CA# 409356.6 GWh
Trinity County, CA# 415353.9 GWh
San Benito County, CA# 425346.1 GWh
Siskiyou County, CA# 438334.6 GWh
Santa Barbara County, CA# 4418287.3 GWh
Yolo County, CA# 4514266.4 GWh
Mariposa County, CA# 462145.9 GWh
San Mateo County, CA# 4710143.3 GWh
San Francisco County, CA# 481083.4 GWh
Tehama County, CA# 49775.4 GWh
Santa Cruz County, CA# 50673.9 GWh
Napa County, CA# 51752.8 GWh
Sierra County, CA# 52330.5 GWh
Marin County, CA# 53315.2 GWh
Mendocino County, CA# 54411.2 GWh
Glenn County, CA# 5528.3 GWh