Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2022 | Solar |
UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2017 | Dec 2022 | Solar |
UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2018 | Dec 2022 | Solar : 99.9% |
Santa Rosa Junior College Petaluma Solar | Sonoma County Junior College District | Petaluma, CA | California Independent System Operator (CISO) | 17.4 MWh | Jun 2018 | Dec 2022 | Solar |
SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2018 | Dec 2022 | Solar |
Chaffey College Rancho Cucamonga Campus | Chaffey Community College District | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 8.2 GWh | Jan 2017 | Dec 2022 | Solar |
Aerolease | PCS Energy, LLC | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 2.0 GWh | Jul 2018 | Dec 2022 | Solar |
IVC Solar | Imperial Irrigation District | Imperial, CA | Imperial Irrigation District (IID) | 5.4 GWh | Nov 2016 | Dec 2022 | Solar |
CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 3.5 GWh | Nov 2018 | Dec 2022 | Solar |
Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2018 | Dec 2022 | Solar |
Westmont 401 | Westmont Solar, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Oct 2017 | Dec 2022 | Solar |
Westmont 301 | Westmont Solar, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 3.3 GWh | Oct 2017 | Dec 2022 | Solar |
Westmont 400B | Westmont Solar, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Jun 2017 | Dec 2022 | Solar |
Westmont 400A | Westmont Solar, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Jun 2017 | Dec 2022 | Solar |
Port of LA Solar FiT Project | Los Angeles Department of Water & Power | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 1.9 GWh | Sep 2015 | Dec 2022 | Solar |
USPS PV | USPS LA Solar FiT A & B | Los Angeles, CA | California Independent System Operator (CISO) | 13.1 GWh | Jun 2017 | Dec 2022 | Solar |
Westmont 300A | Westmont Solar, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.9 GWh | Feb 2017 | Dec 2022 | Solar |
Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 2020 | Dec 2022 | Solar |
NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 51.6 GWh | Feb 2017 | Dec 2022 | Solar |
Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 56.6 GWh | Feb 2017 | Dec 2022 | Solar |
UC Santa Cruz Solar | Forefront Power, LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2022 | Solar |
Owens Valley Solar Project 11 | Los Angeles Department of Water & Power | Olancha, CA | Los Angeles Department of Water and Power (LDWP) | 2.7 GWh | Nov 2016 | Dec 2022 | Solar |
Westmont 300B | Westmont Solar, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.9 GWh | Nov 2016 | Dec 2022 | Solar |
Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.4 GWh | Apr 2019 | Dec 2022 | Solar |
Castaic Lake Phase II | MN8 Energy LLC | Santa Clara, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2014 | Dec 2022 | Solar |
RE-VFO LLC | RE-VFO LLC | Visalia, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2009 | Dec 2022 | Solar |
North City - Landfill Gas Engine North | City of San Diego | San Diego, CA | California Independent System Operator (CISO) | 4.8 GWh | Oct 2013 | Dec 2022 | Landfill Gas |
Canyon Crest Academy | SDGE Batteries | San Diego, CA | California Independent System Operator (CISO) | 60.8 MWh | Sep 2014 | Dec 2022 | Electricity used for energy storage |
D'Arrigo Brothers - Phase 4 | CalCom Energy | Salinas, CA | California Independent System Operator (CISO) | 4.7 GWh | Feb 2019 | Dec 2022 | Solar |
Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 50.8 GWh | Nov 2017 | Dec 2022 | Solar |
Walnut Unified School District Walnut HS Hybrid | Tesla Inc. | Walnut, CA | California Independent System Operator (CISO) | 1.9 GWh | Jan 2020 | Dec 2022 | Solar |
OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 4.0 MWh | - | Dec 2022 | Other Biomass Gas |
Pleasanton - Amador Valley High School | Westbound Solar LLC | Pleasanton, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2019 | Dec 2022 | Solar |
Central Antelope Dry Ranch B LLC | Central Antelope Dry Ranch B, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.5 GWh | Aug 2017 | Dec 2022 | Solar |
Castor Solar | ZGlobal Inc | Dustin Acres, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2016 | Dec 2022 | Solar |
RE Garland | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 451.8 GWh | Oct 2016 | Dec 2022 | Solar |
