Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Google Moffett Park Solar Project | Google, Inc. | Sunnyvale, CA | California Independent System Operator (CISO) | 2.7 GWh | Feb 2021 | Dec 2023 | Solar |
Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2022 | Dec 2023 | Solar : 88.9% Electricity used for energy storage : 11.1% |
CA - Madera USD - Madera South HS | Forefront Power, LLC | Madera, CA | California Independent System Operator (CISO) | 462.0 MWh | Aug 2023 | Dec 2023 | Solar |
BBARWA | Distributed Solar Development, LLC | Big Bear, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2021 | Dec 2023 | Solar |
Niagara Bottling - Rialto | SkyHigh 2 Solar | Rialto, CA | California Independent System Operator (CISO) | 7.9 GWh | Nov 2021 | Dec 2023 | Solar |
POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 352.0 MWh | Jun 2021 | Dec 2023 | Solar |
POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.1 GWh | Jun 2021 | Dec 2023 | Solar |
Dover Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2022 | Dec 2023 | Solar |
Ventura Solar | Ventura Solar LLC | Fillmore, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2021 | Dec 2023 | Solar |
Wonderful Nursery | Wonderful Renewable Energy, LLC. | Wasco, CA | California Independent System Operator (CISO) | 5.4 GWh | Jun 2021 | Dec 2023 | Solar |
20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 2.4 GWh | Jun 2022 | Dec 2023 | Solar |
Java Solar, LLC | Java Solar, LLC | Lemoore, CA | California Independent System Operator (CISO) | 28.6 GWh | Oct 2022 | Dec 2023 | Solar |
Sheep Creek Community Solar Farm | Phelan Solar LLC | El Mirage, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2023 | Solar |
IGS SBD1 | Greenbacker Renewable Energy Corporation | Bloomington, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Jan 2023 | Dec 2023 | Solar |
IGS SBD2 | Greenbacker Renewable Energy Corporation | San Bernardino, CA | Los Angeles Department of Water and Power (LDWP) | 4.2 GWh | Jan 2023 | Dec 2023 | Solar |
Kaiser - Harbor City | Bloom Energy | Harbor City, CA | California Independent System Operator (CISO) | 16.4 GWh | Nov 2019 | Dec 2023 | Natural Gas |
San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 6.5 GWh | Feb 2020 | Dec 2023 | Natural Gas |
Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 9.9 GWh | Nov 2020 | Dec 2023 | Natural Gas |
Kaiser - LA | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 33.1 GWh | May 2020 | Dec 2023 | Natural Gas |
Kaiser - Woodland Hills | Bloom Energy | Woodland Hills, CA | California Independent System Operator (CISO) | 17.7 GWh | Aug 2019 | Dec 2023 | Natural Gas |
POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2023 | Solar |
POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 292.0 MWh | Nov 2021 | Dec 2023 | Solar |
Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2022 | Dec 2023 | Solar |
Wonderful Firebaugh | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 10.1 GWh | Jul 2022 | Dec 2023 | Solar |
Wonderful Kings | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 2.9 GWh | Jul 2022 | Dec 2023 | Solar |
Anheuser Busch - Fairfield | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 21.6 GWh | Nov 2022 | Dec 2023 | Natural Gas |
Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 9.1 GWh | May 2021 | Dec 2023 | Natural Gas |
Taylor Farms - Schilling Place | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 6.5 GWh | Jun 2019 | Dec 2023 | Natural Gas |
Blue Skies Solar, LLC | Blue Skies Solar, LLC | Arvin, CA | PacifiCorp West (PACW) | 1.9 GWh | Nov 2021 | Dec 2023 | Solar |
Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2018 | Dec 2023 | Solar |
Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.4 GWh | Mar 2018 | Dec 2023 | Solar |
Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2017 | Dec 2023 | Solar |
