Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
A G Wishon | Pacific Gas & Electric Co. | North Fork, CA | California Independent System Operator (CISO) | 16.1 GWh | Aug 1910 | Dec 2023 | Water |
ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2018 | Dec 2023 | Other Biomass Gas |
ABEC #3 dba Lakeview Dairy | ABEC #3 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 7.8 GWh | Jan 2018 | Dec 2023 | Other Biomass Gas |
ABEC #4 dba CE&S Dairy | ABEC #4 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2018 | Dec 2023 | Other Biomass Gas |
ABEC Bidart-Old River LLC | ABEC Bidart-Old River LLC | Bakersfield, CA | California Independent System Operator (CISO) | 16.0 GWh | Nov 2013 | Dec 2023 | Other Biomass Gas |
Abel Road Bioenergy | ACC Renewable Resources | Williams, CA | California Independent System Operator (CISO) | 17.3 GWh | Jun 2022 | Dec 2023 | Agricultural By-Products |
Adapture CA2, LLC | Adapture Renewables, Inc. | Orland, CA | PacifiCorp West (PACW) | 3.1 GWh | Feb 2016 | Dec 2023 | Solar |
Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 17.0 GWh | Jun 2015 | Dec 2023 | Solar |
Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 54.9 GWh | Aug 2015 | Dec 2023 | Solar |
Adelanto Solar Project | Los Angeles Department of Water & Power | Adelanto, CA | Los Angeles Department of Water and Power (LDWP) | 11.5 GWh | May 2012 | Apr 2023 | Solar |
Adera Solar | AES Distributed Energy | Chowchilla, CA | California Independent System Operator (CISO) | 27.4 GWh | Nov 2015 | Dec 2023 | Solar |
Adobe Solar | Southern Power Co | Arvin, CA | California Independent System Operator (CISO) | 39.0 GWh | Apr 2014 | Dec 2023 | Solar |
Aera San Ardo Cogen Facility | Aera Energy LLC-San Ardo | San Ardo, CA | California Independent System Operator (CISO) | 23.6 GWh | Jun 1989 | Dec 2023 | Natural Gas |
Aerojet I | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 5.9 GWh | Nov 2009 | Dec 2023 | Solar |
Aerojet II | Altus Power America Management, LLC | Rancho Cordova, CA | Balancing Authority of Northern California (BANC) | 3.7 GWh | May 2010 | Dec 2023 | Solar |
Aerolease | PCS Energy, LLC | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 1.9 GWh | Jul 2018 | Dec 2022 | Solar |
AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 2.6 TWh | Jan 2020 | Sep 2024 | Natural Gas |
AES Alamitos LLC | AES Alamitos LLC | Long Beach, CA | California Independent System Operator (CISO) | 167.2 GWh | Aug 1956 | Sep 2024 | Natural Gas |
AES Huntington Beach Energy Project | AES Huntington Beach Energy, LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 2.6 TWh | Jan 2020 | Sep 2024 | Natural Gas |
AES Huntington Beach LLC | AES Huntington Beach LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 75.9 GWh | May 1958 | Sep 2024 | Natural Gas |
AES Redondo Beach LLC | AES Redondo Beach LLC | Redondo Beach, CA | California Independent System Operator (CISO) | 256.2 GWh | Sep 1954 | Dec 2023 | Natural Gas |
Agnews Power Plant | OLS Energy-Agnews Inc. | San Jose, CA | California Independent System Operator (CISO) | 35.7 GWh | Oct 1990 | Dec 2023 | Natural Gas |
Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2022 | Dec 2023 | Solar |
AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 6.3 GWh | Aug 2018 | Dec 2023 | Natural Gas |
Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 10.2 GWh | May 2003 | Dec 2023 | Natural Gas |
Aidlin Geothermal Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 77.3 GWh | Apr 1989 | Dec 2023 | Geothermal |
Alameda | Northern California Power Agny | Alameda, CA | California Independent System Operator (CISO) | 3.9 GWh | Apr 1986 | Dec 2023 | Natural Gas |
Alamo | California Dept. of Water Resources | Pearblossom, CA | California Independent System Operator (CISO) | 91.3 GWh | Jun 1986 | Dec 2023 | Water |
Alamo Solar | Onward Energy | Oro Grande, CA | California Independent System Operator (CISO) | 43.7 GWh | Apr 2015 | Dec 2023 | Solar |
