Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 9.1 GWh | May 2021 | Dec 2023 | Natural Gas |
Graniterock Quarry | CalCom Energy | Aromas, CA | California Independent System Operator (CISO) | 9.1 GWh | Aug 2022 | Dec 2023 | Solar |
Laredo Detention Facility - Solar 2, 3 | County of Kern | Bakersfield, CA | California Independent System Operator (CISO) | 9.2 GWh | Oct 2021 | Dec 2023 | Solar |
Pleasant Valley Hydro | Los Angeles Department of Water & Power | Bishop, CA | Los Angeles Department of Water and Power (LDWP) | 9.2 GWh | Jan 1958 | Dec 2023 | Water |
Drop 5 | Imperial Irrigation District | Calexico, CA | Imperial Irrigation District (IID) | 9.2 GWh | Feb 1982 | Dec 2023 | Water |
Dynegy Oakland Power Plant | Dynegy Oakland, LLC | Oakland, CA | California Independent System Operator (CISO) | 9.3 GWh | Oct 1978 | Aug 2024 | Jet Fuel |
Sierra Nevada Brewing Co Hybrid | Sierra Nevada Brewing Co | Chico, CA | California Independent System Operator (CISO) | 9.3 GWh | Apr 2005 | Dec 2023 | Natural Gas : 75.4% Solar : 24.6% |
Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 9.3 GWh | Apr 2013 | Dec 2023 | Landfill Gas |
Wonderful Orchards - New Columbia | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 9.4 GWh | Aug 2020 | Dec 2023 | Solar |
Lancaster Dry Farm Ranch B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 9.4 GWh | Oct 2014 | Dec 2023 | Solar |
Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.4 GWh | May 2015 | Dec 2023 | Solar |
Riverside RWQCP Fuel Cell | Riverside Fuel Cell, LLC | Riverside, CA | California Independent System Operator (CISO) | 9.4 GWh | Jul 2016 | Dec 2023 | Other Biomass Gas : 84.9% Natural Gas : 15.1% |
SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2021 | Dec 2023 | Other Biomass Gas : 96.8% Natural Gas : 3.2% |
EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 9.5 GWh | Jun 2021 | Dec 2023 | Solar |
RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 9.5 GWh | Nov 2013 | Dec 2023 | Solar |
Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 9.6 GWh | Aug 2023 | Dec 2023 | Solar |
Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 9.6 GWh | Nov 2012 | Dec 2023 | Wind |
Bishop Creek 6 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 9.6 GWh | Feb 1913 | Dec 2023 | Water |
Sunnyvale City of WPCP | Sunnyvale City of WPCP | Sunnyvale, CA | California Independent System Operator (CISO) | 9.7 GWh | Oct 1997 | Dec 2023 | Natural Gas : 40.7% Landfill Gas : 30.6% Other Biomass Gas : 28.7% |
Ripon Generation Station | Modesto Irrigation District | Ripon, CA | Balancing Authority of Northern California (BANC) | 9.7 GWh | May 2006 | Dec 2023 | Natural Gas |
MM Tulare Energy | MM Tulare Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 9.7 GWh | Apr 1998 | Dec 2023 | Landfill Gas |
Gianera | City of Santa Clara - (CA) | Santa Clara, CA | California Independent System Operator (CISO) | 9.9 GWh | May 1986 | Dec 2023 | Natural Gas |
Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 9.9 GWh | Nov 2020 | Dec 2023 | Natural Gas |
Santa Cruz Energy | Santa Cruz Energy LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 10.0 GWh | Oct 2009 | Dec 2023 | Landfill Gas |
Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 10.0 GWh | Jun 2013 | Dec 2023 | Landfill Gas |
SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2019 | Dec 2023 | Solar |
Wonderful Firebaugh | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 10.1 GWh | Jul 2022 | Dec 2023 | Solar |
Long Beach Generation LLC | Long Beach Generation LLC | Long Beach, CA | California Independent System Operator (CISO) | 10.1 GWh | Nov 1976 | Dec 2023 | Natural Gas |
Goal Line LP | Goal Line LP | Escondido, CA | California Independent System Operator (CISO) | 10.2 GWh | Jul 1994 | Aug 2024 | Natural Gas |
Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 10.2 GWh | May 2003 | Dec 2023 | Natural Gas |
City of Hayward WWTP | City of Hayward | Hayward, CA | California Independent System Operator (CISO) | 10.3 GWh | Oct 2010 | Dec 2023 | Other Biomass Gas : 66.0% Solar : 30.5% Natural Gas : 3.5% |
Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 10.4 GWh | Mar 2017 | Dec 2023 | Natural Gas |
Malaga Power LLC | CalPeak Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 10.5 GWh | Aug 2005 | Aug 2024 | Natural Gas |
Mill Creek 3 | Southern California Edison Co | Mill Creek, CA | California Independent System Operator (CISO) | 10.5 GWh | Feb 1903 | Dec 2023 | Water |
Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 10.6 GWh | Jul 2011 | Dec 2023 | Solar |
Big Creek Water Works | Big Creek Water Works Ltd | Hyampom, CA | California Independent System Operator (CISO) | 10.6 GWh | Dec 1986 | Jun 2024 | Water |
OLS Energy Chino | OLS Energy-Chino | Chino, CA | California Independent System Operator (CISO) | 10.7 GWh | Nov 1987 | Dec 2023 | Natural Gas |
RE Bruceville 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.7 GWh | Jan 2012 | Dec 2023 | Solar |
San Antonio Regional Hospital | San Antonio Regional Hospital | Upland, CA | California Independent System Operator (CISO) | 10.7 GWh | Dec 1984 | Dec 2023 | Natural Gas |
Edom Hills Project 1 LLC | Edom Hills Project 1 LLC | Cathedral City, CA | California Independent System Operator (CISO) | 10.8 GWh | Aug 2008 | Dec 2023 | Wind |
Lake One | City of Burbank Water and Power | Burbank, CA | Los Angeles Department of Water and Power (LDWP) | 10.8 GWh | May 2002 | Oct 2023 | Natural Gas |
USPS PV | Altus Power America Management, LLC | Los Angeles, CA | California Independent System Operator (CISO) | 10.8 GWh | Jun 2017 | Dec 2023 | Solar |
New Hogan Power Plant | Modesto Irrigation District | Valley Springs, CA | California Independent System Operator (CISO) | 10.8 GWh | Mar 1989 | Dec 2023 | Water |
RE Bruceville 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.8 GWh | Dec 2011 | Dec 2023 | Solar |
G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 10.8 GWh | May 2013 | Dec 2023 | Landfill Gas |
Diamond H Dairy Power | Madera DP 2, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 10.9 GWh | Sep 2021 | Dec 2023 | Other Biomass Gas |
HL Solar | HL Solar LLC | Wendel, CA | California Independent System Operator (CISO) | 10.9 GWh | May 2019 | Dec 2023 | Solar |
SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 10.9 GWh | Nov 2018 | Dec 2023 | Natural Gas |
Slate Creek | Central Rivers Power US, LLC | Lakehead, CA | PacifiCorp West (PACW) | 11.0 GWh | Apr 1990 | Dec 2023 | Water |
Lake Mendocino | City of Ukiah - (CA) | Ukiah, CA | California Independent System Operator (CISO) | 11.1 GWh | Apr 1987 | Dec 2023 | Water |
Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.1 GWh | Nov 2014 | Dec 2023 | Solar |
Springs Generating Station | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 11.1 GWh | Jun 2002 | Dec 2023 | Natural Gas |
RE Bruceville 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.1 GWh | Jan 2012 | Dec 2023 | Solar |
Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 11.1 GWh | Nov 2016 | Dec 2023 | Natural Gas |
Mira Loma Peaker | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 11.2 GWh | Aug 2007 | Dec 2023 | Natural Gas |
Bidwell Ditch Project | Mega Renewables | Hat Creek, CA | California Independent System Operator (CISO) | 11.2 GWh | Feb 1987 | Dec 2023 | Water |
RE Kammerer 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Dec 2011 | Dec 2023 | Solar |
RE Kammerer 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Jan 2012 | Dec 2023 | Solar |
RE Kammerer 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Jan 2012 | Dec 2023 | Solar |
Lundy | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 11.3 GWh | Nov 1911 | Dec 2023 | Water |
McGrath Peaker | Southern California Edison Co | Oxnard, CA | California Independent System Operator (CISO) | 11.4 GWh | Oct 2012 | Dec 2023 | Natural Gas |
Biola University Hybrid | Biola University | La Mirada, CA | California Independent System Operator (CISO) | 11.4 GWh | Mar 1990 | Aug 2024 | Natural Gas |
Olive View Medical Center | Los Angeles County DHS | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 11.4 GWh | Jan 1987 | Feb 2024 | Natural Gas |
Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.4 GWh | May 2021 | Dec 2023 | Solar |
RE McKenzie 6 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.4 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 5 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.4 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 2 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.5 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 4 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.5 GWh | Oct 2012 | Dec 2023 | Solar |
Adelanto Solar Project | Los Angeles Department of Water & Power | Adelanto, CA | Los Angeles Department of Water and Power (LDWP) | 11.5 GWh | May 2012 | Apr 2023 | Solar |