San Manuel Central Plant Cogens | San Manuel Mission Band of Indians | Highland, CA | California Independent System Operator (CISO) | 26.5 GWh | May 2021 | Dec 2023 | Natural Gas |
Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.3 GWh | Sep 2018 | Dec 2023 | Solar |
BCE Los Alamitos 2 | Bright Canyon Energy | Los Alamitos, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2023 | Dec 2023 | Solar |
BCE Los Alamitos 1 | Bright Canyon Energy | Los Alamitos, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2023 | Dec 2023 | Solar |
9150 Hermosa Solar GM | Valta Energy | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2022 | Dec 2023 | Solar |
City of Rosamond (CA) | Standard Solar | Rosamond, CA | California Independent System Operator (CISO) | 1.2 GWh | Apr 2023 | Dec 2023 | Solar |
Wheeler Ridge | AFTW Holdings, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.4 GWh | Aug 2023 | Dec 2023 | Solar |
Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 932.0 MWh | Oct 2023 | Dec 2023 | Solar |
Lost Hills Oilfield | Distributed Solar Development, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2021 | Dec 2023 | Solar |
Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2022 | Dec 2023 | Solar |
Bishop Ranch - BR 1-Y | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2022 | Dec 2023 | Solar |
Vulcan San Emidio Solar | Renew Solar VMC LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.4 GWh | Feb 2023 | Dec 2023 | Solar |
SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 107.0 MWh | Nov 2023 | Dec 2023 | Solar |
Blackjack Solar | South County Packing | King City, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2020 | Dec 2023 | Solar |
Cawelo Water District Solar | Scooby Solar, LLC | Famoso, CA | California Independent System Operator (CISO) | 927.0 MWh | Sep 2023 | Dec 2023 | Solar |
Sunny Cow Solar, LLC | Sunny Cow Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 847.0 MWh | Sep 2023 | Dec 2023 | Solar |
Cabrillo College | Forefront Power, LLC | Aptos, CA | California Independent System Operator (CISO) | 13.0 MWh | Nov 2023 | Dec 2023 | Solar |
Double J Dairy Array | Bravo REC Management LLC | Visalia, CA | California Independent System Operator (CISO) | 354.0 MWh | Oct 2023 | Dec 2023 | Solar |
Olive View Medical Center | Los Angeles County DHS | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 11.4 GWh | Jan 1987 | Feb 2024 | Natural Gas |
Hoag Hospital Cogen Plant | Hoag Memorial Presbyterian Hospital | Newport Beach, CA | California Independent System Operator (CISO) | 5.3 GWh | Jun 2006 | Feb 2024 | Natural Gas |
Southeast Resource Recovery | SERRF Joint Powers Authority | Long Beach, CA | California Independent System Operator (CISO) | 89.9 GWh | Jun 1988 | Mar 2024 | Non-biogenic Municipal Solid Waste : 51.7% Biogenic Municipal Solid Waste : 42.3% Natural Gas : 6.1% |
Desert View Power | Desert View Power Inc | Mecca, CA | Imperial Irrigation District (IID) | 166.6 GWh | Oct 1991 | Apr 2024 | Wood/Wood Waste Solids : 99.0% Natural Gas : 1.0% |
Big Creek Water Works | Big Creek Water Works Ltd | Hyampom, CA | California Independent System Operator (CISO) | 10.6 GWh | Dec 1986 | Jun 2024 | Water |
P Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 30.5 GWh | Feb 2007 | Jul 2024 | Natural Gas |
Q Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 27.0 MWh | Jun 2013 | Aug 2024 | Natural Gas |
Dynegy Oakland Power Plant | Dynegy Oakland, LLC | Oakland, CA | California Independent System Operator (CISO) | 9.3 GWh | Oct 1978 | Aug 2024 | Jet Fuel |
Phillips 66 Rodeo Refinery | Phillips 66 Company | Rodeo, CA | California Independent System Operator (CISO) | 291.0 GWh | Apr 1987 | Aug 2024 | Other Gas : 72.8% Natural Gas : 27.2% |
