Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 7.8 GWh | Feb 2020 | Dec 2022 | Natural Gas |
SEPV 2 | CVI CleanCapital Solar 1 LLC | Twentynine Palms, CA | California Independent System Operator (CISO) | 3.0 GWh | May 2012 | Dec 2022 | Solar |
Sol Orchard El Centro PV | Sol Orchard Imperial 1, LLC | El Centro, CA | Imperial Irrigation District (IID) | 45.3 GWh | Sep 2013 | Dec 2022 | Solar |
Sealed Air Madera Solar Project | Sealed Air Corporation | Madera, CA | California Independent System Operator (CISO) | 2.0 MWh | Apr 2022 | Dec 2022 | Solar |
Santa Rita Jail Hybrid | County of Alameda GSA | Dublin, CA | California Independent System Operator (CISO) | 14.4 GWh | Aug 2001 | Dec 2022 | Natural Gas : 82.3% Solar : 17.7% |
Sonoma California Geothermal | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 291.4 GWh | Nov 1983 | Dec 2022 | Geothermal |
SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2020 | Dec 2022 | Solar : 99.9% |
San Dimas | Metropolitan Water District of S CA | San Dimas, CA | California Independent System Operator (CISO) | 4.0 GWh | May 1981 | Dec 2022 | Water |
Stony Gorge | City of Santa Clara - (CA) | Elk Creek, CA | California Independent System Operator (CISO) | 4.6 GWh | Mar 1986 | Dec 2022 | Water |
Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 303.3 GWh | Nov 2012 | Dec 2022 | Wind |
Staples La Mirada, CA | SunE WF3-ST Holdings, LLC | La Mirada, CA | California Independent System Operator (CISO) | 571.1 MWh | Feb 2009 | Dec 2022 | Solar |
Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 2020 | Dec 2022 | Solar |
Shiloh III Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 291.8 GWh | Nov 2011 | Dec 2022 | Wind |
Santa Rosa Junior College Petaluma Solar | Sonoma County Junior College District | Petaluma, CA | California Independent System Operator (CISO) | 17.4 MWh | Jun 2018 | Dec 2022 | Solar |
SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2018 | Dec 2022 | Solar |
Sierra Pacific Quincy Facility | Sierra Pacific Industries | Quincy, CA | California Independent System Operator (CISO) | 184.7 GWh | Nov 1986 | Dec 2022 | Wood/Wood Waste Solids |
Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2018 | Dec 2022 | Solar |
Sand Bar Power Plant | Tri-Dam Power Authority | Stanislaus Ntl. Fores, CA | California Independent System Operator (CISO) | 71.7 GWh | Apr 1986 | Dec 2022 | Water |
SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2011 | Dec 2022 | Solar |
Shafter Solar LLC | Shafter Solar LLC | Bakersfield, CA | California Independent System Operator (CISO) | 51.3 GWh | Apr 2015 | Dec 2022 | Solar |
San Gabriel Hydro Project | Los Angeles County-San Gabriel | Azusa, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 1987 | Dec 2022 | Water |
Second Imperial Geothermal | ORCAL Geothermal, Inc | Heber, CA | Imperial Irrigation District (IID) | 159.6 GWh | May 1993 | Dec 2022 | Geothermal |
San Gorgonio Windplant WPP1993 | FPL Energy Operating Services, Inc. | North Palm Springs, CA | California Independent System Operator (CISO) | 170.5 GWh | Nov 2011 | Dec 2022 | Wind |
Sierra Pacific Sonora | Sierra Pacific Industries | Standard, CA | California Independent System Operator (CISO) | 42.6 GWh | Jan 2001 | Dec 2022 | Wood/Wood Waste Solids |
Spicer Meadow Project | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 10.1 GWh | Oct 1989 | Dec 2022 | Water |
SPI Anderson 2 | Sierra Pacific Industries | Anderson, CA | California Independent System Operator (CISO) | 129.5 GWh | Jul 2015 | Dec 2022 | Wood/Wood Waste Solids |
Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 57.1 GWh | Dec 2015 | Dec 2022 | Solar |
Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 425.5 GWh | Dec 2008 | Dec 2022 | Wind |
SunEdison Ironwood State Prison | SunE CPA CDC2 LLC | Blythe, CA | California Independent System Operator (CISO) | 494.5 MWh | Apr 2008 | Dec 2022 | Solar |
SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 2.2 GWh | Feb 2009 | Dec 2022 | Solar |
San Joaquin 2 | Pacific Gas & Electric Co. | North Fork, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 1917 | Feb 2023 | Water |
Spaulding 2 | Pacific Gas & Electric Co. | Emigrant Gap, CA | California Independent System Operator (CISO) | 7.9 GWh | Jun 1928 | Mar 2023 | Water |
Silveira Ranch Road Solar | Silveira Ranch Road Solar | Novato, CA | California Independent System Operator (CISO) | 6.0 GWh | Feb 2021 | Mar 2023 | Solar |
Solar Photovoltaic Project #22 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 363.5 MWh | Jul 2011 | Mar 2023 | Solar |
Solar Photovoltaic Project #18 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 1.2 GWh | Oct 2012 | Mar 2023 | Solar |
Solar Photovoltaic Project #16 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2015 | Mar 2023 | Solar |
Solar Photovoltaic Project #10 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 844.4 MWh | Dec 2012 | Mar 2023 | Solar |
Solar Photovoltaic Project #09 | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 642.5 MWh | Jul 2011 | Mar 2023 | Solar |
Solar Photovoltaic Project #08 | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 819.5 MWh | Jul 2011 | Mar 2023 | Solar |
Solar Photovoltaic Project #06 | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 751.3 MWh | Jul 2011 | Mar 2023 | Solar |
Solar Photovoltaic Project #48 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #33 | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 1.1 GWh | Dec 2014 | Apr 2023 | Solar |
Solar Photovoltaic Project #32 | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #28 | Southern California Edison Co | San Bernardino, CA | California Independent System Operator (CISO) | 2.1 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #27 | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 952.3 MWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #26 | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 5.0 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #23 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 1.3 GWh | Dec 2012 | Apr 2023 | Solar |
Solar Photovoltaic Project #17 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 2.9 GWh | Dec 2014 | Apr 2023 | Solar |
Solar Photovoltaic Project #15 | Southern California Edison Co | Fontana, CA | California Independent System Operator (CISO) | 1.6 GWh | Dec 2012 | Apr 2023 | Solar |
Solar Photovoltaic Project #13 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 2.2 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #11 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2015 | Apr 2023 | Solar |
Solar Photovoltaic Project #02 | Southern California Edison Co | Chino, CA | California Independent System Operator (CISO) | 549.6 MWh | Nov 2009 | Apr 2023 | Solar |
Solar Photovoltaic Project #07 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 2.7 GWh | Oct 2012 | Apr 2023 | Solar |
Solar Photovoltaic Project #03 | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 515.1 MWh | Feb 2011 | Apr 2023 | Solar |
Solar Photovoltaic Project #05 | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2012 | Apr 2023 | Solar |
Santa Ana 1 | Southern California Edison Co | Highlands, CA | California Independent System Operator (CISO) | 2.5 MWh | Dec 1898 | Aug 2023 | Water |
Sacramento Municipal Util Dist | Sacramento Municipal Util Dist | Sacramento, CA | California Independent System Operator (CISO) | 24.8 GWh | Jan 1985 | Aug 2023 | Water |
San Fernando | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 17.8 GWh | Sep 1922 | Oct 2023 | Water |
Scott Flat | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 5.6 GWh | Jan 1985 | Oct 2023 | Water |
