Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Wonderful Lost Hills | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 48.3 GWh | Aug 2021 | Dec 2023 | Solar |
Dome Project | Sentinel Peak Resources California, LLC | Fellows, CA | California Independent System Operator (CISO) | 48.7 GWh | Jul 1988 | Dec 2023 | Natural Gas |
Midway Solar Farm III | Greenbacker Renewable Energy Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 48.9 GWh | Aug 2018 | Dec 2023 | Solar |
RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.1 GWh | Dec 2013 | Dec 2023 | Solar |
Ampersand Chowchilla Biomass LLC | Ampersand Chowchilla Biomass LLC | Chowchilla, CA | California Independent System Operator (CISO) | 49.1 GWh | Apr 2008 | Mar 2023 | Wood/Wood Waste Solids : 99.8% |
Corcoran Solar 3 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 49.2 GWh | Jan 2016 | Dec 2023 | Solar |
White River Solar 2 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 49.3 GWh | Aug 2014 | Dec 2023 | Solar |
Yuba City Energy Center | Calpine Corp-Yuba City | Yuba City, CA | California Independent System Operator (CISO) | 49.3 GWh | Jul 2002 | Dec 2023 | Natural Gas |
Western Antelope Blue Sky B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 49.3 GWh | Nov 2016 | Dec 2023 | Solar |
Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 49.7 GWh | Feb 2017 | Dec 2023 | Solar |
Bishop Creek 4 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 49.8 GWh | Aug 1905 | Dec 2023 | Water |
Lone Valley Solar Park II LLC | Lone Valley Solar Park II LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 49.8 GWh | Nov 2014 | Dec 2023 | Solar |
Phillips 66 Carbon Plant | Phillips 66 Company | Rodeo, CA | California Independent System Operator (CISO) | 50.1 GWh | Nov 1983 | Jun 2023 | Waste Heat |
Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 50.3 GWh | Nov 2021 | Aug 2024 | Solar |
Seville 1 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 50.3 GWh | Nov 2015 | Nov 2023 | Solar |
RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 51.1 GWh | May 2013 | Dec 2023 | Solar |
SEPV Mojave West | AES Distributed Energy | Mojave, CA | California Independent System Operator (CISO) | 51.1 GWh | May 2016 | Dec 2023 | Solar |
Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 51.3 GWh | Dec 2015 | Dec 2023 | Solar |
Loma Linda University Cogen | Loma Linda University | Loma Linda, CA | California Independent System Operator (CISO) | 52.3 GWh | Jan 1980 | Aug 2024 | Natural Gas |
Riverside Energy Resource Center | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 52.6 GWh | May 2006 | Dec 2023 | Natural Gas |
Cascade Solar | Cascade Solar LLC | Joshua Tree, CA | California Independent System Operator (CISO) | 53.0 GWh | Dec 2013 | Dec 2023 | Solar |
TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 53.4 GWh | Oct 2014 | Dec 2023 | Solar |
Axium Modesto Solar | Axium US Solar Holdings LLC | Modesto, CA | California Independent System Operator (CISO) | 53.7 GWh | Nov 2012 | Dec 2023 | Solar |
Mojave 16/17/18 | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 53.9 GWh | Nov 1989 | Dec 2023 | Wind |
Cymric 36W Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 54.4 GWh | Sep 1982 | Dec 2023 | Natural Gas |
CE Turbo LLC | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 54.8 GWh | Jun 2000 | Sep 2023 | Geothermal |
Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 54.9 GWh | Aug 2015 | Dec 2023 | Solar |
Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 55.6 GWh | Mar 2016 | Dec 2023 | Solar |
Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 56.2 GWh | Mar 2016 | Dec 2023 | Solar |
San Diego State University | San Diego State University | San Diego, CA | California Independent System Operator (CISO) | 56.5 GWh | Aug 2002 | Aug 2024 | Natural Gas : 97.6% Solar : 2.4% |
Sunray 2 | Sunray Energy 2, LLC | Daggett, CA | California Independent System Operator (CISO) | 56.7 GWh | Nov 1984 | Dec 2023 | Solar |
Citizens Imperial Solar | Citizens Enterprises Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 57.2 GWh | Jul 2019 | Aug 2024 | Solar |
Roseburg Forest Products Biomass | Roseburg Forest Products | Weed, CA | PacifiCorp West (PACW) | 57.4 GWh | Nov 1989 | Dec 2023 | Wood/Wood Waste Solids |
Mammoth G1 | Ormat Nevada Inc | Mammoth lakes, CA | California Independent System Operator (CISO) | 57.7 GWh | Nov 1984 | Dec 2023 | Geothermal |
Camanche | East Bay Municipal Util Dist | Clements & Wallace, CA | California Independent System Operator (CISO) | 58.1 GWh | Jun 1983 | Dec 2023 | Water |
Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 58.4 GWh | Nov 2015 | Dec 2023 | Solar |
