Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.9 GWh | Oct 2022 | Dec 2023 | Solar |
CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 1.0 GWh | Nov 2018 | Dec 2023 | Solar |
Verwey-Hanford Dairy Digester #2 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.3 GWh | Jun 2019 | Dec 2023 | Other Biomass Gas |
Verwey-Hanford Dairy Digester #3 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.3 GWh | Jun 2019 | Dec 2023 | Other Biomass Gas |
Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 7.8 GWh | Nov 2018 | Dec 2023 | Natural Gas |
Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 14.7 GWh | Jun 2018 | Dec 2023 | Natural Gas |
Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 27.0 GWh | Nov 2020 | Dec 2023 | Solar |
Renew Solar ABC Sacramento LLC | Greenbacker Renewable Energy Corporation | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.9 GWh | Oct 2020 | Dec 2023 | Solar |
Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 9.6 GWh | Aug 2023 | Dec 2023 | Solar |
Disney Prospect | Bloom Energy | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 7.6 GWh | Feb 2017 | Dec 2023 | Natural Gas |
ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 7.0 GWh | Mar 2017 | Dec 2023 | Natural Gas |
ATT Van Nyus | Bloom Energy | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 7.2 GWh | Jun 2017 | Dec 2023 | Natural Gas |
FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Jan 2017 | Dec 2023 | Natural Gas |
APP Prune A-D | Bloom Energy | Cupertino, CA | California Independent System Operator (CISO) | 27.1 GWh | Apr 2017 | Dec 2023 | Natural Gas |
Preferred Freezer San Leandro | EnterSolar | San Leandro, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2017 | Dec 2023 | Solar |
PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2018 | Dec 2023 | Solar |
SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2019 | Dec 2023 | Solar |
Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 18.1 GWh | Jul 2022 | Dec 2023 | Wind |
HL Solar | HL Solar LLC | Wendel, CA | California Independent System Operator (CISO) | 10.9 GWh | May 2019 | Dec 2023 | Solar |
Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 35.9 GWh | Nov 2017 | Dec 2023 | Natural Gas |
Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 34.7 GWh | May 2021 | Dec 2023 | Solar |
Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.4 GWh | May 2021 | Dec 2023 | Solar |
American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.6 GWh | Aug 2019 | Dec 2023 | Solar |
Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 5.3 GWh | Sep 2017 | Dec 2023 | Solar |
Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2017 | Dec 2023 | Solar |
Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2018 | Dec 2023 | Solar |
Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 38.2 GWh | Nov 2017 | Dec 2023 | Natural Gas |
Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 16.4 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 10.4 GWh | Mar 2017 | Dec 2023 | Natural Gas |
Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 7.6 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Kaiser Napa Valley Corporate Dr Fuel Cell | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 37.4 GWh | May 2017 | Dec 2023 | Natural Gas |
Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 28.2 GWh | Nov 2017 | Dec 2023 | Natural Gas |
Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 27.8 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.1 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2017 | Dec 2023 | Natural Gas |
Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.1 GWh | Jul 2019 | Dec 2023 | Solar |
Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.4 GWh | Jan 2020 | Dec 2023 | Solar |
Windsor Floating Solar | CA ODEVI LLC | Windsor, CA | California Independent System Operator (CISO) | 2.5 GWh | Oct 2020 | Dec 2023 | Solar |
Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2018 | Dec 2023 | Solar |
Wildflower Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Elverta, CA | Balancing Authority of Northern California (BANC) | 29.1 GWh | Nov 2020 | Dec 2023 | Solar |
SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2023 | Solar |
CalCity Solar 1 | CalCity Solar 1, LLC | California City, CA | California Independent System Operator (CISO) | 7.4 GWh | Oct 2019 | Dec 2023 | Solar |
SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 3.8 GWh | Sep 2018 | Dec 2023 | Solar |
Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2018 | Dec 2023 | Solar |
Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 2019 | Dec 2023 | Solar |
Tajiguas Resource Recovery Project | MSB Investors, LLC | Goleta, CA | California Independent System Operator (CISO) | 8.3 GWh | May 2022 | Dec 2023 | Other Biomass Gas |
Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.3 GWh | Sep 2021 | Dec 2023 | Solar |
CID Solar (CA) | DG California Solar LLC | Corcoran, CA | California Independent System Operator (CISO) | 2.6 GWh | Aug 2019 | Dec 2023 | Solar |
Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 236.7 GWh | Oct 2017 | Dec 2023 | Natural Gas |
Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2023 | Solar |
Medline Ind. Phase 2 Tracy | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 2.0 GWh | Mar 2018 | Dec 2023 | Solar |
Niagara Bottling Stockton | EnterSolar | Stockton, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2017 | Dec 2023 | Solar |
Castaic Lake Phase II | MN8 Energy LLC | Santa Clara, CA | California Independent System Operator (CISO) | 7.8 GWh | Nov 2014 | Dec 2023 | Solar |
IOS II-LAX9 | IOS II LLC | Fontana, CA | California Independent System Operator (CISO) | 7.5 GWh | Jan 2020 | Dec 2023 | Solar |
Sierra Pacific Industries (2042-RD) | Sierra Pacific Industries | Red Bluff, CA | California Independent System Operator (CISO) | 16.6 GWh | Apr 2020 | Dec 2023 | Solar |
DGS Wasco State Prison | Forefront Power, LLC | Wasco, CA | California Independent System Operator (CISO) | 4.8 GWh | Jun 2020 | Dec 2023 | Solar |
DGS Central California Womens Facility | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2020 | Dec 2023 | Solar |
Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.2 GWh | Feb 2020 | Dec 2023 | Solar |
Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2020 | Dec 2023 | Solar : 99.3% Electricity used for energy storage : 0.7% |
Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2020 | Dec 2023 | Solar |
Central CA Fuel Cell 1 | Central CA Fuel Cell 1 | Tulare, CA | California Independent System Operator (CISO) | 18.0 GWh | Apr 2018 | Dec 2023 | Natural Gas |
RE-VFO LLC | RE-VFO LLC | Visalia, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2009 | Dec 2023 | Solar |
D'Arrigo Brothers - Phase 4 | CalCom Energy | Salinas, CA | California Independent System Operator (CISO) | 4.1 GWh | Feb 2019 | Dec 2023 | Solar |
Wister Solar | Wister Solar | Niland, CA | Imperial Irrigation District (IID) | 29.7 GWh | Jun 2022 | Dec 2023 | Solar |
CD4 | CD4 | Mammoth Lakes, CA | California Independent System Operator (CISO) | 272.3 GWh | Jun 2022 | Dec 2023 | Geothermal |
PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 5.2 GWh | Aug 2018 | Dec 2023 | Solar |
Walnut Unified School District Walnut HS Hybrid | Tesla Inc. | Walnut, CA | California Independent System Operator (CISO) | 1.8 GWh | Jan 2020 | Dec 2023 | Solar |
Moonlight Packing - Phase 2 | CalCom Energy | Reedley, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2019 | Dec 2023 | Solar |
California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 5.3 GWh | Jun 2018 | Dec 2023 | Solar |
Lafayette 2 - Internal Services Dept | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.7 GWh | Jul 2020 | Dec 2023 | Solar |
Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 25.3 GWh | Aug 2019 | Dec 2023 | Natural Gas |
Extreme San Ignacio | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.0 GWh | Apr 2019 | Dec 2023 | Natural Gas |
ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 6.6 GWh | Nov 2019 | Dec 2023 | Natural Gas |
ATT Ventura Blvd | Bloom Energy | Sherman Oaks, CA | Los Angeles Department of Water and Power (LDWP) | 7.3 GWh | Oct 2019 | Dec 2023 | Natural Gas |
Extreme Via Del Oro | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.5 GWh | Feb 2019 | Dec 2023 | Natural Gas |
OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 348.0 MWh | - | Dec 2023 | Other Biomass Gas |
Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.4 GWh | Jul 2020 | Dec 2023 | Solar |
Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 15.9 GWh | Feb 2019 | Dec 2023 | Natural Gas |
North Kern State Prison Phase II | SunE P11L Holdings, LLC | Delano, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2012 | Dec 2023 | Solar |
AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 6.3 GWh | Aug 2018 | Dec 2023 | Natural Gas |
CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 8.3 GWh | Dec 2018 | Dec 2023 | Natural Gas |
EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 16.5 GWh | Aug 2019 | Dec 2023 | Natural Gas |
EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 20.6 GWh | Aug 2018 | Dec 2023 | Natural Gas |
EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 29.2 GWh | Dec 2017 | Dec 2023 | Natural Gas |
JSR000 N Mathilda Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2019 | Dec 2023 | Natural Gas |
KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 14.4 GWh | Mar 2018 | Dec 2023 | Natural Gas |
GEN005 Antibody Fuel Cell | 2016 ESA Project Company, LLC | Oceanside, CA | California Independent System Operator (CISO) | 16.3 GWh | Mar 2019 | Dec 2023 | Natural Gas |
SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 10.9 GWh | Nov 2018 | Dec 2023 | Natural Gas |
KSR053 Cantara Fuel Cell | 2016 ESA Project Company, LLC | Panorama City, CA | California Independent System Operator (CISO) | 5.3 GWh | Apr 2018 | Dec 2023 | Natural Gas |
TLR000 Hansen Fuel Cell | 2016 ESA Project Company, LLC | Salinas, CA | California Independent System Operator (CISO) | 8.3 GWh | Aug 2018 | Dec 2023 | Natural Gas |
Kroger La Habra | Ralph's Grocery Company | La Habra, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2020 | Dec 2023 | Solar |
Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2020 | Dec 2023 | Solar |
Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 619.0 MWh | Aug 2023 | Dec 2023 | Solar |
Vacaville Hospital | KP Vacaville Solar, LLC | Vacaville, CA | California Independent System Operator (CISO) | 3.0 GWh | Nov 2019 | Dec 2023 | Solar |
Oasis Alta | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 45.4 GWh | Mar 2021 | Dec 2023 | Wind |
DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 4.0 GWh | Jan 2021 | Dec 2023 | Solar |
FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2013 | Dec 2023 | Solar |
Firebaugh-CCS-PV-1 | Mike Woolf Farming | Firebaugh, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2015 | Dec 2023 | Solar |
Toyota Long Beach Trigen | Long Beach Trigen, LLC | Long Beach, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2023 | Dec 2023 | Other Biomass Gas |
SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2021 | Dec 2023 | Other Biomass Gas : 96.8% Natural Gas : 3.2% |
Browse Power Plants By California Counties
Figures are based on September 2024 generation numbers.County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 293 | 33.2 TWh |
Los Angeles County, CA | # 2 | 290 | 21.3 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.6 TWh |
Riverside County, CA | # 6 | 158 | 13.8 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Sacramento County, CA | # 10 | 63 | 6.5 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
Monterey County, CA | # 13 | 29 | 4.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.7 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Kings County, CA | # 16 | 54 | 3.6 TWh |
Orange County, CA | # 17 | 58 | 3.5 TWh |
Tuolumne County, CA | # 18 | 23 | 3.5 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
Plumas County, CA | # 26 | 13 | 1.8 TWh |
El Dorado County, CA | # 27 | 15 | 1.8 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Madera County, CA | # 30 | 26 | 1.2 TWh |
Lake County, CA | # 31 | 10 | 902.9 GWh |
Amador County, CA | # 32 | 7 | 866.5 GWh |
Tulare County, CA | # 33 | 53 | 818.8 GWh |
Ventura County, CA | # 34 | 30 | 817.1 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Calaveras County, CA | # 36 | 6 | 749.2 GWh |
Merced County, CA | # 37 | 25 | 704.1 GWh |
Humboldt County, CA | # 38 | 10 | 487.8 GWh |
Trinity County, CA | # 39 | 5 | 389.5 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Santa Barbara County, CA | # 43 | 18 | 317.8 GWh |
San Benito County, CA | # 44 | 5 | 313.0 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Yolo County, CA | # 46 | 15 | 226.6 GWh |
San Mateo County, CA | # 47 | 10 | 129.6 GWh |
San Francisco County, CA | # 48 | 10 | 76.9 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 64.7 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Mendocino County, CA | # 55 | 4 | 11.1 GWh |