Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Five Points Solar Park | Five Points Solar Park, LLC | Five Points, CA | California Independent System Operator (CISO) | 107.7 GWh | Aug 2016 | Dec 2023 | Solar |
Blackwell Solar Park | Consolidated Edison Development Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 42.0 GWh | Dec 2018 | Dec 2023 | Solar |
Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 471.5 GWh | Nov 2019 | Jun 2024 | Solar |
Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 57.1 GWh | Dec 2015 | Dec 2022 | Solar |
Hecate Energy Beacon Solar 4 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 126.7 GWh | Nov 2016 | Jun 2024 | Solar |
Victor Mesa Linda D2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2023 | Solar |
Victor Mesa Linda E2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2023 | Solar |
SEPV Palmdale East | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 25.3 GWh | Jul 2015 | Dec 2023 | Solar |
California PV Energy at ISD WWTP | California PV Energy LLC | Oakley, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2014 | Dec 2023 | Solar |
Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 4.8 GWh | Jul 2014 | Dec 2023 | Solar |
Beacon Solar Plant Site 5 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 103.5 GWh | Nov 2017 | Jun 2024 | Solar |
Beacon Solar Plant Site 2 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 127.8 GWh | Nov 2017 | Jun 2024 | Solar |
Hecate Energy Beacon Solar 1 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 144.8 GWh | Mar 2017 | Jun 2024 | Solar |
Hecate Energy Beacon Solar 3 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 149.1 GWh | Nov 2016 | Jun 2024 | Solar |
Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 138.0 GWh | May 2020 | Jun 2024 | Solar |
Pumpjack Solar I | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 45.8 GWh | Dec 2014 | Dec 2023 | Solar |
Sacramento (SMUD) | Terraform Arcadia | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.2 GWh | Jul 2014 | Dec 2023 | Solar |
Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 46.9 GWh | Jul 2015 | Dec 2023 | Solar |
Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 225.2 GWh | Oct 2015 | Dec 2023 | Solar |
SCE-Snowline-Duncan Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.4 GWh | Sep 2014 | Dec 2023 | Solar |
SCE-Snowline-Duncan Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2014 | Dec 2023 | Solar |
Wildwood Solar I, LLC | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 46.7 GWh | Jan 2015 | Dec 2023 | Solar |
Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 2014 | Dec 2023 | Solar |
Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 51.3 GWh | Apr 2015 | Dec 2022 | Solar |
Colon PV | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 1.5 GWh | Nov 2015 | Dec 2023 | Solar |
Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.5 GWh | Apr 2016 | Nov 2023 | Solar |
Seville 1 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 53.8 GWh | Nov 2015 | Nov 2023 | Solar |
Seville 2 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 86.6 GWh | Nov 2015 | Dec 2023 | Solar |
SEPV 18 | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 5.3 GWh | Dec 2015 | Dec 2023 | Solar |
Aspiration G | AES Distributed Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 21.1 GWh | Aug 2017 | Dec 2023 | Solar |
Citizen B | AES Distributed Energy | Mendota, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2015 | Dec 2023 | Solar |
Lancaster WAD B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 5.2 GWh | Mar 2017 | Dec 2023 | Solar |
SEPV Mojave West | AES Distributed Energy | Mojave, CA | California Independent System Operator (CISO) | 53.5 GWh | May 2016 | Dec 2023 | Solar |
DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2014 | Dec 2023 | Solar |
CDCR (CA) - Pleasant Valley State Prison | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 2.2 GWh | Jun 2014 | Dec 2023 | Solar |
Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 3.9 GWh | Apr 2015 | Dec 2023 | Solar |
Springbok Solar Farm 2 | 63SU 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 421.9 GWh | Aug 2016 | Dec 2023 | Solar |
Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 58.5 GWh | Mar 2016 | Dec 2023 | Solar |
Little Bear Solar 1, LLC | Little Bear Solar 1, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 86.0 GWh | Nov 2020 | Jun 2024 | Solar |
UC Davis South Campus | Solar Star California XXXII, LLC | Davis, CA | California Independent System Operator (CISO) | 24.4 GWh | Feb 2015 | Dec 2023 | Solar |
Windhub Solar A LLC | EDP Renewables North America LLC | Mojave, CA | California Independent System Operator (CISO) | 46.4 GWh | Nov 2019 | Dec 2023 | Solar |
North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 419.7 GWh | May 2019 | Jun 2024 | Solar |
Corcoran Solar 3 | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 51.4 GWh | Jan 2016 | Dec 2023 | Solar |
Oro Loma | Consolidated Edison Development Inc. | Oro Loma, CA | California Independent System Operator (CISO) | 27.5 GWh | Dec 2016 | Dec 2023 | Solar |
SunE- E Philadelphia Ontario | SunEdison LLC | Ontario, CA | California Independent System Operator (CISO) | 1.2 GWh | Feb 2016 | Dec 2023 | Solar |
Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 1.2 GWh | Mar 2015 | Dec 2023 | Solar |
Springbok Solar Farm 1 | 62SK 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 304.3 GWh | Jun 2016 | Dec 2023 | Solar |
Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.5 GWh | Dec 2014 | Dec 2023 | Solar |
Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.6 GWh | Dec 2014 | Dec 2023 | Solar |
Park Meridian #1 | Altus Power America Management, LLC | Riverside, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2015 | Dec 2023 | Solar |
Rancho Cucamonga Dist #1 | Altus Power America Management, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2015 | Dec 2023 | Solar |