Algonquin Power Sanger LLC | Algonquin Power Sanger LLC | Sanger, CA | California Independent System Operator (CISO) | 8.3 GWh | Nov 2007 | Sep 2024 | Natural Gas |
Algonquin SKIC 10 Solar, LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 17.7 GWh | Dec 2016 | Dec 2023 | Solar |
Algonquin SKIC20 Solar LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 45.5 GWh | Apr 2015 | Dec 2023 | Solar |
Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 9.6 GWh | Aug 2023 | Dec 2023 | Solar |
Almond Power Plant | Turlock Irrigation District | Modesto, CA | Turlock Irrigation District (TIDC) | 188.4 GWh | Mar 1996 | Sep 2024 | Natural Gas |
Alpaugh 50 | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 71.7 GWh | Nov 2012 | Dec 2023 | Solar |
Alpaugh North | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 22.4 GWh | Nov 2012 | Dec 2023 | Solar |
Alpine Solar | Alpine Solar | Lancaster, CA | California Independent System Operator (CISO) | 161.0 GWh | Jan 2013 | Dec 2023 | Solar |
Alta Powerhouse | Pacific Gas & Electric Co. | Alta, CA | California Independent System Operator (CISO) | 2.5 GWh | Oct 1902 | Dec 2023 | Water |
Alta Wind Energy Center I | Alta Wind Energy Center I | Mojave, CA | California Independent System Operator (CISO) | 361.0 GWh | Dec 2010 | Dec 2023 | Wind |
Alta Wind Energy Center II | Alta Wind Energy Center II | Mojave, CA | California Independent System Operator (CISO) | 299.7 GWh | Dec 2010 | Dec 2023 | Wind |
Alta Wind Energy Center III | Alta Wind Energy Center III | Mojave, CA | California Independent System Operator (CISO) | 302.6 GWh | Jan 2011 | Dec 2023 | Wind |
Alta Wind Energy Center IV | Alta Wind Energy Center IV | Mojave, CA | California Independent System Operator (CISO) | 147.8 GWh | Mar 2011 | Dec 2023 | Wind |
Alta Wind Energy Center V | Alta Wind Energy Center V | Mojave, CA | California Independent System Operator (CISO) | 238.1 GWh | Mar 2011 | Dec 2023 | Wind |
Alta Wind VIII | Nextera Energy Resources | Mojave, CA | California Independent System Operator (CISO) | 186.4 GWh | Dec 2011 | Dec 2023 | Wind |
Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 336.5 GWh | Dec 2013 | Dec 2023 | Wind |
Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 247.6 GWh | Dec 2013 | Dec 2023 | Wind |
AltaGas Ripon Energy Inc. | AltaGas Ripon Energy Inc. | Ripon, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 1988 | Sep 2024 | Natural Gas |
Altamont Gas Recovery | WM Renewable Energy LLC | Livermore, CA | California Independent System Operator (CISO) | 39.4 GWh | Feb 1969 | Dec 2023 | Landfill Gas |
Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2023 | Solar |
Amazon - Patterson PV | AES Distributed Energy | Patterson, CA | Balancing Authority of Northern California (BANC) | 2.2 GWh | Apr 2017 | Dec 2023 | Solar |
Amazon PSP1 | Greenbacker Renewable Energy Corporation | Beaumont, CA | California Independent System Operator (CISO) | 7.5 GWh | Sep 2021 | Dec 2023 | Solar |
Amazon San Bernardino | Bloom Energy | San Bernardino, CA | California Independent System Operator (CISO) | 6.0 GWh | Oct 2014 | Dec 2022 | Natural Gas |
Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.6 GWh | Feb 2023 | Dec 2023 | Solar |
Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 16.0 GWh | Jan 2013 | Dec 2023 | Landfill Gas |
Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 32.6 GWh | Oct 2010 | Dec 2023 | Landfill Gas |
Ameresco Forward | Ameresco Forward, LLC | Manteca, CA | California Independent System Operator (CISO) | 32.1 GWh | Jan 2014 | Dec 2023 | Landfill Gas |
Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 9.3 GWh | Apr 2013 | Dec 2023 | Landfill Gas |
Ameresco Keller Canyon | AMERESCO Keller Canyon LLC | Bay Point, CA | California Independent System Operator (CISO) | 28.7 GWh | Jun 2009 | Dec 2023 | Landfill Gas |
Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 83.1 GWh | Nov 2008 | Sep 2024 | Landfill Gas |
Ameresco San Joaquin | Ameresco San Joaquin, LLC | Linden, CA | California Independent System Operator (CISO) | 30.9 GWh | Mar 2014 | Dec 2023 | Landfill Gas |
Ameresco Santa Cruz Energy | AMERESCO Santa Cruz Energy LLC | Watsonville, CA | California Independent System Operator (CISO) | 18.8 GWh | Dec 2005 | Dec 2023 | Landfill Gas |
Ameresco Vasco Road | Ameresco Vasco Road, LLC | Livermore, CA | California Independent System Operator (CISO) | 31.5 GWh | Feb 2013 | Dec 2023 | Landfill Gas |
American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.6 GWh | Aug 2019 | Dec 2023 | Solar |
American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 325.3 GWh | Nov 2020 | Sep 2024 | Solar |
Ampersand Chowchilla Biomass LLC | Ampersand Chowchilla Biomass LLC | Chowchilla, CA | California Independent System Operator (CISO) | 49.1 GWh | Apr 2008 | Mar 2023 | Wood/Wood Waste Solids : 99.8% |
Anaheim Solar Energy Plant | Anaheim Public Utilities | Anaheim, CA | California Independent System Operator (CISO) | 2.9 GWh | Jul 2014 | Dec 2023 | Solar |
Angels | Utica Water & Power Authority | Angels Camp, CA | California Independent System Operator (CISO) | 7.2 GWh | Dec 1939 | Dec 2023 | Water |
Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 3.6 GWh | Oct 2014 | Sep 2024 | Wind |
Anheuser Busch - Fairfield | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 21.6 GWh | Nov 2022 | Dec 2023 | Natural Gas |
Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.8 GWh | Jul 2016 | Dec 2023 | Solar |
Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 115.2 GWh | Nov 2016 | Sep 2024 | Solar |
Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.6 GWh | Nov 2016 | Dec 2023 | Solar |
Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 36.2 GWh | Aug 2019 | Dec 2023 | Solar |
Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.9 GWh | Oct 2022 | Dec 2023 | Solar |
Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 245.8 GWh | Nov 2018 | Sep 2024 | Solar |
Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 34.7 GWh | May 2021 | Dec 2023 | Solar |
Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.4 GWh | May 2021 | Dec 2023 | Solar |
AP North Lake I, LP | AP North Lake I, LP | Hemet, CA | California Independent System Operator (CISO) | 27.6 GWh | Jul 2015 | Dec 2023 | Solar |
APP Prune A-D | Bloom Energy | Cupertino, CA | California Independent System Operator (CISO) | 27.1 GWh | Apr 2017 | Dec 2023 | Natural Gas |
Apple Campus 2 Fuel Cell | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 25.9 GWh | May 2017 | Dec 2023 | Landfill Gas |
Apple Campus 2 PV | Apple, Inc | Cupertino, CA | California Independent System Operator (CISO) | 15.6 GWh | May 2017 | Dec 2023 | Solar |
Aquamarine | Aquamarine Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 409.5 GWh | Aug 2021 | Sep 2024 | Solar |
Argus Cogen Plant | Searles Valley Minerals Operations Inc. | Trona, CA | California Independent System Operator (CISO) | 254.2 GWh | Nov 1947 | Sep 2024 | Bituminous Coal : 90.5% Natural Gas : 9.5% |
Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 461.5 GWh | - | Sep 2024 | Solar |
Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 628.1 GWh | Feb 2022 | Sep 2024 | Solar |
Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 266.5 GWh | Jul 2022 | Sep 2024 | Solar |
Arrache 4006 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.4 GWh | Jul 2013 | Dec 2023 | Solar |
Arrache 4013 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2013 | Dec 2023 | Solar |
Arrache 8083 | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.2 GWh | Aug 2013 | Dec 2023 | Solar |
Aspiration G | AES Distributed Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 20.1 GWh | Aug 2017 | Dec 2023 | Solar |