Elk Hills Cogen | California Resources Elk Hills LLC | Tupman, CA | California Independent System Operator (CISO) | 80.7 GWh | Oct 1994 | Aug 2024 | Natural Gas |
J S Eastwood | Southern California Edison Co | Shaver Lake, CA | California Independent System Operator (CISO) | 22.1 GWh | Nov 1987 | Sep 2024 | Water |
Belden | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 332.6 GWh | Aug 1969 | Sep 2024 | Water |
Caribou 2 | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 337.6 GWh | Oct 1958 | Sep 2024 | Water |
Electra | Pacific Gas & Electric Co. | Jackson, CA | California Independent System Operator (CISO) | 337.8 GWh | May 1948 | Sep 2024 | Water |
Haas | Pacific Gas & Electric Co. | Balch Camp, CA | California Independent System Operator (CISO) | 541.0 GWh | Nov 1958 | Sep 2024 | Water |
Humboldt Bay | Pacific Gas & Electric Co. | Eureka, CA | California Independent System Operator (CISO) | 363.4 GWh | Aug 2010 | Sep 2024 | Natural Gas : 99.5% Distillate Fuel Oil : 0.5% |
James B Black | Pacific Gas & Electric Co. | Big Bend, CA | California Independent System Operator (CISO) | 376.5 GWh | Nov 1965 | Sep 2024 | Water |
Dynegy Moss Landing Power Plant Hybrid | Dynegy -Moss Landing LLC | Moss Landing, CA | California Independent System Operator (CISO) | 4.5 TWh | Nov 1967 | Sep 2024 | Natural Gas |
Pit 4 | Pacific Gas & Electric Co. | Big Bend, CA | California Independent System Operator (CISO) | 311.4 GWh | Jun 1955 | Sep 2024 | Water |
Pit 5 | Pacific Gas & Electric Co. | Big Bend, CA | California Independent System Operator (CISO) | 368.3 GWh | Mar 1944 | Sep 2024 | Water |
Pit 7 | Pacific Gas & Electric Co. | Montgomery Creek, CA | California Independent System Operator (CISO) | 263.2 GWh | Aug 1965 | Sep 2024 | Water |
Poe | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 589.5 GWh | Sep 1958 | Sep 2024 | Water |
Rock Creek | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 559.2 GWh | Feb 1950 | Sep 2024 | Water |
Geysers Unit 5-20 | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 4.4 TWh | Mar 1971 | Sep 2024 | Geothermal |
AES Alamitos LLC | AES Alamitos LLC | Long Beach, CA | California Independent System Operator (CISO) | 167.2 GWh | Aug 1956 | Sep 2024 | Natural Gas |
Big Creek 3 | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 745.8 GWh | Aug 1923 | Sep 2024 | Water |
Big Creek 4 | Southern California Edison Co | North Fork, CA | California Independent System Operator (CISO) | 428.0 GWh | May 1951 | Sep 2024 | Water |
Big Creek 2A | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 536.5 GWh | Jul 1928 | Sep 2024 | Water |
AES Huntington Beach LLC | AES Huntington Beach LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 75.9 GWh | May 1958 | Sep 2024 | Natural Gas |
Mammoth Pool | Southern California Edison Co | North Fork, CA | California Independent System Operator (CISO) | 520.8 GWh | Feb 1960 | Sep 2024 | Water |
Ormond Beach | Ormond Beach Power, LLC | Oxnard, CA | California Independent System Operator (CISO) | 68.8 GWh | Jul 1971 | Sep 2024 | Natural Gas |
Mountainview Generating Station | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 2.7 TWh | Nov 2005 | Sep 2024 | Natural Gas |
Grayson | City of Glendale - (CA) | Glendale, CA | Los Angeles Department of Water and Power (LDWP) | 43.3 GWh | Nov 1953 | Sep 2024 | Natural Gas |
Dion R Holm | City & County of San Francisco | Groveland, CA | California Independent System Operator (CISO) | 509.3 GWh | Jul 1960 | Sep 2024 | Water |
Moccasin | City & County of San Francisco | Moccasin, CA | California Independent System Operator (CISO) | 267.8 GWh | Jul 1969 | Sep 2024 | Water |
R C Kirkwood | City & County of San Francisco | Groveland, CA | California Independent System Operator (CISO) | 434.9 GWh | Jan 1967 | Sep 2024 | Water |
El Centro Hybrid | Imperial Irrigation District | El Centro, CA | Imperial Irrigation District (IID) | 1.1 TWh | Jul 1952 | Sep 2024 | Natural Gas |