Terra Francesco | Altus Power America Management, LLC | Ontario, CA | California Independent System Operator (CISO) | 1.7 GWh | Feb 2015 | Dec 2023 | Solar |
Putah Creek Solar Farm | Solvida Energy Group/Blue Oak Energy | Winters, CA | California Independent System Operator (CISO) | 5.4 GWh | Nov 2014 | Dec 2022 | Solar |
Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 49.7 GWh | Feb 2015 | Dec 2023 | Solar |
Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 4.9 GWh | May 2015 | Dec 2022 | Solar |
Victor Mesa Linda C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 2.2 GWh | Oct 2014 | Dec 2023 | Solar |
Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 31.1 GWh | Aug 2016 | Dec 2023 | Solar |
Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 45.5 GWh | Aug 2016 | Dec 2023 | Solar |
Maricopa West Solar PV, LLC | Onward Energy | Taft, CA | California Independent System Operator (CISO) | 42.4 GWh | Nov 2015 | Dec 2023 | Solar |
AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 28.9 GWh | Jul 2015 | Dec 2023 | Solar |
Kettleman Solar -Centaurus | EE Kettleman California LLC | Kettleman City, CA | California Independent System Operator (CISO) | 39.9 GWh | Jun 2015 | Dec 2023 | Solar |
Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 30.5 GWh | Apr 2015 | Dec 2023 | Solar |
Forever 21 Retail, Inc. | Los Angeles Department of Water & Power | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 2.3 GWh | Jan 2015 | Dec 2022 | Solar |
Nordhoff Place | Los Angeles Department of Water & Power | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 1.4 GWh | Aug 2014 | Dec 2023 | Solar |
Imperial Valley Solar Co (IVSC) 2, LLC | Onward Energy | Niland, CA | Imperial Irrigation District (IID) | 40.2 GWh | May 2015 | Dec 2023 | Solar |
Santa Fe Springs Rooftop Solar BLDG M | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2015 | Nov 2023 | Solar |
Expressway Solar B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.2 GWh | Apr 2014 | Dec 2023 | Solar |
Expressway Solar C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Dec 2023 | Solar |
Shasta Solar Farm | Ignite Solar Holdings LLC | Fall River Mills, CA | California Independent System Operator (CISO) | 6.5 GWh | Feb 2014 | Nov 2023 | Solar |
Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 29.2 GWh | Sep 2015 | Dec 2023 | Solar |
ASTI | Perpetual Energy Systems | Cloverdale, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2009 | Dec 2022 | Solar |
Beringer | Perpetual Energy Systems | Saint Helena, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2008 | Dec 2022 | Solar |
Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2023 | Solar |
Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 7.3 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2013 | Dec 2023 | Solar |
Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 9.4 GWh | Nov 2013 | Dec 2023 | Solar |
Expressway Solar A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2014 | Dec 2023 | Solar |
Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2015 | Dec 2023 | Solar |
2081 Terzian Solar Project | Solarenewal LLC | Reedley, CA | California Independent System Operator (CISO) | 2.1 GWh | Jan 2014 | Dec 2023 | Solar |
2127 Harris Solar Project | Solarenewal LLC | Live Oak, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2014 | Dec 2023 | Solar |
2097 Helton Solar Project | Solarenewal LLC | Merced, CA | California Independent System Operator (CISO) | 2.7 GWh | Mar 2014 | Dec 2023 | Solar |
Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2023 | Solar |
Intel Folsom Phase 2 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.8 GWh | Sep 2012 | Dec 2023 | Solar |
Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2023 | Solar |
White River Solar 2 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 54.3 GWh | Aug 2014 | Dec 2022 | Solar |
Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 243.7 GWh | Jul 2016 | Dec 2023 | Solar |
Orion Solar II | Orion Solar II, LLC | Arvin, CA | California Independent System Operator (CISO) | 19.0 GWh | May 2014 | Dec 2023 | Solar |
Western Antelope Dry Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 23.3 GWh | Nov 2016 | Dec 2023 | Solar |
Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2011 | Dec 2023 | Solar |
Sacramento Fairbain Water Treatment Plant | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.2 GWh | Jan 2013 | Dec 2023 | Solar |
Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 760.6 MWh | Dec 2013 | Dec 2023 | Solar |
Stateline Solar | Southern Power Co | Nipton, CA | California Independent System Operator (CISO) | 644.4 GWh | Nov 2015 | Dec 2023 | Solar |
Mira Loma | Costco Wholesale | Mira Loma, CA | California Independent System Operator (CISO) | 2.8 GWh | Oct 2011 | Dec 2023 | Solar |
Lost Hills/Blackwell | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 80.7 GWh | Mar 2015 | Dec 2023 | Solar |
North Star Solar | Southern Power Co | Mendota, CA | California Independent System Operator (CISO) | 141.7 GWh | May 2015 | Dec 2023 | Solar |
Orion Solar I | Orion Solar I LLC | Arvin, CA | California Independent System Operator (CISO) | 30.1 GWh | Mar 2014 | Dec 2023 | Solar |
RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 122.6 GWh | Nov 2014 | Dec 2023 | Solar |
North Bay Solar 1 | AES Distributed Energy | Fairfield, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2013 | Dec 2023 | Solar |
Lancaster Dry Farm Ranch B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 9.9 GWh | Oct 2014 | Dec 2023 | Solar |
Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.6 GWh | Apr 2014 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on June 2024 generation numbers.County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 283 | 36.2 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 25 | 1.5 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Glenn County, CA | # 55 | 2 | 8.3 GWh |