SunE Rochester | SunE Solar XVI Lessor, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 1.1 GWh | Jul 2016 | Oct 2023 | Solar |
Shasta Solar Farm | Ignite Solar Holdings LLC | Fall River Mills, CA | California Independent System Operator (CISO) | 6.5 GWh | Feb 2014 | Nov 2023 | Solar |
Santa Fe Springs Rooftop Solar BLDG M | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.5 GWh | Feb 2015 | Nov 2023 | Solar |
Site 980 65 | Madera-Chowchilla Power Auth | Madera, CA | California Independent System Operator (CISO) | 6.4 GWh | Jan 1985 | Nov 2023 | Water |
Seville 1 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 53.8 GWh | Nov 2015 | Nov 2023 | Solar |
SEPV Mojave West | AES Distributed Energy | Mojave, CA | California Independent System Operator (CISO) | 53.5 GWh | May 2016 | Dec 2023 | Solar |
Sonora 1 | Greenbacker Renewable Energy Corporation | Jamestown, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2013 | Dec 2023 | Solar |
Sierra Nevada Brewing Co Hybrid | Sierra Nevada Brewing Co | Chico, CA | California Independent System Operator (CISO) | 10.0 GWh | Apr 2005 | Dec 2023 | Natural Gas : 76.2% Solar : 23.8% |
Solar Gen 2 Solar Facility | Southern Power Co | Calipatria, CA | California Independent System Operator (CISO) | 393.3 GWh | Oct 2014 | Dec 2023 | Solar |
Sacramento Fairbain Water Treatment Plant | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.2 GWh | Jan 2013 | Dec 2023 | Solar |
Stateline Solar | Southern Power Co | Nipton, CA | California Independent System Operator (CISO) | 644.4 GWh | Nov 2015 | Dec 2023 | Solar |
Summer Solar A2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | May 2014 | Dec 2023 | Solar |
Summer Solar B2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.4 GWh | May 2014 | Dec 2023 | Solar |
Summer Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2014 | Dec 2023 | Solar |
Summer Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 2.0 GWh | Jun 2014 | Dec 2023 | Solar |
Summer North Solar | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.6 GWh | Nov 2014 | Dec 2023 | Solar |
Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2015 | Dec 2023 | Solar |
SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2011 | Dec 2023 | Solar |
SEPV Palmdale East | AES Distributed Energy | Palmdale, CA | California Independent System Operator (CISO) | 25.3 GWh | Jul 2015 | Dec 2023 | Solar |
Sacramento (SMUD) | Terraform Arcadia | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.2 GWh | Jul 2014 | Dec 2023 | Solar |
SCE-Snowline-Duncan Road (North) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 3.4 GWh | Sep 2014 | Dec 2023 | Solar |
SCE-Snowline-Duncan Road (South) | SunEdison LLC | Phelan, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2014 | Dec 2023 | Solar |
San Diego - EMDF at San Diego | California PV Energy 3, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.0 GWh | Mar 2021 | Dec 2023 | Solar |
Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2018 | Dec 2023 | Solar |
Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.5 GWh | Jul 2016 | Dec 2023 | Solar |
Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 6.4 GWh | Feb 2017 | Dec 2023 | Solar |
SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.5 GWh | Nov 2019 | Dec 2023 | Solar |
Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.2 GWh | Jul 2019 | Dec 2023 | Solar |
SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2018 | Dec 2023 | Solar |
SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 4.0 GWh | Sep 2018 | Dec 2023 | Solar |
Sierra Pacific Industries (2042-RD) | Sierra Pacific Industries | Red Bluff, CA | California Independent System Operator (CISO) | 17.3 GWh | Apr 2020 | Dec 2023 | Solar |
SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2018 | Dec 2023 | Natural Gas |
Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2020 | Dec 2023 | Solar |
SB Water Reclamation Fuel Cell | San Bernardino Fuel Cell, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 10.3 GWh | May 2021 | Dec 2023 | Other Biomass Gas : 96.4% Natural Gas : 3.6% |
SCC - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.8 GWh | Feb 2014 | Dec 2023 | Natural Gas |
Sunny Cow Solar, LLC | Sunny Cow Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 847.0 MWh | Sep 2023 | Dec 2023 | Solar |
Scooby Solar, LLC | Scooby Solar, LLC | Famoso, CA | California Independent System Operator (CISO) | 927.0 MWh | Sep 2023 | Dec 2023 | Solar |
SEPV Cuyama Hybrid | SEPV Cuyama, LLC | New Cuyama, CA | California Independent System Operator (CISO) | 107.0 MWh | Nov 2023 | Dec 2023 | Solar |
Sheep Creek Community Solar Farm | Phelan Solar LLC | El Mirage, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2023 | Solar |
Sierra Pacific Chinese Camp | Sierra Pacific Industries | Chinese Camp, CA | California Independent System Operator (CISO) | 5.2 GWh | Feb 2022 | Dec 2023 | Solar |
Sacramento Point West Medical Offices | KP Sacramento Point West Medical Offices Solar, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Oct 2020 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on June 2024 generation numbers.County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 283 | 36.2 TWh |
Los Angeles County, CA | # 2 | 290 | 22.6 TWh |
San Luis Obispo County, CA | # 3 | 19 | 20.8 TWh |
Contra Costa County, CA | # 4 | 48 | 15.6 TWh |
San Bernardino County, CA | # 5 | 196 | 14.7 TWh |
Riverside County, CA | # 6 | 158 | 13.9 TWh |
Imperial County, CA | # 7 | 81 | 10.9 TWh |
Fresno County, CA | # 8 | 100 | 8.7 TWh |
Shasta County, CA | # 9 | 46 | 7.7 TWh |
Sacramento County, CA | # 10 | 63 | 6.8 TWh |
Monterey County, CA | # 11 | 29 | 5.7 TWh |
San Diego County, CA | # 12 | 147 | 5.6 TWh |
Sonoma County, CA | # 13 | 24 | 5.5 TWh |
Santa Clara County, CA | # 14 | 73 | 4.9 TWh |
Butte County, CA | # 15 | 25 | 3.9 TWh |
Tuolumne County, CA | # 16 | 23 | 3.8 TWh |
Orange County, CA | # 17 | 58 | 3.7 TWh |
Kings County, CA | # 18 | 51 | 3.5 TWh |
Solano County, CA | # 19 | 39 | 3.2 TWh |
Colusa County, CA | # 20 | 3 | 3.2 TWh |
Alameda County, CA | # 21 | 42 | 3.0 TWh |
Stanislaus County, CA | # 22 | 24 | 2.6 TWh |
San Joaquin County, CA | # 23 | 39 | 2.5 TWh |
El Dorado County, CA | # 24 | 15 | 2.2 TWh |
Sutter County, CA | # 25 | 7 | 2.2 TWh |
Placer County, CA | # 26 | 21 | 2.1 TWh |
Plumas County, CA | # 27 | 13 | 1.9 TWh |
Yuba County, CA | # 28 | 4 | 1.9 TWh |
County | State Rank | Active Plants | Jun 2024 Generation |
---|---|---|---|
Madera County, CA | # 29 | 25 | 1.5 TWh |
Inyo County, CA | # 30 | 21 | 1.4 TWh |
Ventura County, CA | # 31 | 30 | 1.1 TWh |
Amador County, CA | # 32 | 7 | 987.8 GWh |
Calaveras County, CA | # 33 | 6 | 955.6 GWh |
Merced County, CA | # 34 | 23 | 920.0 GWh |
Tulare County, CA | # 35 | 53 | 910.8 GWh |
Mono County, CA | # 36 | 9 | 842.4 GWh |
Lake County, CA | # 37 | 10 | 805.0 GWh |
Humboldt County, CA | # 38 | 9 | 535.1 GWh |
Nevada County, CA | # 39 | 12 | 376.9 GWh |
Lassen County, CA | # 40 | 9 | 356.6 GWh |
Trinity County, CA | # 41 | 5 | 353.9 GWh |
San Benito County, CA | # 42 | 5 | 346.1 GWh |
Siskiyou County, CA | # 43 | 8 | 334.6 GWh |
Santa Barbara County, CA | # 44 | 18 | 287.3 GWh |
Yolo County, CA | # 45 | 14 | 266.4 GWh |
Mariposa County, CA | # 46 | 2 | 145.9 GWh |
San Mateo County, CA | # 47 | 10 | 143.3 GWh |
San Francisco County, CA | # 48 | 10 | 83.4 GWh |
Tehama County, CA | # 49 | 7 | 75.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 73.9 GWh |
Napa County, CA | # 51 | 7 | 52.8 GWh |
Sierra County, CA | # 52 | 3 | 30.5 GWh |
Marin County, CA | # 53 | 3 | 15.2 GWh |
Mendocino County, CA | # 54 | 4 | 11.2 GWh |
Glenn County, CA | # 55 | 2 | 8.3 GWh |