Upper Dawson | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 11.5 GWh | Oct 1983 | Dec 2023 | Water |
RE McKenzie 3 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2023 | Solar |
RE McKenzie 1 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2023 | Solar |
Deer Creek PH | Pacific Gas & Electric Co. | Nevada City, CA | California Independent System Operator (CISO) | 11.6 GWh | Apr 1908 | Nov 2023 | Water |
SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 11.8 GWh | Sep 2017 | Dec 2023 | Solar |
Wonderful Orchards - Westside | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 11.8 GWh | Jul 2021 | Dec 2023 | Solar |
Red Bluff | California Power Holdings LLC | Red Bluff, CA | California Independent System Operator (CISO) | 11.9 GWh | Jul 2001 | Dec 2023 | Natural Gas |
Wonderful Orchards - Belridge | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2020 | Dec 2023 | Solar |
Cuyamaca Peak Energy Plant | San Diego Gas & Electric Co | El Cajon, CA | California Independent System Operator (CISO) | 12.1 GWh | Apr 2002 | Dec 2023 | Natural Gas |
King City Peaking | Calpine Corp-King City | King City, CA | California Independent System Operator (CISO) | 12.2 GWh | Mar 2002 | Dec 2023 | Natural Gas |
Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 12.4 GWh | Apr 2017 | Dec 2023 | Solar |
Tulare BioMAT Fuel Cell | Central CA Fuel Cell 2, LLC | Tulare, CA | California Independent System Operator (CISO) | 12.5 GWh | Nov 2019 | Dec 2023 | Other Biomass Gas : 81.3% Natural Gas : 18.7% |
Merced Falls | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 12.5 GWh | Jun 1930 | Oct 2023 | Water |
Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.6 GWh | Nov 2016 | Dec 2023 | Solar |
Tehachapi Wind Resource I | CalWind Resources Inc | Tehachapi, CA | California Independent System Operator (CISO) | 12.6 GWh | Nov 1984 | Dec 2023 | Wind |
Byron Highway Solar | RPCA Solar 3, LLC | Byron, CA | California Independent System Operator (CISO) | 12.8 GWh | Oct 2022 | Dec 2023 | Solar |
Siphon Drop Power Plant | Yuma County Water User's Association | Winterhaven, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 12.8 GWh | Aug 1987 | Dec 2023 | Water |
Miramar Energy Facility | San Diego Gas & Electric Co | San Diego, CA | California Independent System Operator (CISO) | 12.9 GWh | May 2005 | Aug 2024 | Natural Gas |
Santa Rita Jail Hybrid | County of Alameda GSA | Dublin, CA | California Independent System Operator (CISO) | 13.1 GWh | Aug 2001 | Dec 2023 | Natural Gas : 80.9% Solar : 19.1% |
Lake Herman | Greenbacker Renewable Energy Corporation | Benicia, CA | California Independent System Operator (CISO) | 13.1 GWh | Oct 2021 | Dec 2023 | Solar |
Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 13.1 GWh | Feb 2005 | Dec 2023 | Natural Gas |
Tequesquite Landfill Solar PV Project | Solar Star California XXXI, LLC | Riverside, CA | California Independent System Operator (CISO) | 13.2 GWh | Sep 2015 | Dec 2023 | Solar |
CalPeak Power Border Peaker Plant | CalPeak Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 13.2 GWh | Oct 2001 | Dec 2023 | Natural Gas |
Rancho Seco Solar, LLC | Rancho Seco Solar, LLC | Herald, CA | Balancing Authority of Northern California (BANC) | 13.3 GWh | Jul 2016 | Dec 2023 | Solar |
Community Solar 1 | Community Solar I | Brawley, CA | Imperial Irrigation District (IID) | 13.3 GWh | May 2014 | Dec 2023 | Solar |
Giffen | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 13.4 GWh | May 2012 | Dec 2023 | Solar |
Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 13.5 GWh | May 2021 | Dec 2023 | Natural Gas |
Stony Gorge | City of Santa Clara - (CA) | Elk Creek, CA | California Independent System Operator (CISO) | 13.5 GWh | Mar 1986 | Dec 2023 | Water |
Chowchilla II | California Power Holdings LLC | Chowchilla, CA | California Independent System Operator (CISO) | 13.6 GWh | May 2001 | Dec 2023 | Natural Gas |
Wagner Wind LLC | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 13.7 GWh | Nov 2012 | Dec 2023 | Wind |
Bishop Creek 5 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 13.7 GWh | May 1919 | Dec 2023 | Water |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 4 | 11.1 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Madera County, CA | # 29 | 26 | 1.3 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.8 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
Kern County, CA | # 1 | 293 | 32.9 TWh |