Genentech-Oceanside Hybrid | Tesla Inc. | Oceanside, CA | California Independent System Operator (CISO) | 7.4 GWh | Mar 2016 | Dec 2022 | Solar |
Kroger La Habra | Ralph's Grocery Company | La Habra, CA | California Independent System Operator (CISO) | 2.0 GWh | Mar 2020 | Dec 2022 | Solar |
Blythe Solar 110, LLC | Blythe Solar 110, LLC | Blythe, CA | California Independent System Operator (CISO) | 287.2 GWh | Feb 2016 | Dec 2022 | Solar |
Firestone Walker Brewery - Phase 1 | SkyHigh 2 Solar | Paso Robles, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2020 | Dec 2022 | Solar |
EMWD - Perris Valley RWRF | SkyHigh 2 Solar | Perris, CA | California Independent System Operator (CISO) | 8.9 GWh | Jun 2021 | Dec 2022 | Solar |
EMWD - Sun City RWRF | SkyHigh 2 Solar | Menifee, CA | California Independent System Operator (CISO) | 4.0 GWh | Jun 2021 | Dec 2022 | Solar |
Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Aug 2015 | Dec 2022 | Solar |
Golden Hills Wind | Golden Hills Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 269.0 GWh | Nov 2015 | Dec 2022 | Wind |
EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 6.7 GWh | Apr 2022 | Dec 2022 | Solar |
CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2021 | Dec 2022 | Solar |
El Dorado County | SkyHigh 2 Solar | Placerville, CA | California Independent System Operator (CISO) | 3.3 GWh | Feb 2021 | Dec 2022 | Solar |
California State Univ at Channel Islands | SkyHigh 2 Solar | Camarillo, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2021 | Dec 2022 | Solar |
EMWD - Moreno Valley RWRF | SkyHigh 2 Solar | Moreno Valley, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2021 | Dec 2022 | Solar |
Big Bear | Los Palos Street Operating, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 9.2 GWh | Nov 2020 | Dec 2022 | Solar |
Adapture CA2, LLC | Adapture Renewables, Inc. | Orland, CA | PacifiCorp West (PACW) | 3.7 GWh | Feb 2016 | Dec 2022 | Solar |
Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 2.5 GWh | Aug 2015 | Dec 2022 | Solar |
RE Tranquillity | Southern Power Co | Cantua Creek, CA | California Independent System Operator (CISO) | 444.4 GWh | Jun 2016 | Dec 2022 | Solar |
SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2020 | Dec 2022 | Solar : 99.9% |
Lake Herman | Greenbacker Renewable Energy Corporation | Benicia, CA | California Independent System Operator (CISO) | 9.1 GWh | Oct 2021 | Dec 2022 | Solar |
Van der Hoek Solar Array/ Dairy | Maas Energy Works | Helm, CA | California Independent System Operator (CISO) | 189.3 MWh | Jul 2017 | Dec 2022 | Solar |
Riverside RWQCP Fuel Cell | Riverside Fuel Cell, LLC | Riverside, CA | California Independent System Operator (CISO) | 11.4 GWh | Jul 2016 | Dec 2022 | Other Biomass Gas : 65.6% Natural Gas : 34.4% |
Catalina Express | USPS LA Solar FiT A & B | San Pedro, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2020 | Dec 2022 | Solar |
Marina South | USPS LA Solar FiT A & B | San Pedro, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2020 | Dec 2022 | Solar |
Prairie | Prairie Street Operating, LLC | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Mar 2021 | Dec 2022 | Solar |
Amazon San Bernardino | Bloom Energy | San Bernardino, CA | California Independent System Operator (CISO) | 6.6 GWh | Oct 2014 | Dec 2022 | Natural Gas |
Kings River Syphon | Orange Cove Irrigation District | Sanger, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 1990 | Dec 2022 | Water |
Foothill Sanitary Landfill - Solar Array | Ameresco San Joaquin Solar LLC | Linden, CA | PacifiCorp West (PACW) | 8.5 GWh | Dec 2020 | Dec 2022 | Solar |
University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 5.2 GWh | Apr 2022 | Dec 2022 | Solar |
Five H Farms Solar Array | Maas Energy Works | Merced, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2021 | Dec 2022 | Solar |
Van der Kooi Dairy Solar Array | Maas Energy Works | Riverdale, CA | California Independent System Operator (CISO) | 3.3 GWh | Mar 2021 | Dec 2022 | Solar |
SPI Anderson 2 | Sierra Pacific Industries | Anderson, CA | California Independent System Operator (CISO) | 129.5 GWh | Jul 2015 | Dec 2022 | Wood/Wood Waste Solids |
Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 1.8 GWh | Sep 2009 | Dec 2022 | Solar |
Forever 21 Retail, Inc. | Los Angeles Department of Water & Power | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 2.3 GWh | Jan 2015 | Dec 2022 | Solar |
Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2016 | Dec 2022 | Solar |
Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 3.3 GWh | Aug 2018 | Dec 2022 | Solar |
Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 4.9 GWh | May 2015 | Dec 2022 | Solar |
Putah Creek Solar Farm | Solvida Energy Group/Blue Oak Energy | Winters, CA | California Independent System Operator (CISO) | 5.4 GWh | Nov 2014 | Dec 2022 | Solar |
Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 57.1 GWh | Dec 2015 | Dec 2022 | Solar |
8500 Balboa PV, LLC | 8500 Balboa PV, LLC | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 5.2 GWh | Jan 2022 | Dec 2022 | Solar |
City of Tulare Water Facility | City of Tulare Water Pollution Control | Tulare, CA | California Independent System Operator (CISO) | 25.8 GWh | Dec 1990 | Dec 2022 | Natural Gas : 83.5% Solar : 16.2% |
Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 52.6 GWh | Aug 2015 | Dec 2022 | Solar |
SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2011 | Dec 2022 | Solar |
Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 17.3 GWh | Jun 2015 | Dec 2022 | Solar |
RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 210.4 GWh | Jul 2016 | Dec 2022 | Solar |
Gilead Oceanside Solar Project | Gilead Sciences Inc. | Oceanside, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2021 | Dec 2022 | Solar |
Gilead Foster City Solar Project | Gilead Sciences Inc. Foster City | Foster City, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2021 | Dec 2022 | Solar |
Putah Creek Solar Farm North | Putah Creek Solar Farms LLC | Winters, CA | California Independent System Operator (CISO) | 5.2 GWh | Sep 2022 | Dec 2022 | Solar |
Laredo Detention Facility - Solar 2, 3 | County of Kern | Bakersfield, CA | California Independent System Operator (CISO) | 9.0 GWh | Oct 2021 | Dec 2022 | Solar |
Sealed Air Madera Solar Project | Sealed Air Corporation | Madera, CA | California Independent System Operator (CISO) | 2.0 MWh | Apr 2022 | Dec 2022 | Solar |
Kaiser - Harbor City | Bloom Energy | Harbor City, CA | California Independent System Operator (CISO) | 17.5 GWh | Nov 2019 | Dec 2022 | Natural Gas |
Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 51.3 GWh | Apr 2015 | Dec 2022 | Solar |
Blue Skies Solar, LLC | Blue Skies Solar, LLC | Arvin, CA | PacifiCorp West (PACW) | 239.0 MWh | Nov 2021 | Dec 2022 | Solar |
Kaiser - LA | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 36.1 GWh | May 2020 | Dec 2022 | Natural Gas |
BBARWA | Distributed Solar Development, LLC | Big Bear, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2021 | Dec 2022 | Solar |
Niagara Bottling - Rialto | SkyHigh 2 Solar | Rialto, CA | California Independent System Operator (CISO) | 8.6 GWh | Nov 2021 | Dec 2022 | Solar |
Canal Energy S23, LLC | Canal Energy S23, LLC | Hanford, CA | California Independent System Operator (CISO) | 7.7 GWh | Nov 2021 | Dec 2022 | Solar |
Gilead Sciences La Verne Rooftop Solar | Gilead Sciences, Inc. - La Verne | La Verne, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2022 | Solar |
Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2020 | Dec 2022 | Natural Gas |
Kaiser - Woodland Hills | Bloom Energy | Woodland Hills, CA | California Independent System Operator (CISO) | 21.7 GWh | Aug 2019 | Dec 2022 | Natural Gas |
Rising Tree Wind Farm III | Rising Tree Wind Farm III LLC | Mojave, CA | California Independent System Operator (CISO) | 275.2 GWh | May 2015 | Dec 2022 | Wind |
Google Moffett Park Solar Project | Google, Inc. | Sunnyvale, CA | California Independent System Operator (CISO) | 3.0 GWh | Feb 2021 | Dec 2022 | Solar |
San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 7.8 GWh | Feb 2020 | Dec 2022 | Natural Gas |
20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Jun 2022 | Dec 2022 | Solar |
Burney Forest Products | Burney Forest Products, A Joint Venture | Burney, CA | California Independent System Operator (CISO) | 242.3 GWh | Sep 1989 | Dec 2022 | Wood/Wood Waste Solids : 96.9% Natural Gas : 3.1% |
Browse Power Plants By California Counties
Figures are based on June 2024 generation numbers.County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 283 | 36.2 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 25 | 1.5 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Glenn County, CA | # 55 | 2 | 8.3 GWh |