Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Bishop Creek 4 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 49.8 GWh | Aug 1905 | Dec 2023 | Water |
Bishop Creek 2 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 35.6 GWh | Oct 1908 | Dec 2023 | Water |
Bishop Creek 6 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 9.6 GWh | Feb 1913 | Dec 2023 | Water |
Bishop Creek 3 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 26.2 GWh | May 1913 | Dec 2023 | Water |
Big Creek 1 | Southern California Edison Co | Big Creek, CA | California Independent System Operator (CISO) | 393.8 GWh | Oct 1913 | Dec 2023 | Water |
Big Creek 2 | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 296.2 GWh | Nov 1913 | Dec 2023 | Water |
Bishop Creek 5 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 13.7 GWh | May 1919 | Dec 2023 | Water |
Big Creek 8 | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 152.9 GWh | Jul 1921 | Dec 2023 | Water |
Big Creek 3 | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 745.8 GWh | Aug 1923 | Sep 2024 | Water |
Big Pine Creek | Los Angeles Department of Water & Power | Big Pine, CA | Los Angeles Department of Water and Power (LDWP) | 9.0 GWh | Jun 1925 | Dec 2023 | Water |
Balch 1 | Pacific Gas & Electric Co. | Balch Camp, CA | California Independent System Operator (CISO) | 184.4 GWh | Jan 1927 | Dec 2023 | Water |
Bucks Creek | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 84.5 GWh | Feb 1928 | Sep 2023 | Water |
Big Creek 2A | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 536.5 GWh | Jul 1928 | Sep 2024 | Water |
Big Creek 4 | Southern California Edison Co | North Fork, CA | California Independent System Operator (CISO) | 428.0 GWh | May 1951 | Sep 2024 | Water |
Beardsley | Oakdale&South San Joaquin Irrigation D. | None, CA | California Independent System Operator (CISO) | 82.7 GWh | Apr 1957 | Dec 2023 | Water |
Balch 2 | Pacific Gas & Electric Co. | Balch Camp, CA | California Independent System Operator (CISO) | 489.7 GWh | Oct 1958 | Dec 2023 | Water |
Butt Valley | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 146.5 GWh | Nov 1958 | Dec 2023 | Water |
Belden | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 332.6 GWh | Aug 1969 | Sep 2024 | Water |
B Braun Medical | B Braun Medical Inc | Irvine, CA | California Independent System Operator (CISO) | 27.2 GWh | Oct 1982 | Dec 2023 | Natural Gas |
Bear Valley | City of Escondido - (CA) | Escondido, CA | California Independent System Operator (CISO) | 2.7 GWh | May 1986 | Dec 2023 | Water |
Box Canyon Dam | Siskiyou Power Authority | Mount Shasta, CA | PacifiCorp West (PACW) | 17.3 GWh | May 1986 | Dec 2023 | Water |
Bowman | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 15.3 GWh | Aug 1986 | Dec 2023 | Water |
Berry Cogen Tanne Hills 18 | Berry Petroleum Co | Maricopa, CA | California Independent System Operator (CISO) | 137.1 GWh | Nov 1986 | Sep 2024 | Natural Gas |
Berry Cogen | Berry Petroleum Co | Taft, CA | California Independent System Operator (CISO) | 16.9 GWh | Nov 1986 | Sep 2024 | Natural Gas |
Big Creek Water Works | Big Creek Water Works Ltd | Hyampom, CA | California Independent System Operator (CISO) | 10.6 GWh | Dec 1986 | Jun 2024 | Water |
Bidwell Ditch Project | Mega Renewables | Hat Creek, CA | California Independent System Operator (CISO) | 11.2 GWh | Feb 1987 | Dec 2023 | Water |
Black Butte | City of Santa Clara - (CA) | Orland, CA | California Independent System Operator (CISO) | 20.2 GWh | Aug 1988 | Dec 2023 | Water |
Burney Forest Products | Burney Forest Products, A Joint Venture | Burney, CA | California Independent System Operator (CISO) | 186.7 GWh | Sep 1989 | Dec 2023 | Wood/Wood Waste Solids : 96.1% Natural Gas : 3.9% |
Bear Creek | Central Rivers Power US, LLC | Shingletown, CA | California Independent System Operator (CISO) | 5.6 GWh | Dec 1989 | Dec 2023 | Water |
Burney Creek | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 6.2 GWh | Feb 1990 | Dec 2023 | Water |
Berry Placerita Cogen | Shadow Wolf Energy | Santa Clarita, CA | California Independent System Operator (CISO) | 30.9 GWh | Feb 1990 | Sep 2024 | Natural Gas |
Biola University Hybrid | Biola University | La Mirada, CA | California Independent System Operator (CISO) | 11.5 GWh | Mar 1990 | Sep 2024 | Natural Gas |
