Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Roll Delano 2 | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 7.4 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Roll Delano | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 8.9 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Roll Lost Hills | Bloom Energy | Lost Hills, CA | California Independent System Operator (CISO) | 5.5 GWh | Nov 2012 | Dec 2023 | Natural Gas |
Xilinx San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.5 GWh | Jan 2012 | Dec 2023 | Natural Gas |
Honda Torrance | Bloom Energy | Torrance, CA | California Independent System Operator (CISO) | 762.0 MWh | Nov 2012 | Dec 2023 | Natural Gas |
Juniper Networks Sunnyvale | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 5.6 GWh | Nov 2012 | Dec 2023 | Natural Gas |
Foundation NWNA | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 23.0 GWh | Nov 2012 | Dec 2023 | Wind |
SEPV 1 | CVI CleanCapital Solar 1 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.0 GWh | Apr 2012 | Dec 2023 | Solar |
SEPV 2 | CVI CleanCapital Solar 1 LLC | Twentynine Palms, CA | California Independent System Operator (CISO) | 4.4 GWh | May 2012 | Dec 2023 | Solar |
Edwards Air Force Base | CleanCapital Holdings | Edwards, CA | California Independent System Operator (CISO) | 866.0 MWh | Nov 2011 | Dec 2023 | Solar |
Kern Oil & Refining Co | Kern Oil & Refining Co | Bakersfield, CA | California Independent System Operator (CISO) | 34.6 GWh | Sep 2002 | Aug 2024 | Natural Gas |
Foundation Cemex River Plant | Foundation CA Fund VI Manager LLC | Victorville, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2012 | Dec 2023 | Wind |
Foundation Cemex BMQ | Foundation CA Fund VI Manager LLC | Apple Valley, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2012 | Dec 2023 | Wind |
Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 712.0 MWh | Nov 2012 | Aug 2024 | Wind |
Foundation Wal-Mart Red Bluff | Foundation CA Fund VI Manager LLC | Red Bluff, CA | California Independent System Operator (CISO) | 1.8 GWh | Aug 2012 | Aug 2024 | Wind |
Foundation Cemex Madison | Foundation CA Fund V Manager, LLC | Madison, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2012 | Dec 2023 | Wind |
Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 9.6 GWh | Nov 2012 | Dec 2023 | Wind |
Life Technologies Carlsbad | Bloom Energy | Carlsbad, CA | California Independent System Operator (CISO) | 7.6 GWh | Jul 2012 | Dec 2023 | Natural Gas |
La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 89.3 MWh | Nov 2012 | Oct 2023 | Solar |
Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 2.9 GWh | Dec 2012 | Nov 2023 | Natural Gas |
Kaiser Downey | Bloom Energy 2009 PPA | Downey, CA | California Independent System Operator (CISO) | 5.3 GWh | May 2012 | Dec 2023 | Natural Gas |
Kaiser Ontario | Bloom Energy 2009 PPA | Ontario, CA | California Independent System Operator (CISO) | 2.6 GWh | Sep 2012 | Dec 2023 | Natural Gas |
RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 51.1 GWh | May 2013 | Dec 2023 | Solar |
TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Feb 2013 | Dec 2023 | Solar |
North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 386.6 GWh | Nov 2012 | Dec 2023 | Wind |
Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 4.7 GWh | Jan 2007 | Dec 2023 | Natural Gas |
CSUF Trigeneration | California State University at Fullerton | Fullerton, CA | California Independent System Operator (CISO) | 33.9 GWh | Sep 2010 | Aug 2024 | Natural Gas : 82.0% Solar : 18.0% |
Crafton Hills College Solar Farm | San Bernardino Comm College Dist | Yucaipa, CA | California Independent System Operator (CISO) | 55.0 MWh | May 2012 | Dec 2022 | Solar |
Arrache 4013 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2023 | Solar |
Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 23.8 GWh | Nov 2014 | Dec 2023 | Solar |
Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2015 | Dec 2023 | Solar |
Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.4 GWh | May 2015 | Dec 2023 | Solar |
Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 115.9 GWh | Jul 2014 | Aug 2024 | Landfill Gas |
Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 491.6 GWh | Jun 2013 | Dec 2023 | Solar |
Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 45.4 GWh | Jul 2012 | Dec 2023 | Natural Gas |
Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 31.5 GWh | Feb 2013 | Dec 2023 | Landfill Gas |
Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 30.9 GWh | Mar 2014 | Dec 2023 | Landfill Gas |
Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 32.1 GWh | Jan 2014 | Dec 2023 | Landfill Gas |
Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.4 GWh | Jul 2013 | Dec 2023 | Solar |
Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 9.3 GWh | Apr 2013 | Dec 2023 | Landfill Gas |
Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.2 GWh | Aug 2013 | Dec 2023 | Solar |
Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 2.1 GWh | Jun 2013 | Dec 2023 | Solar |
Rutan | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.6 GWh | Dec 2013 | Dec 2023 | Solar |
Vinam | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2013 | Dec 2023 | Solar |
Ma | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.2 GWh | Sep 2013 | Dec 2023 | Solar |
Horn | CD US Solar MT 2 LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Sep 2013 | Dec 2023 | Solar |
Watts 3115 | CD US Solar MT 2 LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 2013 | Dec 2023 | Solar |
McCoy Solar Energy Project Hybrid | McCoy Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 524.7 GWh | Jul 2015 | Dec 2023 | Solar |
Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 328.6 GWh | Sep 2013 | Dec 2023 | Solar |
RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.1 GWh | Dec 2013 | Dec 2023 | Solar |
Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2013 | Dec 2023 | Solar |
Taylor Farms Salinas | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 7.6 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2013 | Dec 2023 | Solar |
Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 2014 | Dec 2023 | Solar |
Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2013 | Dec 2023 | Solar |
Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 5.3 GWh | Dec 2013 | Dec 2023 | Solar |
Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 6.0 GWh | Dec 2013 | Dec 2023 | Solar |
G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 10.8 GWh | May 2013 | Dec 2023 | Landfill Gas |
Radiance Solar 4 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2023 | Solar |
Radiance Solar 5 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2013 | Mar 2023 | Solar |
Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.4 GWh | Feb 2013 | Dec 2023 | Solar |
Hayworth Solar | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 58.4 GWh | Nov 2015 | Dec 2023 | Solar |
Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2013 | Dec 2023 | Solar |
White River Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 45.3 GWh | Jun 2013 | Dec 2023 | Solar |
Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 34.7 GWh | Jul 2013 | Dec 2023 | Solar |
Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.4 GWh | May 2013 | Dec 2023 | Solar |
Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 10.0 GWh | Jun 2013 | Dec 2023 | Landfill Gas |
Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 868.6 GWh | Feb 2014 | Aug 2024 | Solar |
Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 701.3 GWh | Feb 2014 | Aug 2024 | Solar |
Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 336.5 GWh | Dec 2013 | Dec 2023 | Wind |
Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 247.6 GWh | Dec 2013 | Dec 2023 | Wind |
Colton Solar Two, LLC | Colton Solar Two, LLC | Colton, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2015 | Dec 2023 | Solar |
Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Dec 2014 | Dec 2023 | Solar |
Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Dec 2014 | Dec 2023 | Solar |
Park Meridian #1 | Altus Power America Management, LLC | Riverside, CA | California Independent System Operator (CISO) | 2.4 GWh | Feb 2015 | Dec 2023 | Solar |
Rancho Cucamonga Dist #1 | Altus Power America Management, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.5 GWh | Mar 2015 | Dec 2023 | Solar |
Terra Francesco | Altus Power America Management, LLC | Ontario, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2015 | Dec 2023 | Solar |
Putah Creek Solar Farm | Solvida Energy Group/Blue Oak Energy | Winters, CA | California Independent System Operator (CISO) | 5.2 GWh | Nov 2014 | Dec 2022 | Solar |
Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 47.7 GWh | Feb 2015 | Dec 2023 | Solar |
Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 25.9 GWh | May 2017 | Dec 2023 | Landfill Gas |
Colton Solar One, LLC | Colton Solar One, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 2.3 GWh | May 2015 | Dec 2023 | Solar |
Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 117.8 GWh | May 2020 | Aug 2024 | Solar |
Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 30.0 GWh | Aug 2016 | Dec 2023 | Solar |
Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 43.8 GWh | Aug 2016 | Dec 2023 | Solar |
Maricopa West Solar PV, LLC | Onward Energy | Taft, CA | California Independent System Operator (CISO) | 40.6 GWh | Nov 2015 | Dec 2023 | Solar |
AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 27.6 GWh | Jul 2015 | Dec 2023 | Solar |
Kettleman Solar -Centaurus | EE Kettleman California LLC | Kettleman City, CA | California Independent System Operator (CISO) | 37.7 GWh | Jun 2015 | Dec 2023 | Solar |
Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 28.6 GWh | Apr 2015 | Dec 2023 | Solar |
SPI Anderson 2 | Sierra Pacific Industries | Anderson, CA | California Independent System Operator (CISO) | 141.6 GWh | Jul 2015 | Dec 2023 | Wood/Wood Waste Solids : 99.8% |
Sun Harvest Solar NDP1 | Altus Power America Management, LLC | Dos Palos, CA | California Independent System Operator (CISO) | 3.7 GWh | Apr 2015 | Dec 2023 | Solar |
Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.4 GWh | Apr 2016 | Nov 2023 | Solar |
Q Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 27.0 MWh | Jun 2013 | Aug 2024 | Natural Gas |
SCE-Snowline-White Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.4 GWh | Oct 2014 | Dec 2023 | Solar |
SCE-Snowline-White Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.5 GWh | Oct 2014 | Dec 2023 | Solar |
SCE-Snowline-White Rd (Central) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.8 GWh | Oct 2014 | Dec 2023 | Solar |
Baker Creek Hydroelectric | Baker Station Associates, LP | Bridgeville, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2014 | Dec 2023 | Water |
Sierra Solar Greenworks | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 33.9 GWh | Oct 2015 | Dec 2023 | Solar |
Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 17.0 GWh | Jun 2015 | Dec 2023 | Solar |
Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 54.9 GWh | Aug 2015 | Dec 2023 | Solar |
TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 53.4 GWh | Oct 2014 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on August 2024 generation numbers.County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 293 | 32.9 TWh |
Los Angeles County, CA | # 2 | 290 | 21.0 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.4 TWh |
Riverside County, CA | # 6 | 158 | 13.7 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Sacramento County, CA | # 10 | 63 | 6.4 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
Monterey County, CA | # 13 | 29 | 5.1 TWh |
Santa Clara County, CA | # 14 | 73 | 4.8 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Orange County, CA | # 16 | 58 | 3.6 TWh |
Tuolumne County, CA | # 17 | 23 | 3.5 TWh |
Kings County, CA | # 18 | 54 | 3.5 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
El Dorado County, CA | # 26 | 15 | 1.8 TWh |
Plumas County, CA | # 27 | 13 | 1.8 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Aug 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 26 | 1.3 TWh |
Inyo County, CA | # 30 | 23 | 1.2 TWh |
Lake County, CA | # 31 | 10 | 904.8 GWh |
Amador County, CA | # 32 | 7 | 883.1 GWh |
Tulare County, CA | # 33 | 53 | 842.8 GWh |
Ventura County, CA | # 34 | 30 | 795.4 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Merced County, CA | # 36 | 25 | 774.2 GWh |
Calaveras County, CA | # 37 | 6 | 754.2 GWh |
Humboldt County, CA | # 38 | 10 | 493.4 GWh |
Trinity County, CA | # 39 | 5 | 383.8 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
San Benito County, CA | # 43 | 5 | 313.4 GWh |
Santa Barbara County, CA | # 44 | 18 | 303.3 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Yolo County, CA | # 46 | 15 | 237.1 GWh |
San Mateo County, CA | # 47 | 10 | 130.9 GWh |
San Francisco County, CA | # 48 | 10 | 77.0 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 68.1 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Mendocino County, CA | # 55 | 4 | 11.1 GWh |