McKittrick Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 58.5 GWh | May 2012 | Dec 2023 | Natural Gas |
Potrero Hills Energy Producers | Potrero Hills Energy Producers, LLC | Suisun City, CA | California Independent System Operator (CISO) | 58.7 GWh | Mar 2016 | Dec 2023 | Landfill Gas |
Taft 26C Cogen | Chevron USA Inc | Taft, CA | California Independent System Operator (CISO) | 58.9 GWh | Jun 1982 | Aug 2024 | Natural Gas |
Plant No 2 Orange County | Orange County Sanitation Dist | Huntington Beach, CA | California Independent System Operator (CISO) | 59.0 GWh | May 1993 | Dec 2023 | Other Biomass Gas : 77.5% Natural Gas : 22.5% |
Pine Tree Wind Power Project | Los Angeles Department of Water & Power | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 61.0 GWh | May 2009 | Dec 2023 | Wind |
Terminus Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Lemon Cove, CA | California Independent System Operator (CISO) | 61.3 GWh | Feb 1990 | Dec 2023 | Water |
San Gorgonio Farms Wind Farm | San Gorgonio Farms Inc | Whitewater, CA | California Independent System Operator (CISO) | 61.8 GWh | Feb 1983 | Dec 2023 | Wind |
Mammoth G2 | Ormat Nevada Inc | Mammoth Lakes, CA | California Independent System Operator (CISO) | 62.3 GWh | Nov 1990 | Dec 2023 | Geothermal |
85 A | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 62.9 GWh | Dec 1984 | Dec 2023 | Wind |
Solar Borrego I | NRG Solar Borrego I | Borrego Springs, CA | California Independent System Operator (CISO) | 64.6 GWh | Jan 2013 | Dec 2023 | Solar |
Wise | Pacific Gas & Electric Co. | Auburn, CA | California Independent System Operator (CISO) | 64.6 GWh | Feb 1917 | Dec 2023 | Water |
Kelly Ridge | South Feather Water and Power Agency | Oroville, CA | California Independent System Operator (CISO) | 65.0 GWh | Aug 1963 | Dec 2023 | Water |
Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 65.3 GWh | Mar 2020 | Aug 2024 | Solar |
Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 66.6 GWh | Apr 2017 | Aug 2024 | Solar |
Kiefer Landfill | Sacramento County of Dpt Waste | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 66.6 GWh | Nov 1999 | Dec 2023 | Landfill Gas |
Coalinga 25D Cogen | Chevron USA Inc | Coalinga, CA | California Independent System Operator (CISO) | 67.0 GWh | Sep 1986 | Dec 2023 | Natural Gas |
French Meadows | Placer County Water Agency | Foresthill, CA | California Independent System Operator (CISO) | 67.4 GWh | Sep 1966 | Dec 2023 | Water |
Ormesa III | Ormat Nevada Inc | Holtville, CA | Imperial Irrigation District (IID) | 68.5 GWh | Apr 1989 | Dec 2023 | Geothermal |
Central 40 | Central 40, LLC | Newman, CA | California Independent System Operator (CISO) | 68.7 GWh | Jan 2021 | Aug 2024 | Solar |
Mountain View III | Avangrid Renewables LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 68.7 GWh | Nov 2003 | Dec 2023 | Wind |
San Francisquito 2 | Los Angeles Department of Water & Power | Saugus, CA | Los Angeles Department of Water and Power (LDWP) | 69.0 GWh | Jun 1920 | Dec 2023 | Water |
Robbs Peak | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 69.1 GWh | Sep 1965 | Dec 2023 | Water |
Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 69.3 GWh | Dec 1995 | Aug 2024 | Natural Gas |
Mojave Siphon | California Dept. of Water Resources | Hesperia, CA | California Independent System Operator (CISO) | 69.6 GWh | Jul 1996 | Dec 2023 | Water |
Nimbus | U S Bureau of Reclamation | Folsom, CA | Balancing Authority of Northern California (BANC) | 69.9 GWh | Apr 1955 | Dec 2023 | Water |
Voyager Wind IV | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 70.2 GWh | Nov 2018 | Dec 2023 | Wind |
Carson Ice-Gen Project | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 71.3 GWh | Sep 1995 | Aug 2024 | Natural Gas : 99.9% |
Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 71.4 GWh | Oct 2022 | Aug 2024 | Solar |
Copco 1 | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 71.4 GWh | Dec 1917 | Dec 2023 | Water |
Alpaugh 50 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 71.7 GWh | Nov 2012 | Dec 2023 | Solar |
Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 71.7 GWh | Oct 2017 | Dec 2023 | Natural Gas |
Rollins | Nevada Irrigation District | Colfax, CA | California Independent System Operator (CISO) | 73.1 GWh | Jul 1980 | Dec 2023 | Water |
Narrows PH | Yuba County Water Agency | Grass Valley, CA | California Independent System Operator (CISO) | 73.5 GWh | Nov 1942 | Dec 2023 | Water |