Castaic | Los Angeles Department of Water & Power | Castaic, CA | Los Angeles Department of Water and Power (LDWP) | 16.8 GWh | Dec 1971 | Sep 2024 | Water |
Harbor | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 191.9 GWh | Jun 1949 | Sep 2024 | Natural Gas |
Haynes | Los Angeles Department of Water & Power | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 2.6 TWh | Aug 1962 | Sep 2024 | Natural Gas |
Scattergood | Los Angeles Department of Water & Power | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 1.0 TWh | Nov 1958 | Sep 2024 | Natural Gas |
Valley (CA) | Los Angeles Department of Water & Power | Sun Valley, CA | Los Angeles Department of Water and Power (LDWP) | 1.6 TWh | Jul 2001 | Sep 2024 | Natural Gas |
Middle Fork | Placer County Water Agency | Foresthill, CA | California Independent System Operator (CISO) | 475.6 GWh | Sep 1966 | Sep 2024 | Water |
Camino | Sacramento Municipal Util Dist | Camino, CA | Balancing Authority of Northern California (BANC) | 282.3 GWh | Sep 1963 | Sep 2024 | Water |
Jaybird | Sacramento Municipal Util Dist | Camino, CA | Balancing Authority of Northern California (BANC) | 431.9 GWh | Mar 1961 | Sep 2024 | Water |
White Rock/Slab Creek | Sacramento Municipal Util Dist | Placerville, CA | Balancing Authority of Northern California (BANC) | 470.3 GWh | Jan 1968 | Sep 2024 | Water |
Devil Canyon | California Dept. of Water Resources | San Bernardino, CA | California Independent System Operator (CISO) | 905.1 GWh | Nov 1972 | Sep 2024 | Water |
Edward C Hyatt | California Dept. of Water Resources | Oroville, CA | California Independent System Operator (CISO) | 2.4 TWh | Feb 1968 | Sep 2024 | Water |
Thermalito | California Dept. of Water Resources | Oroville, CA | California Independent System Operator (CISO) | 350.5 GWh | Jan 1968 | Sep 2024 | Water |
Don Pedro | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 491.6 GWh | Apr 1971 | Sep 2024 | Water |
Browse Power Plants By California Counties
Figures are based on September 2024 generation numbers.County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 293 | 33.2 TWh |
Los Angeles County, CA | # 2 | 290 | 21.3 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.6 TWh |
Riverside County, CA | # 6 | 158 | 13.8 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Sacramento County, CA | # 10 | 63 | 6.5 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
Monterey County, CA | # 13 | 29 | 4.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.7 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Kings County, CA | # 16 | 54 | 3.6 TWh |
Orange County, CA | # 17 | 58 | 3.5 TWh |
Tuolumne County, CA | # 18 | 23 | 3.5 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
Plumas County, CA | # 26 | 13 | 1.8 TWh |
El Dorado County, CA | # 27 | 15 | 1.8 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Madera County, CA | # 30 | 26 | 1.2 TWh |
Lake County, CA | # 31 | 10 | 902.9 GWh |
Amador County, CA | # 32 | 7 | 866.5 GWh |
Tulare County, CA | # 33 | 53 | 818.8 GWh |
Ventura County, CA | # 34 | 30 | 817.1 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Calaveras County, CA | # 36 | 6 | 749.2 GWh |
Merced County, CA | # 37 | 25 | 704.1 GWh |
Humboldt County, CA | # 38 | 10 | 487.8 GWh |
Trinity County, CA | # 39 | 5 | 389.5 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Santa Barbara County, CA | # 43 | 18 | 317.8 GWh |
San Benito County, CA | # 44 | 5 | 313.0 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Yolo County, CA | # 46 | 15 | 226.6 GWh |
San Mateo County, CA | # 47 | 10 | 129.6 GWh |
San Francisco County, CA | # 48 | 10 | 76.9 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 64.7 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Mendocino County, CA | # 55 | 4 | 11.1 GWh |