Badger Creek Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 20.6 GWh | Mar 1991 | Sep 2024 | Natural Gas |
Bear Mountain Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 41.9 GWh | Mar 1995 | Sep 2024 | Natural Gas |
Blacksand Generating Facility | Bridge Energy LLC | Brea, CA | California Independent System Operator (CISO) | 45.1 GWh | May 2000 | Dec 2023 | Natural Gas |
Blythe Energy Inc | AltaGas Blythe Operations Inc | Blythe, CA | California Independent System Operator (CISO) | 1.0 TWh | Nov 2003 | Sep 2024 | Natural Gas |
Bear Valley Power Plant | Bear Valley Electric Service | Big Bear Lake, CA | California Independent System Operator (CISO) | 1.9 GWh | Dec 2004 | Dec 2023 | Natural Gas |
Buena Vista Energy LLC | Leeward Asset Management, LLC | Byron, CA | California Independent System Operator (CISO) | 90.9 GWh | Nov 2006 | Dec 2023 | Wind |
Barre Peaker | Southern California Edison Co | Stanton, CA | California Independent System Operator (CISO) | 21.5 GWh | Aug 2007 | Nov 2023 | Natural Gas |
Broadridge Cogen | Broadridge Customer Communications | El Dorado Hills, CA | California Independent System Operator (CISO) | 19.3 GWh | Apr 2008 | Dec 2023 | Natural Gas : 93.5% Solar : 6.5% |
Bolthouse S&P and Rowen Farms Solar | MMA WBF Power LP | Palmdale, CA | California Independent System Operator (CISO) | 779.3 MWh | Oct 2008 | Mar 2023 | Solar |
Beringer | Perpetual Energy Systems | Saint Helena, CA | California Independent System Operator (CISO) | 1.3 GWh | Dec 2008 | Dec 2023 | Solar |
Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 1.2 GWh | Sep 2009 | Dec 2023 | Solar |
Bakersfield College Solar 01 | Kern Community College District | Bakersfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2010 | Dec 2022 | Solar |
Butte College Main Campus Solar | Butte-Glenn Community College District | Oroville, CA | California Independent System Operator (CISO) | 6.7 GWh | Jun 2011 | Dec 2023 | Solar |
Brookfield Tehachapi 1 | Coram California Development, L.P. | Mojave, CA | California Independent System Operator (CISO) | 220.4 GWh | Feb 2012 | Dec 2023 | Wind |
Brea Expansion Plant | Brea Power II | Brea, CA | California Independent System Operator (CISO) | 245.4 GWh | Oct 2012 | Sep 2024 | Landfill Gas |
Bear Creek Solar | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2014 | Dec 2023 | Solar |
Broadway 2 - UC Riverside | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 3.7 GWh | Aug 2014 | Dec 2023 | Solar |
Baker Creek Hydroelectric | Baker Station Associates, LP | Bridgeville, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2014 | Dec 2023 | Water |
Bakersfield 111 | Bakersfield 111 LLC | Bakersfield, CA | PacifiCorp West (PACW) | 2.3 GWh | Jun 2015 | Dec 2023 | Solar |
Blythe Solar 110, LLC | Blythe Solar 110, LLC | Blythe, CA | California Independent System Operator (CISO) | 584.2 GWh | Feb 2016 | Dec 2023 | Solar |
Bowerman Power LFG, LLC | Bowerman Power LFG, LLC | Irvine, CA | California Independent System Operator (CISO) | 161.1 GWh | Mar 2016 | Dec 2023 | Landfill Gas |
Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 331.9 GWh | Jun 2016 | Sep 2024 | Solar |
Beckton Dickenson - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 5.8 GWh | Jun 2016 | Dec 2023 | Natural Gas |
Building G | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.1 GWh | Aug 2016 | Dec 2023 | Solar |
Building F | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.2 GWh | Oct 2016 | Dec 2023 | Solar |
Buidling L | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 899.0 MWh | Oct 2016 | Dec 2023 | Solar |
Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2016 | Dec 2023 | Solar |
Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 71.7 GWh | Oct 2017 | Dec 2023 | Natural Gas |
Beacon Solar Plant Site 5 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 93.2 GWh | Nov 2017 | Sep 2024 | Solar |
Bakersfield Industrial PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2017 | Dec 2023 | Solar |
Bakersfield PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 6.7 GWh | Nov 2017 | Dec 2023 | Solar |
Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.6 GWh | Nov 2017 | Dec 2023 | Solar |
Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 44.9 GWh | Nov 2017 | Dec 2023 | Solar |
Beacon Solar Plant Site 2 | Arevon Asset Management | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 112.3 GWh | Nov 2017 | Sep 2024 | Solar |
Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 47.4 GWh | Nov 2017 | Dec 2023 | Solar |
Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 3.1 GWh | Aug 2018 | Dec 2023 | Solar |
Blackwell Solar Park | Consolidated Edison Development Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 40.1 GWh | Dec 2018 | Dec 2023 | Solar |
Blue Shld Of Cal- El Dorado Hlls Mtr B | Tesla Inc. | El Dorado Hills, CA | Balancing Authority of Northern California (BANC) | 3.0 GWh | Jun 2019 | Dec 2023 | Solar |
Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 346.5 GWh | Apr 2020 | Sep 2024 | Solar |
Borden Solar Farm | 41MB 8me, LLC | Madera, CA | California Independent System Operator (CISO) | 117.4 GWh | May 2020 | Sep 2024 | Solar |
Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 302.6 GWh | Oct 2020 | Sep 2024 | Solar |
Big Bear | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 7.9 GWh | Nov 2020 | Dec 2023 | Solar |
Blackjack Solar | South County Packing | King City, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2020 | Dec 2023 | Solar |
Bodega Avenue Solar LLC | Bodega Avenue Solar LLC | Petaluma, CA | California Independent System Operator (CISO) | 4.1 GWh | Dec 2020 | Dec 2023 | Solar |
Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.3 GWh | Sep 2021 | Dec 2023 | Solar |
BBARWA | Distributed Solar Development, LLC | Big Bear, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2021 | Dec 2023 | Solar |
Blue Skies Solar, LLC | Blue Skies Solar, LLC | Arvin, CA | PacifiCorp West (PACW) | 1.9 GWh | Nov 2021 | Dec 2023 | Solar |
BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 311.5 GWh | Jan 2022 | Sep 2024 | Solar |
Bishop Ranch - BR 1-Y | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2022 | Dec 2023 | Solar |
Byron Highway Solar | RPCA Solar 3, LLC | Byron, CA | California Independent System Operator (CISO) | 12.8 GWh | Oct 2022 | Dec 2023 | Solar |
Blythe Mesa Solar II | Blythe Mesa Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 544.2 GWh | Nov 2022 | Sep 2024 | Solar |
BCE Los Alamitos 2 | Bright Canyon Energy | Los Alamitos, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2023 | Dec 2023 | Solar |
BCE Los Alamitos 1 | Bright Canyon Energy | Los Alamitos, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2023 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2024 generation numbers.County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Kern County, CA | # 1 | 293 | 33.2 TWh |
Los Angeles County, CA | # 2 | 290 | 21.3 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
San Bernardino County, CA | # 5 | 196 | 14.6 TWh |
Riverside County, CA | # 6 | 158 | 13.8 TWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Sacramento County, CA | # 10 | 63 | 6.5 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
Monterey County, CA | # 13 | 29 | 4.9 TWh |
Santa Clara County, CA | # 14 | 73 | 4.7 TWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Kings County, CA | # 16 | 54 | 3.6 TWh |
Orange County, CA | # 17 | 58 | 3.5 TWh |
Tuolumne County, CA | # 18 | 23 | 3.5 TWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
Plumas County, CA | # 26 | 13 | 1.8 TWh |
El Dorado County, CA | # 27 | 15 | 1.8 TWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |
County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Madera County, CA | # 30 | 26 | 1.2 TWh |
Lake County, CA | # 31 | 10 | 902.9 GWh |
Amador County, CA | # 32 | 7 | 866.5 GWh |
Tulare County, CA | # 33 | 53 | 818.8 GWh |
Ventura County, CA | # 34 | 30 | 817.1 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Calaveras County, CA | # 36 | 6 | 749.2 GWh |
Merced County, CA | # 37 | 25 | 704.1 GWh |
Humboldt County, CA | # 38 | 10 | 487.8 GWh |
Trinity County, CA | # 39 | 5 | 389.5 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Santa Barbara County, CA | # 43 | 18 | 317.8 GWh |
San Benito County, CA | # 44 | 5 | 313.0 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Yolo County, CA | # 46 | 15 | 226.6 GWh |
San Mateo County, CA | # 47 | 10 | 129.6 GWh |
San Francisco County, CA | # 48 | 10 | 76.9 GWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
Santa Cruz County, CA | # 50 | 6 | 64.7 GWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Mendocino County, CA | # 55 | 4 | 11.1 GWh |