ASTI | Perpetual Energy Systems | Cloverdale, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2009 | Dec 2023 | Solar |
AT&T Anaheim | Bloom Energy | Anaheim, CA | California Independent System Operator (CISO) | 8.3 GWh | Aug 2016 | Dec 2023 | Natural Gas |
AT&T - Gardena | Bloom Energy | Gardena, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2013 | Dec 2023 | Natural Gas |
AT&T - Hawthorne | Bloom Energy | Hawthorne, CA | California Independent System Operator (CISO) | 5.8 GWh | Sep 2016 | Dec 2023 | Natural Gas |
AT&T - Hayward | Bloom Energy | Hayward, CA | California Independent System Operator (CISO) | 7.1 GWh | Oct 2016 | Dec 2023 | Natural Gas |
AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.2 GWh | May 2016 | Dec 2023 | Natural Gas |
AT&T - Redwood City | Bloom Energy | Redwood City, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2013 | Dec 2023 | Natural Gas |
AT&T San Diego | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 3.5 GWh | Feb 2015 | Dec 2023 | Natural Gas |
AT&T - San Diego Trade Street | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 6.5 GWh | Feb 2016 | Dec 2023 | Natural Gas |
Atascadero State Hospital | Ecoplexus, Inc | Atascadero, CA | California Independent System Operator (CISO) | 2.8 GWh | Jul 2020 | Dec 2023 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2024 generation numbers.County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Alameda County, CA | # 21 | 43 | 2.7 TWh |
Amador County, CA | # 32 | 7 | 866.5 GWh |
Butte County, CA | # 15 | 25 | 4.1 TWh |
Calaveras County, CA | # 36 | 6 | 749.2 GWh |
Colusa County, CA | # 19 | 3 | 3.1 TWh |
Contra Costa County, CA | # 4 | 50 | 14.9 TWh |
El Dorado County, CA | # 27 | 15 | 1.8 TWh |
Fresno County, CA | # 8 | 104 | 8.5 TWh |
Glenn County, CA | # 53 | 2 | 16.5 GWh |
Humboldt County, CA | # 38 | 10 | 487.8 GWh |
Imperial County, CA | # 7 | 83 | 10.3 TWh |
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Kern County, CA | # 1 | 293 | 33.2 TWh |
Kings County, CA | # 16 | 54 | 3.6 TWh |
Lake County, CA | # 31 | 10 | 902.9 GWh |
Lassen County, CA | # 41 | 9 | 339.7 GWh |
Los Angeles County, CA | # 2 | 290 | 21.3 TWh |
Madera County, CA | # 30 | 26 | 1.2 TWh |
Marin County, CA | # 54 | 3 | 12.9 GWh |
Mariposa County, CA | # 45 | 2 | 296.6 GWh |
Mendocino County, CA | # 55 | 4 | 11.1 GWh |
Merced County, CA | # 37 | 25 | 704.1 GWh |
Mono County, CA | # 35 | 9 | 794.9 GWh |
Monterey County, CA | # 13 | 29 | 4.9 TWh |
Napa County, CA | # 51 | 7 | 48.3 GWh |
Nevada County, CA | # 40 | 12 | 356.1 GWh |
Orange County, CA | # 17 | 58 | 3.5 TWh |
Placer County, CA | # 23 | 21 | 2.4 TWh |
County | State Rank | Active Plants | Sep 2024 Generation |
---|---|---|---|
Plumas County, CA | # 26 | 13 | 1.8 TWh |
Riverside County, CA | # 6 | 158 | 13.8 TWh |
Sacramento County, CA | # 10 | 63 | 6.5 TWh |
San Benito County, CA | # 44 | 5 | 313.0 GWh |
San Bernardino County, CA | # 5 | 196 | 14.6 TWh |
San Diego County, CA | # 11 | 148 | 5.6 TWh |
San Francisco County, CA | # 48 | 10 | 76.9 GWh |
San Joaquin County, CA | # 24 | 40 | 2.3 TWh |
San Luis Obispo County, CA | # 3 | 20 | 19.0 TWh |
San Mateo County, CA | # 47 | 10 | 129.6 GWh |
Santa Barbara County, CA | # 43 | 18 | 317.8 GWh |
Santa Clara County, CA | # 14 | 73 | 4.7 TWh |
Santa Cruz County, CA | # 50 | 6 | 64.7 GWh |
Shasta County, CA | # 9 | 46 | 6.9 TWh |
Sierra County, CA | # 52 | 3 | 28.6 GWh |
Siskiyou County, CA | # 42 | 8 | 321.3 GWh |
Solano County, CA | # 20 | 40 | 3.0 TWh |
Sonoma County, CA | # 12 | 24 | 5.1 TWh |
Stanislaus County, CA | # 22 | 24 | 2.5 TWh |
Sutter County, CA | # 25 | 7 | 2.0 TWh |
Tehama County, CA | # 49 | 7 | 71.4 GWh |
Trinity County, CA | # 39 | 5 | 389.5 GWh |
Tulare County, CA | # 33 | 53 | 818.8 GWh |
Tuolumne County, CA | # 18 | 23 | 3.5 TWh |
Ventura County, CA | # 34 | 30 | 817.1 GWh |
Yolo County, CA | # 46 | 15 | 226.6 GWh |
Yuba County, CA | # 28 | 4 | 1.6 TWh |