Wadham Energy LP | Wadham Energy Ltd Partners | Williams, CA | California Independent System Operator (CISO) | 74.4 GWh | Feb 1989 | Dec 2023 | Agricultural By-Products : 99.5% Natural Gas : 0.5% |
Gilroy Power Plant | Calpine Gilroy Cogen LP | Gilroy, CA | California Independent System Operator (CISO) | 74.5 GWh | Sep 1987 | Nov 2023 | Natural Gas |
Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 74.8 GWh | Oct 2017 | Aug 2024 | Solar |
Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 75.4 GWh | Nov 2023 | Aug 2024 | Solar |
Salton Sea Power Gen Co Unit 1 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 75.9 GWh | Jun 1982 | Dec 2023 | Geothermal |
Lost Hills/Blackwell | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 77.1 GWh | Mar 2015 | Dec 2023 | Solar |
Aidlin Geothermal Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 77.3 GWh | Apr 1989 | Dec 2023 | Geothermal |
Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 79.4 GWh | Feb 2022 | Aug 2024 | Solar |
Drop 4 | Imperial Irrigation District | Holtville, CA | Imperial Irrigation District (IID) | 79.8 GWh | Jan 1941 | Dec 2023 | Water |
Elk Hills Cogen | California Resources Elk Hills LLC | Tupman, CA | California Independent System Operator (CISO) | 80.7 GWh | Oct 1994 | Aug 2024 | Natural Gas |
Iron Gate | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 81.5 GWh | Jan 1962 | Dec 2023 | Water |
SJ/SC WPCP | San Jose/Santa Clara Water P C | San Jose, CA | California Independent System Operator (CISO) | 81.5 GWh | Jan 1953 | Aug 2024 | Other Biomass Gas : 50.4% Natural Gas : 49.5% |
Canyon Power Plant | City of Anaheim - (CA) | Anaheim, CA | California Independent System Operator (CISO) | 81.6 GWh | Jul 2011 | Aug 2024 | Natural Gas |
West Point PH | Pacific Gas & Electric Co. | Pioneer, CA | California Independent System Operator (CISO) | 81.9 GWh | Oct 1948 | Dec 2023 | Water |
Beardsley | Oakdale&South San Joaquin Irrigation D. | None, CA | California Independent System Operator (CISO) | 82.7 GWh | Apr 1957 | Dec 2023 | Water |
Muck Valley Hydroelectric | Brookfield Renewable Trading and Marketing LP | NA, CA | California Independent System Operator (CISO) | 82.8 GWh | Nov 1988 | Dec 2023 | Water |
Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 83.0 GWh | Nov 2020 | Aug 2024 | Solar |
Seville 2 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 83.0 GWh | Nov 2015 | Dec 2023 | Solar |
CP Kelco San Diego Plant | CP Kelco US Inc. | San Diego, CA | California Independent System Operator (CISO) | 83.2 GWh | Sep 1983 | Aug 2024 | Natural Gas |
Mojave 3/4/5 | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 83.2 GWh | Nov 1990 | Dec 2023 | Wind |
Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 84.0 GWh | Nov 2008 | Aug 2024 | Landfill Gas |
Bucks Creek | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 84.5 GWh | Feb 1928 | Sep 2023 | Water |
Ocotillo Wells | Conductive Power | Borrego Springs, CA | California Independent System Operator (CISO) | 86.8 GWh | Aug 2023 | Aug 2024 | Solar |
85 B | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 86.9 GWh | Dec 1984 | Dec 2023 | Wind |
Copco 2 | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 87.0 GWh | Jun 1925 | May 2023 | Water |
Sierra Pacific Lincoln Facility | Sierra Pacific Industries | Lincoln, CA | California Independent System Operator (CISO) | 87.9 GWh | Feb 2004 | Dec 2023 | Wood/Wood Waste Solids |
Drum 1 | Pacific Gas & Electric Co. | Alta, CA | California Independent System Operator (CISO) | 88.2 GWh | Oct 1913 | Dec 2023 | Water |
Niland Gas Turbine Plant | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 88.4 GWh | May 2008 | Dec 2023 | Natural Gas |
Covanta Stanislaus Energy | Covanta Stanislaus Inc | Crows Landing, CA | California Independent System Operator (CISO) | 89.6 GWh | Aug 1988 | Aug 2024 | Non-biogenic Municipal Solid Waste : 51.5% Biogenic Municipal Solid Waste : 42.1% Distillate Fuel Oil : 6.4% |
Southeast Resource Recovery | SERRF Joint Powers Authority | Long Beach, CA | California Independent System Operator (CISO) | 89.9 GWh | Jun 1988 | Mar 2024 | Non-biogenic Municipal Solid Waste : 51.7% Biogenic Municipal Solid Waste : 42.3% Natural Gas : 6.1% |
Buena Vista Energy LLC | Leeward Asset Management, LLC | Byron, CA | California Independent System Operator (CISO) | 90.9 GWh | Nov 2006 | Dec 2023 | Wind |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 4 | 11.1 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Madera County, CA | # 29 | 26 | 1.3 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Plumas County, CA | # 27 | 13 | 1.8 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
Kern County, CA | # 1 | 293 | 32.9 TWh |